<br />Fulton Street Pedestrian Bicycle Corridor PAGE 61 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-08.1(7)C.GR1 1 <br />Subcontractor Retainage 2 <br /> 3 <br />1-08.1(7)C.INST1.GR1 4 <br />The first sentence in the last paragraph of Section 1 -08.1(7)C is revised to read: 5 <br /> 6 <br />1-08.1(7)C.OPT1.2025.GR1 7 <br />(February 13, 2024) 8 <br />If the Contractor fails to comply with the requirements of this Section and the 9 <br />first-tier subcontractor’s retainage or retainage bond is wrongfully withheld, the 10 <br />Contractor will be subject to the actions described in Section 1 -08.1(10). 11 <br /> 12 <br />1-08.1(9).GR1 13 <br />Required Subcontract Clauses 14 <br /> 15 <br />1-08.1(9)B.GR1 16 <br />Clauses Required in Subcontracts of All Tiers 17 <br /> 18 <br />1-08.1(9)B.INST1.GR1 19 <br />The second paragraph of Section 1 -08.1(9)B is supplemented with the following: 20 <br /> 21 <br />1-08.1(9)B.OPT1.2025.GR1 22 <br />(January 24, 2024) 23 <br />16. 1-07.11 Requirements for Nondiscrimination – Item 11 from Section 1-24 <br />07.11(2). 25 <br /> 26 <br />1-08.3.GR1 27 <br />Progress Schedule 28 <br /> 29 <br />COE1-08.3(2)A.RTF 30 <br />1-08.3(2)A Type A Progress Schedule 31 <br />(December 30, 2022 APWA GSP) 32 <br /> 33 <br />Revise this section to read: 34 <br /> 35 <br />The Contractor shall submit ***3*** copies of a Type A Progress Schedule no later than at 36 <br />the preconstruction conference, or some other mutually agreed upon submittal time. The 37 <br />schedule may be a critical path method (CPM) schedule, bar chart, or other standard 38 <br />schedule format. Regardless of which format used, the schedule shall identify the critical 39 <br />path. The Engineer will evaluate the Type A Progress Schedule and approve or return the 40 <br />schedule for corrections within 15 calendar days of receiving the submittal. 41 <br /> 42 <br />1-08.3(2)D.rtf 43 <br />1-08.3(2)D Preliminary Progress Schedules 44 <br />(January 4, 2024 APWA GSP) 45 <br /> 46 <br />Revise the second paragraph to read: 47 <br /> 48 <br />1. The preliminary progress schedule shall be submitted no later than the 49 <br />preconstruction conference for all Type B and Type C progress schedules. 50 <br /> 51