My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 61 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-08.1(7)C.GR1 1 <br />Subcontractor Retainage 2 <br /> 3 <br />1-08.1(7)C.INST1.GR1 4 <br />The first sentence in the last paragraph of Section 1 -08.1(7)C is revised to read: 5 <br /> 6 <br />1-08.1(7)C.OPT1.2025.GR1 7 <br />(February 13, 2024) 8 <br />If the Contractor fails to comply with the requirements of this Section and the 9 <br />first-tier subcontractor’s retainage or retainage bond is wrongfully withheld, the 10 <br />Contractor will be subject to the actions described in Section 1 -08.1(10). 11 <br /> 12 <br />1-08.1(9).GR1 13 <br />Required Subcontract Clauses 14 <br /> 15 <br />1-08.1(9)B.GR1 16 <br />Clauses Required in Subcontracts of All Tiers 17 <br /> 18 <br />1-08.1(9)B.INST1.GR1 19 <br />The second paragraph of Section 1 -08.1(9)B is supplemented with the following: 20 <br /> 21 <br />1-08.1(9)B.OPT1.2025.GR1 22 <br />(January 24, 2024) 23 <br />16. 1-07.11 Requirements for Nondiscrimination – Item 11 from Section 1-24 <br />07.11(2). 25 <br /> 26 <br />1-08.3.GR1 27 <br />Progress Schedule 28 <br /> 29 <br />COE1-08.3(2)A.RTF 30 <br />1-08.3(2)A Type A Progress Schedule 31 <br />(December 30, 2022 APWA GSP) 32 <br /> 33 <br />Revise this section to read: 34 <br /> 35 <br />The Contractor shall submit ***3*** copies of a Type A Progress Schedule no later than at 36 <br />the preconstruction conference, or some other mutually agreed upon submittal time. The 37 <br />schedule may be a critical path method (CPM) schedule, bar chart, or other standard 38 <br />schedule format. Regardless of which format used, the schedule shall identify the critical 39 <br />path. The Engineer will evaluate the Type A Progress Schedule and approve or return the 40 <br />schedule for corrections within 15 calendar days of receiving the submittal. 41 <br /> 42 <br />1-08.3(2)D.rtf 43 <br />1-08.3(2)D Preliminary Progress Schedules 44 <br />(January 4, 2024 APWA GSP) 45 <br /> 46 <br />Revise the second paragraph to read: 47 <br /> 48 <br />1. The preliminary progress schedule shall be submitted no later than the 49 <br />preconstruction conference for all Type B and Type C progress schedules. 50 <br /> 51
The URL can be used to link to this page
Your browser does not support the video tag.