My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 60 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor 1 <br />shall submit to the Engineer a certification (WSDOT Form 420 -004) that a written 2 <br />agreement between the Contractor and the subcontractor or between the subcontractor 3 <br />and any lower tier subcontractor has been executed. This certification shall also 4 <br />guarantee that these subcontract agreements include all the documents required by the 5 <br />Special Provision Federal Agency Inspection. 6 <br /> 7 <br />A subcontractor or lower tier subcontractor will not be permitted to perform any work 8 <br />under the contract until the following documents have been completed and submitted to 9 <br />the Engineer: 10 <br /> 11 <br />1. Request to Sublet Work (WSDOT Form 421-012), and 12 <br /> 13 <br />2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal -14 <br />aid Projects (WSDOT Form 420-004). 15 <br /> 16 <br />The Contractor shall submit to the Engineer a completed Monthly Retainage Report 17 <br />(WSDOT Form 272-065) within 15 calendar days after receipt of every monthly progress 18 <br />payment until every subcontractor and lower tier subcontractor’s retainage has been 19 <br />released. 20 <br /> 21 <br />The Contractor's records pertaining to the requirements of this Special Provision shall be 22 <br />open to inspection or audit by representatives of the Contracting Agency during the life of 23 <br />the contract and for a period of not less than three years after the date of acceptance of 24 <br />the contract. The Contractor shall retain these records for that period. The Contractor 25 <br />shall also guarantee that these records of all subcontractors and lower tier 26 <br />subcontractors shall be available and open to similar inspection or audit for the same 27 <br />time period. 28 <br /> 29 <br />1-08.1(7).GR1 30 <br />Payments to Subcontractors and Lower-Tier Subcontractors 31 <br /> 32 <br />1-08.1(7)A.OPT1.2025.GR1 33 <br />(July 2, 2024) 34 <br />The Contractor shall report the actual amounts paid to all firms that were used 35 <br />as subcontractors of any tier, materials suppliers, manufacturers, regular 36 <br />dealers, or service providers on the Contract, including all Disadvantaged, 37 <br />Minority, Small, Veteran, or Women’s Business Enterprise firms. The following 38 <br />do not need reported: (1) retail sales or services that are paid for at the time of 39 <br />purchase; (2) payments to materials suppliers or manufacturers that are in 40 <br />normal course of business. The Contractor shall report this information by 41 <br />entering it into the Contracting Agency’s Diversity Management and Compliance 42 <br />System at: https://wsdot.diversitycompliance.com. Payments shall be reported 43 <br />no later than the 20th of the month for all payments made to firms during the 44 <br />previous calendar month. For example, the Contractor shall enter all payments 45 <br />made to firms during the month of March into DMCS by April 20 th. Payments 46 <br />shall be reported between execution of the Contract and the Contract 47 <br />Completion Date. When no Work occurred or no payments were made for a firm, 48 <br />the reported payment shall be zero. 49 <br /> 50
The URL can be used to link to this page
Your browser does not support the video tag.