Laserfiche WebLink
RIDGE <br />UPPER PLATE <br />NON HDR5 <br />MAIN <br />REAR ELE✓A- IB' <br />ELEVATION NOTE5: <br />I. CONTRACTOR SHALL VERIFY ALL NOTES, MATERIALS 4 CONDITIONS PRIOR TO <br />CONSTRUCTION. <br />2. CAULK ALL EXTERIOR JOINTS 4 PENETRATIONS. <br />3. PROVIDE GALVANIZED OR ANODIZED SHEET METAL FLASHING 4 COUNTER <br />FLASHING @ ALL ROOF PENETRATIONS, CHIMNEYS 4 SKYLIGHTS. <br />4. PROVIDE CONTINUOUS GUTTERS 4 DOWNSPOUT5 @ ALL EAVES, TYP. <br />S. PROVIDE HEADER FLASHING @ ALL DOORS, WINDOWS 4 SHUTTERS PER DETAIL <br />6. ALL PAPER AND TAPE TO LAP FROM TOP DOWN <br />7. HOLD ALL SIDING MATERIAL IV' OFF ROOF <br />6. HOLD ALL SIDING MATERIAL 6" OFF FINISHED GRADE <br />9. SOFFIT ALL FLAT AREAS w/ lkz" OVERHANG @ HORIZ. EDGES <br />!0. METAL FLASHING @ ALL HORIZ. TRIM 4 SIDING BREAKS <br />I. RUN 2ND LAYER OF TAR PAPER VERT. @ INTERIOR 4 EXTERIOR CORNERS <br />UNLESS TAR PAPER 15 CONTINUOUS <br />12. FOUNDATION VENTS TO BE SPACED PER PLAN <br />!3. ALL FOUNDATION VENTS ON STREET SIDE OF HOUSE I.E. FRONT 4/OR SIDE 4 <br />GABLE END 4 GARAGE FRESH AIR VENTS TO BE LOUVERED <br />'A. EXTERIOR LIGHT BLOCKS AT ALL FRONT ENTRY'S SHALL BE INSTALLED AT <br />T-0 A.F.F. <br />5. THE TOP OF THE EXTERIOR LIGHT BLOCKS AT GARAGE SHALL ALIGN WITH <br />TOP OF THE GARAGE DOOR TRIM <br />!6. ALL LIGHT BLOCKS ON STONE FACADE TO BE FURRED OUT AN ADDITIONAL V2" <br />A. GUTTERS TO LAP UNDER DRIP EDGE @ EAVES. HOLD O� DRIP EDGE OUT Y" <br />AWAY FROM FASCIA TO ACCEPT GUTTERS TO LAP UNDERNEATH <br />22. ALL TRIM WORK TO BE APPLIED PRIOR TO SIDING MATERIALS (SIDING TO <br />BUTT UP TO TRIM WORK) <br />3. CEILING OF EXTERIOR BACK DECK TO BE FLAT. <br />RIDGE <br />WON HE <br />UPPER I <br />MAIN FL <br />SIDE ELEVATION 'B' <br />SCALE: 1/4" = 1P-0' <br />SECTION A -A <br />SCALE: 1/4" = 1'-0" <br />REAR <br />