My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 71 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />At the time of returning signals to normal operation, a City of Everett traffic signal 1 <br />technician shall be present and on standby since most signals will not return to 2 <br />normal operation with a turn of the police panel switch and require a conflict monitor 3 <br />reset. 4 <br /> 5 <br />Coordination of traffic signal technician shall be coordinated with the following 6 <br />personnel: 7 <br /> 8 <br />City of Everett Public Works 9 <br />3200 Cedar Street 10 <br />Everett, WA 98201 11 <br />Contact: 12 <br />Steve Sawyer (425) 328-0643 13 <br /> 14 <br /> 15 <br />1-10.5(2).OPT5.GR1 16 <br />(May 20, 2020) 17 <br />"Contractor Provided Uniformed Police Officer", per hour. 18 <br /> 19 <br />The unit Contract price per hour for "Contractor Provided Uniformed Police Officer" 20 <br />shall be full pay for performing the Work as specified and as shown in the Plans, 21 <br />including all costs for arrangement for and supervision of a uniformed law 22 <br />enforcement personnel and vehicles to participate in the Contractor's traffic control 23 <br />activities. 24 <br /> 25 <br />1-10.5(2).OPT7.GR1 26 <br />(November 2, 2022) 27 <br />“Work Zone Safety Contingency”, by force account. 28 <br /> 29 <br />All costs as authorized by the Engineer will be paid for by force account as specified 30 <br />in Section 1-09.6. 31 <br /> 32 <br />For purpose of providing a common proposal for all bidders, the Contracting Agency 33 <br />has entered an amount for the item “Work Zone Safety Contingency” in the Proposal 34 <br />to become a part of the Contractor’s total bid. 35 <br /> 36 <br />The Engineer may choose to use existing bid items for the implementation of the 37 <br />agreed upon enhancement. 38 <br /> 39 <br />END DIVISION1.RTF 40 <br />END DIVISION 1 41 <br /> 42
The URL can be used to link to this page
Your browser does not support the video tag.