Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 101 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />then be carefully painted with hot asphalt cement or asphalt emulsion and shall be 1 <br />immediately covered with dry paving sand before the asphalt cement solidifies. 2 <br /> 3 <br />The inside throat of the structure shall be thoroughly mortared and plastered through 4 <br />to the outside of the structure’s concrete adjustment rings. 5 <br /> 6 <br />Castings that need replacement shall be identified by the City of Everett. 7 <br />Replacement casting will be supplied by the City of Everett and original casting will 8 <br />be picked up by the City of Everett. 9 <br /> 10 <br /> 11 <br />GLF 7-05.3(5).DOCX 12 <br />Adjusting Valve Boxes to Grade 13 <br />(******) 14 <br /> 15 <br />Section 7-05.3 of the standard specifications is supplemented with the following: 16 <br /> 17 <br />(******) 18 <br />Adjustment of valve boxes to grade shall occur only as needed and/or directed by 19 <br />the engineer. Existing valve boxes and covers shall be adjusted to the grade as 20 <br />staked or otherwise designated by the Engineer. The adjustment of the valve box to 21 <br />grade by the use of riser rings is not allowed. 22 <br /> 23 <br />Removal operations shall be conducted to prevent damage to the valve boxes. Any 24 <br />parts or materials damaged due to the Contractor's operations shall be replaced at 25 <br />the Contractor’s expense. Castings that need replacement shall be identified by the 26 <br />City of Everett. 27 <br /> 28 <br />The Contractor shall conduct the valve box adjustments so that the fully -adjusted box 29 <br />allows the respective valve to be fully operational. The Contractor shall remove all 30 <br />debris from the adjusted valve boxes to ensure such operational condition. 31 <br /> 32 <br /> 33 <br />GLF 7-05.4.DOCX 34 <br />7-05.4 Measurement 35 <br /> 36 <br />Section 7-05.4 of the standard specifications is deleted and replaced with the following: 37 <br /> 38 <br />(******) 39 <br />“Adjust Catch Basin/Inlet to Grade”, shall be measured per each. 40 <br /> 41 <br />“Adjust Valve Box to Grade”, shall be measured per each. 42 <br /> 43 <br /> 44 <br />GLF 7-05.5.DOCX 45 <br />7-05.5 Payment 46 <br /> 47 <br />Section 7-05.5 of the standard specifications is deleted and replaced with the following: 48