My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 67 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-09.9(Payments).RTF 1 <br />1-09.9 Payments 2 <br />(July 8, 2024, APWA GSP, Option B) 3 <br /> 4 <br />Delete the fourth paragraph and replace it with the following: 5 <br /> 6 <br />Progress payments for completed work and material on hand will be based upon 7 <br />progress estimates prepared by the Engineer. A progress estimate cutoff date will be 8 <br />established at the preconstruction conference. 9 <br /> 10 <br />The initial progress estimate will be made not later than 30 days after the Contractor 11 <br />commences the work, and successive progress estimates will be made every month 12 <br />thereafter until the Completion Date. Progress estimates made during progress of the 13 <br />work are tentative, and made only for the purpose of determining progress payment. 14 <br />The progress estimates are subject to change at any time prior to the calculation of the 15 <br />Final Payment. 16 <br /> 17 <br />The value of the progress estimate will be the sum of the following: 18 <br />1. Unit Price Items in the Bid Form — the approximate quantity of acceptable units of 19 <br />work completed multiplied by the unit price. 20 <br />2. Lump Sum Items in the Bid Form — based on the approved Contractor’s lump sum 21 <br />breakdown for that item, or absent such a breakdown, based on the Engineer’s 22 <br />determination. 23 <br />3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site 24 <br />or other storage area approved by the Engineer. 25 <br />4. Change Orders — entitlement for approved extra cost or completed extra work as 26 <br />determined by the Engineer. 27 <br /> 28 <br />Progress payments will be made in accordance with the progress estimate less: 29 <br />1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; 30 <br />2. The amount of Progress Payments previously made; and 31 <br />3. Funds withheld by the Contracting Agency for disbursement in accordance with the 32 <br />Contract Documents. 33 <br /> 34 <br />Progress payments for work performed shall not be evidence of acceptable performance 35 <br />or an admission by the Contracting Agency that any work has been satisfactorily 36 <br />completed. The determination of payments under the contract will be final in accordance 37 <br />with Section 1-05.1. 38 <br /> 39 <br />1-09.9(1).GR1 40 <br />Retainage 41 <br /> 42 <br />1-09.9(1).INST1.GR1 43 <br />Section 1-09.9(1) content and title is deleted and replaced with the following: 44 <br /> 45 <br />1-09.9(1).OPT1.GR1 46 <br />(June 27, 2011) 47 <br />Vacant 48 <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.