My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 70 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />13912 NE 20th Ave. 1 <br />Vancouver, WA 98686 2 <br />(360) 574-6071 3 <br />https://www.integritysafety.com 4 <br /> 5 <br />US Safety Alliance 6 <br />(904) 705-5660 7 <br />https://www.ussafetyalliance.com 8 <br /> 9 <br />K&D Services Inc. 10 <br />2719 Rockefeller Ave. 11 <br />Everett, WA 98201 12 <br />(800) 343-4049 13 <br />https://www.kndservices.net 14 <br /> 15 <br />1-10.3.GR1 16 <br />Traffic Control Labor, Procedures and Devices 17 <br /> 18 <br />1-10.3(1).GR1 19 <br />Traffic Control Labor 20 <br /> 21 <br />COE 1-10.3(1)C FED.RTF 22 <br />COE 1-10.3(1)C FED.RTF 23 <br />[City of Everett, January 19, 2020 (WSDOT approved 1/8/20, amended 3/2/23)] 24 <br />Section 1-10.3(1)C is added as follows: 25 <br /> 26 <br />1-10.3(1)C Uniformed Police Officer 27 <br />(******) 28 <br /> 29 <br />The Contractor shall provide commissioned uniformed police control at any time a 30 <br />signalized intersection is dark, flashing red, or inoperative, such as during grinding 31 <br />or paving operations where the traffic signal must be put into flashing operation. 32 <br />Signalized intersections shall not be police controlled between the hours of 6:00am 33 <br />and 8:30am nor 12:00pm to 7:30pm, unless approved by the Engineer. 34 <br /> 35 <br />The following list is provided for contractor convenience for the Coordination of 36 <br />commissioned uniformed Police control personnel: 37 <br /> 38 <br />1. City of Everett Police Officers Association 39 <br />Post Office Box 1253 40 <br />Everett, WA 98201 41 <br />Contacts: 42 <br />Detective Todd Israel 425-740-4951, tisrael@everettwa.gov 43 <br />Officer Omar Estrada 425-512-7186, oestrada@everettwa.gov 44 <br /> 45 <br />2. Washington State Patrol 46 <br />Contact: 47 <br />D7services@wsp.wa.gov 48 <br />Provide: Name, Phone, and Nature of Request 49 <br />Dispatch: (360)654-1204 50 <br /> 51
The URL can be used to link to this page
Your browser does not support the video tag.