My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
>
Address Records
>
18TH AVE W
>
9502
>
UNIT Q
>
Plans
>
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 8:32:43 AM
Creation date
2/3/2025 2:26:40 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT Q
Permit
B2310-030
Year
2023
Notes
NEW SFR - REFRB2306-005 - UNIT Q
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAWLSPA <br />VENT PER ARCH' <br />SEE 20IS07 T` <br />BELOW PORCH SLAB <br />(SEE S02) <br />ER S02 <br />VLSPACE <br />ACCESS <br />R ARCH'L <br />TYP END <br />ALL FRAMING OR HARDWARE <br />NOT SHOWN OR SPECIFIED <br />TO REMAIN UNCHANGED <br />VWWWWWWAW <br />8 II <br />SLAB -ON -GRADE - <br />PER S02 <br />PORCH FNDN WALLS <br />BELOW PORCH SLAB <br />(SEE S02) <br />EXTENDED FRONT PORCH OPTION - ELEV. B' <br />FLOOR FRAMING PLAN NOTES: <br />1. Floor Sheathiny shall be'/." thick T&G (Panel Span Rating 41V14), Glue Sheathing to ali Framing MwnGers antl Blocgng below <br />with atlhes-conforming to A.P.A.Specification AFGOt. Fasten Sheathing to Framing with 0.131"0 x 2Y_." Nails or Simpson WSV <br />#9x2y" screws as follows: <br />Framing, Edges 6"oc <br />Framing, Field 10"oc <br />Boundaries, Blocking, Struts fi"oc <br />See Drawings far other Sheathing Nailing requirements. <br />2. Floor Framing shall be as indicated on plan. Refer to General S1—haral Notes for other requirements. <br />3. See t0/S06 for Simpson to USP hardware conversion table. <br />LEGEND <br />� DETAIL CALL-0UT <br />SX.X <br />SHEAR WALL BELOW PER SCHEDULE OF 1/S06 <br />Q SILL PLATE BELOW <br />L _ _ _ I BEARING OR SHEAR WALL ABOVE <br />FOUNDATION WALL BELOW <br />RAISED FOUNDATION WALL <br />(F) FLUSH FRAMED (BOTTOM FLUSH VJI BOTTOM OF FRAMING) <br />POST BELOW <br />PT, ED. BLOCK THRU FLOOR FOR POST ABOVE <br />0 1 2 4 8 16 <br />114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.