My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 66 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Bid Schedule. Items which are not to be included in the item of Mobilization include but 1 <br />are not limited to: 2 <br /> 3 <br />1. Portions of the Work covered by the specific Contract item or incidental Work 4 <br />which is to be included in a Contract item or items. 5 <br />2. Profit, interest on borrowed money, overhead, or management costs. 6 <br />3. Costs incurred for mobilizing equipment for force account Work. 7 <br /> 8 <br />Based on the lump sum Contract price for “Mobilization”, partial payments will be made as 9 <br />follows: 10 <br /> 11 <br />1. When 5 percent of the total original Bid Schedule amount is earned from other 12 <br />Contract items on that original Bid Schedule, excluding amounts paid for 13 <br />materials on hand, 50 percent of the Bid Item for mobilization on that original Bid 14 <br />Schedule, 5 percent of the total of that original Bid Schedule, or 5 percent of the 15 <br />total original Contract amount, whichever is the least, will be paid. 16 <br />2. When 10 percent of the total original Bid Schedule amount is earned from other 17 <br />Contract items on that original Bid Schedule, excluding amounts paid for 18 <br />materials on hand, 100 percent of the Bid Item for mobilization on that original Bid 19 <br />Schedule, 10 percent of the total of that original Bid Schedule, or 10 percent of 20 <br />the total original Contract amount, whichever is the least, will be paid. 21 <br />3. When the Substantial Completion Date has been established for the project, 22 <br />payment of any remaining amount Bid for mobilization will be paid. 23 <br /> 24 <br />Nothing herein shall be construed to limit or preclude partial payments otherwise provided 25 <br />by the Contract. 26 <br /> 27 <br />1-09.8.GR1 28 <br />Payment For Material On Hand 29 <br /> 30 <br />1-09.8.INST1.GR1 31 <br />The last paragraph of Section 1 -09.8 is revised to read: 32 <br /> 33 <br />1-09.8.OPT1.GR1 34 <br />(August 3, 2009) 35 <br />The Contracting Agency will not pay for material on hand when the invoice cost is less 36 <br />than $2,000. As materials are used in the work, credits equaling the partial payments for 37 <br />them will be taken on future estimates. Each month, no later than the estimate due date, 38 <br />the Contractor shall submit a letter to the Engineer that clearly states: 1) the amount 39 <br />originally paid on the invoice (or other record of production cost) for the items on hand, 2) 40 <br />the dollar amount of the material incorporated into each of the various work items for the 41 <br />month, and 3) the amount that should be retained in material on hand items. If work is 42 <br />performed on the items and the Contractor does not submit a letter, all of the previous 43 <br />material on hand payment will be deducted on the estimate. Partial payment for materials 44 <br />on hand shall not constitute acceptance. Any material will be rejected if found to be faulty 45 <br />even if partial payment for it has been made. 46 <br /> 47 <br />1-09.9.GR1 48 <br />Payments 49 <br /> 50
The URL can be used to link to this page
Your browser does not support the video tag.