My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Fulton Street Pedestrian Bicycle Corridor PAGE 114 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Category 2: Sensitive information <br />as close as practical to the end of the mast arm. The video detection cable shall 1 <br />be installed in the mast arm per manufacturers recommendations. Any coiled 2 <br />slack cable shall be mounted to the camera mount bracket at the back of the 3 <br />pole. In the signal control cabinet, a video detection module shall be installed, 4 <br />along with a surge protector and 4x6 fuse kit assembly. Video detection cable 5 <br />hall be connectorized and all cables terminated to complete the system. City of 6 <br />Everett signal technician will direct location of cable terminations, VIP module, 7 <br />and other hardware. Through the Engineer, the contractor shall contact Steve 8 <br />Sawyer (425)328-0643 a minimum 3 days prior to activation to coordinate a 9 <br />signal technician to be on site. 10 <br /> 11 <br /> 12 <br /> 13
The URL can be used to link to this page
Your browser does not support the video tag.