My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 59 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-08.0(2).RTF 1 <br />Add the following new section: 2 <br /> 3 <br />1-08.0(2) Hours of Work 4 <br />(December 8, 2014 APWA GSP) 5 <br /> 6 <br />Except in the case of emergency or unless otherwise approved by the Engineer, the 7 <br />normal working hours for the Contract shall be any consecutive 8 -hour period between 8 <br />7:00 a.m. and 6:00 p.m. Monday through Friday, exclusive of a lunch break. If the 9 <br />Contractor desires different than the normal working hours stated above, the request 10 <br />must be submitted in writing prior to the preconstruction conference, subject to the 11 <br />provisions below. The working hours for the Contract shall be established at or prior to 12 <br />the preconstruction conference. 13 <br /> 14 <br />All working hours and days are also subject to local permit and ordinance conditions (such 15 <br />as noise ordinances). 16 <br /> 17 <br />If the Contractor wishes to deviate from the established working hours, the Contractor 18 <br />shall submit a written request to the Engineer for consideration. This request shall state 19 <br />what hours are being requested, and why. Requests shall be submitted for review no 20 <br />later than ***72 hours for day work and 30 days for night work*** prior to the day(s) the 21 <br />Contractor is requesting to change the hours. 22 <br /> 23 <br />If the Contracting Agency approves such a deviation, such approval may be subject to 24 <br />certain other conditions, which will be detailed in writing. For example: 25 <br />1. On non-Federal aid projects, requiring the Contractor to reimburse the 26 <br />Contracting Agency for the costs in excess of straight -time costs for Contracting 27 <br />Agency representatives who worked during such times. (The Engineer may 28 <br />require designated representatives to be present during the work. 29 <br />Representatives who may be deemed necessary by the Engineer include, but are 30 <br />not limited to: survey crews; personnel from the Contracting Agency’s material 31 <br />testing lab; inspectors; and other Contracting Agency employees or third party 32 <br />consultants when, in the opinion of the Engineer, such work necessitates their 33 <br />presence.) 34 <br />2. Considering the work performed on Saturdays, Sundays, and holidays as working 35 <br />days with regard to the contract time. 36 <br />3. Considering multiple work shifts as multiple working days with respect to contract 37 <br />time even though the multiple shifts occur in a single 24 -hour period. 38 <br />4. If a 4-10 work schedule is requested and approved the non working day for the 39 <br />week will be charged as a working day. 40 <br />5. If Davis Bacon wage rates apply to this Contract, all requirements must be met 41 <br />and recorded properly on certified payroll 42 <br /> 43 <br />1-08.1.OptionA.RTF 44 <br /> 1-08.1 Subcontracting 45 <br />(December 30, 2022 APWA GSP, Option A) 46 <br /> 47 <br />Section 1-08.1 is supplemented with the following: 48 <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.