Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 102 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br /> 1 <br />(******) 2 <br />Payment will be made for each of the following bid items that are included in the proposal: 3 <br /> 4 <br />“Adjust Catch Basin/Inlet to Grade”, per each. 5 <br /> 6 <br />“Adjust Valve Box to Grade”, per each. 7 <br /> 8 <br />The payment for “Adjust Manhole to Grade”, “Adjust Catch Basin/Inlet to Grade”, shall be 9 <br />full compensation for all costs necessary to make the adjustment including temporary 10 <br />cover to adjust the existing structure to required elevation, construction of the asphalt 11 <br />transition around the structure, and restoration of the adjacent area. Adjustment of any 12 <br />structures twice will be paid as one adjustment. 13 <br /> 14 <br />END DIVISION7.RTF 15 <br /> 16 <br />END DIVISION 7 17 <br /> 18