<br />Fulton Street Pedestrian Bicycle Corridor PAGE 66 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Bid Schedule. Items which are not to be included in the item of Mobilization include but 1 <br />are not limited to: 2 <br /> 3 <br />1. Portions of the Work covered by the specific Contract item or incidental Work 4 <br />which is to be included in a Contract item or items. 5 <br />2. Profit, interest on borrowed money, overhead, or management costs. 6 <br />3. Costs incurred for mobilizing equipment for force account Work. 7 <br /> 8 <br />Based on the lump sum Contract price for “Mobilization”, partial payments will be made as 9 <br />follows: 10 <br /> 11 <br />1. When 5 percent of the total original Bid Schedule amount is earned from other 12 <br />Contract items on that original Bid Schedule, excluding amounts paid for 13 <br />materials on hand, 50 percent of the Bid Item for mobilization on that original Bid 14 <br />Schedule, 5 percent of the total of that original Bid Schedule, or 5 percent of the 15 <br />total original Contract amount, whichever is the least, will be paid. 16 <br />2. When 10 percent of the total original Bid Schedule amount is earned from other 17 <br />Contract items on that original Bid Schedule, excluding amounts paid for 18 <br />materials on hand, 100 percent of the Bid Item for mobilization on that original Bid 19 <br />Schedule, 10 percent of the total of that original Bid Schedule, or 10 percent of 20 <br />the total original Contract amount, whichever is the least, will be paid. 21 <br />3. When the Substantial Completion Date has been established for the project, 22 <br />payment of any remaining amount Bid for mobilization will be paid. 23 <br /> 24 <br />Nothing herein shall be construed to limit or preclude partial payments otherwise provided 25 <br />by the Contract. 26 <br /> 27 <br />1-09.8.GR1 28 <br />Payment For Material On Hand 29 <br /> 30 <br />1-09.8.INST1.GR1 31 <br />The last paragraph of Section 1 -09.8 is revised to read: 32 <br /> 33 <br />1-09.8.OPT1.GR1 34 <br />(August 3, 2009) 35 <br />The Contracting Agency will not pay for material on hand when the invoice cost is less 36 <br />than $2,000. As materials are used in the work, credits equaling the partial payments for 37 <br />them will be taken on future estimates. Each month, no later than the estimate due date, 38 <br />the Contractor shall submit a letter to the Engineer that clearly states: 1) the amount 39 <br />originally paid on the invoice (or other record of production cost) for the items on hand, 2) 40 <br />the dollar amount of the material incorporated into each of the various work items for the 41 <br />month, and 3) the amount that should be retained in material on hand items. If work is 42 <br />performed on the items and the Contractor does not submit a letter, all of the previous 43 <br />material on hand payment will be deducted on the estimate. Partial payment for materials 44 <br />on hand shall not constitute acceptance. Any material will be rejected if found to be faulty 45 <br />even if partial payment for it has been made. 46 <br /> 47 <br />1-09.9.GR1 48 <br />Payments 49 <br /> 50