Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 71 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />At the time of returning signals to normal operation, a City of Everett traffic signal 1 <br />technician shall be present and on standby since most signals will not return to 2 <br />normal operation with a turn of the police panel switch and require a conflict monitor 3 <br />reset. 4 <br /> 5 <br />Coordination of traffic signal technician shall be coordinated with the following 6 <br />personnel: 7 <br /> 8 <br />City of Everett Public Works 9 <br />3200 Cedar Street 10 <br />Everett, WA 98201 11 <br />Contact: 12 <br />Steve Sawyer (425) 328-0643 13 <br /> 14 <br /> 15 <br />1-10.5(2).OPT5.GR1 16 <br />(May 20, 2020) 17 <br />"Contractor Provided Uniformed Police Officer", per hour. 18 <br /> 19 <br />The unit Contract price per hour for "Contractor Provided Uniformed Police Officer" 20 <br />shall be full pay for performing the Work as specified and as shown in the Plans, 21 <br />including all costs for arrangement for and supervision of a uniformed law 22 <br />enforcement personnel and vehicles to participate in the Contractor's traffic control 23 <br />activities. 24 <br /> 25 <br />1-10.5(2).OPT7.GR1 26 <br />(November 2, 2022) 27 <br />“Work Zone Safety Contingency”, by force account. 28 <br /> 29 <br />All costs as authorized by the Engineer will be paid for by force account as specified 30 <br />in Section 1-09.6. 31 <br /> 32 <br />For purpose of providing a common proposal for all bidders, the Contracting Agency 33 <br />has entered an amount for the item “Work Zone Safety Contingency” in the Proposal 34 <br />to become a part of the Contractor’s total bid. 35 <br /> 36 <br />The Engineer may choose to use existing bid items for the implementation of the 37 <br />agreed upon enhancement. 38 <br /> 39 <br />END DIVISION1.RTF 40 <br />END DIVISION 1 41 <br /> 42