Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 62 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-08.4.RTF 1 <br />1-08.4 Prosecution of Work 2 <br /> 3 <br />Delete this section and replace it with the following: 4 <br /> 5 <br />1-08.4 Notice to Proceed and Prosecution of Work 6 <br />(July 23, 2015 APWA GSP) 7 <br /> 8 <br />Notice to Proceed will be given after the contract has been executed and the contract 9 <br />bond and evidence of insurance have been approved and filed by the Contracting 10 <br />Agency. The Contractor shall not commence with the work until the Notice to Proceed 11 <br />has been given by the Engineer. The Contractor shall commence construction activities 12 <br />on the project site within ten days of the Notice to Proceed Date, unless otherwise 13 <br />approved in writing. The Contractor shall diligently pursue the work to the physical 14 <br />completion date within the time specified in the contract. Voluntary shutdown or slowing 15 <br />of operations by the Contractor shall not relieve the Contractor of the responsibility to 16 <br />complete the work within the time(s) specified in the contract. 17 <br /> 18 <br />When shown in the Plans, the first order of work shall be the installation of high visibility 19 <br />fencing to delineate all areas for protection or restoration, as described in the Contract. 20 <br />Installation of high visibility fencing adjacent to the roadway shall occur after the 21 <br />placement of all necessary signs and traffic control devices in accordance with 1 -10.1(2). 22 <br />Upon construction of the fencing, the Contractor shall request the Engineer to inspect the 23 <br />fence. No other work shall be performed on the site until the Contracting Agency has 24 <br />accepted the installation of high visibility fencing, as described in the Contract. 25 <br /> 26 <br />1-08.5.GR1 27 <br />Time for Completion 28 <br /> 29 <br />1-08.5.INST2.GR1 30 <br />Section 1-08.5 is supplemented with the following: 31 <br /> 32 <br />F1-08.5.OPT7.DOCX 33 <br />(March 13, 1995) 34 <br />This project shall be physically completed within *** forty eight (48) *** working days. 35 <br /> 36 <br />1-08.5.OptionA.RTF 37 <br />1-08.5 Time for Completion 38 <br />(December 30, 2022 APWA GSP, Option A) 39 <br /> 40 <br /> 41 <br />Revise the third and fourth paragraphs to read: 42 <br /> 43 <br />Contract time shall begin on the first working day following the Notice to Proceed Date. 44 <br /> 45 <br />Each working day shall be charged to the contract as it occurs, until the contract work is 46 <br />physically complete. If substantial completion has been granted and all the authorized 47 <br />working days have been used, charging of working days will cease. Each week the 48 <br />Engineer will provide the Contractor a statement that shows the number of working days: 49 <br />(1) charged to the contract the week before; (2) specified for the physical completion of 50 <br />the contract; and (3) remaining for the physical completion of the contract. The statement 51 <br />will also show the nonworking days and all partial or whole days the Engineer declares 52