My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Fulton Street Pedestrian Bicycle Corridor PAGE 107 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Category 2: Sensitive information <br />• Resumption of power to thermal traffic sensor 1 <br />• Recall activated 2 <br /> 3 <br />Video System Communications Module 4 <br /> 5 <br />The Communication board shall be integrated with the TI BPL2 EDGE card 6 <br />and fit directly into NEMA TS1 & TS2 type racks as well as Type 170/2070 7 <br />input files. 8 <br /> 9 <br />9-29.18(3)B Functional Capabilities 10 <br /> 11 <br />Real Time Detection of vehicles and bicycles using the roadway. Bicycles 12 <br />using the roadway can be detected regardless of which lane they are using 13 <br />even if vehicle traffic is present. Bicycles detected can have a separate output 14 <br />to allow bikes a pre-call or a longer minimum green. 15 <br /> 16 <br />The TI BPL2 EDGE system shall be expandable up to 8 FLIR sensors that 17 <br />may be programmed independently. Up to four (4) TI BPL2 EDGE cards may 18 <br />be used if more than 8 sensors are necessary – up to 32 FLIR sensors. 19 <br /> 20 <br />The system shall be capable of displaying detection zones on the thermal 21 <br />image with associated outputs. Outputs/Inputs status will be indicated on the 22 <br />screen. Parameters will also include the ability to view raw video without any 23 <br />verbiage and/or detectors for surveillance purposes. Signal phasing can also 24 <br />be displayed in a NEMA TS2-1 cabinet with an accompanied PIM Module and 25 <br />SDLC interface (optional). 26 <br /> 27 <br /> 28 <br />Each thermal traffic detector will detect within its view the presence of 29 <br />vehicles or bicycles in user defined zones. Detectors available shall be 30 <br />presence, count, delay, extension, or pulse mode for either arrival or 31 <br />departure of vehicles. Delay and extension shall be defined between 0.1 – 32 <br />99.9 seconds and pulse mode between 0 – 200ms in 33ms increments if 33 <br />NTSC is used. Each thermal traffic sensor shall also detect and collect traffic 34 <br />data of passing vehicles in user-defined zones. 35 <br /> 36 <br />Collected traffic data by direction shall include: 37 <br /> 38 <br />• Volume (absolute numbers) per length class and per lane. 39 <br />• Average speed (km/h or mph) per length class and per lane. 40 <br />• Average gap time (1/10 sec) per length class and per lane. 41 <br />• Average headway (m or feet) per lane. 42 <br />• Occupancy (%) per lane 43 <br />• Confidence (0-10) depending on Thermal Quality of Image 44 <br />• Density (Vehicles / KM) Number of Vehicles over distance 45 <br /> 46
The URL can be used to link to this page
Your browser does not support the video tag.