Laserfiche WebLink
<br /> <br />Fulton Street Pedestrian Bicycle Corridor PAGE 114 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Category 2: Sensitive information <br />as close as practical to the end of the mast arm. The video detection cable shall 1 <br />be installed in the mast arm per manufacturers recommendations. Any coiled 2 <br />slack cable shall be mounted to the camera mount bracket at the back of the 3 <br />pole. In the signal control cabinet, a video detection module shall be installed, 4 <br />along with a surge protector and 4x6 fuse kit assembly. Video detection cable 5 <br />hall be connectorized and all cables terminated to complete the system. City of 6 <br />Everett signal technician will direct location of cable terminations, VIP module, 7 <br />and other hardware. Through the Engineer, the contractor shall contact Steve 8 <br />Sawyer (425)328-0643 a minimum 3 days prior to activation to coordinate a 9 <br />signal technician to be on site. 10 <br /> 11 <br /> 12 <br /> 13