Laserfiche WebLink
<br />  <br /> <br /> <br /> <br /> <br /> <br /> <br />Page | 10 <br />GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom <br />(including jib with attachments); Tower crane over 175 ft <br />in height, base to boom <br />GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom <br />(including jib with attachments); Crane-overhead, bridge <br />type, 100 tons and over; Tower crane up to 175 ft in height <br />base to boom; Loaders-overhead, 8 yards and over; Shovels, <br />excavator, backhoes-6 yards and over with attachments <br />GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft <br />of boom (including jib with attachments); Crane-overhead, <br />bridge type, 45 tons thru 99 tons; Derricks on building <br />work; Excavator, shovel, backhoes over 3 yards and under 6 <br />yards; Hard tail end dump articulating off-road equipment <br />45 yards and over; Loader- overhead 6 yards to, but not <br />including 8 yards; Mucking machine, mole, tunnel, drill <br />and/or shield; Quad 9, HD 41, D-10; Remote control operator <br />on rubber tired earth moving equipment; Rollagon; <br />Scrapers-self propelled 45 yards and over; Slipform pavers; <br />Transporters, all truck or track type <br />GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- <br />Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with <br />attachments; Crane-overhead, bridge type-20 tons through 44 <br />tons; Chipper; Concrete Pump-truck mount with boom <br />attachment; Crusher; Deck Engineer/Deck Winches (power); <br />Drilling machine; Excavator, shovel, backhoe-3yards and <br />under; Finishing Machine, Bidwell, Gamaco and similar <br />equipment; Guardrail punch; Horizontal/directional drill <br />operator; Loaders-overhead under 6 yards; Loaders-plant <br />feed; Locomotives-all; Mechanics-all; Mixers-asphalt plant; <br />Motor patrol graders-finishing; Piledriver (other than <br />crane mount); Roto-mill,roto-grinder; Screedman, spreader, <br />topside operator-Blaw Knox, Cedar Rapids, Jaeger, <br />Caterpillar, Barbar Green; Scraper-self propelled, hard <br />tail end dump, articulating off-road equipment-under 45 <br />yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; <br />Transfer material service machine-shuttle buggy, blaw <br />knox-roadtec; Truck crane oiler/driver-100 tons and over; <br />Truck Mount portable conveyor; Yo Yo Pay dozer <br />GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; <br />A-frame crane over 10 tons; Drill oilers-auger type, truck <br />or crane mount; Dozers-D-9 and under; Forklift-3000 lbs. <br />and over with attachments; Horizontal/directional drill <br />locator; Outside hoists-(elevators and manlifts), air <br />tuggers, strato tower bucket elevators; Hydralifts/boom <br />trucks over 10 tons; Loader-elevating type, belt; Motor <br />patrol grader-nonfinishing; Plant oiler- asphalt, crusher; <br />Pumps-concrete; Roller, plant mix or multi-lift materials; <br />Saws-concrete; Scrpers-concrete and carry-all; Service <br />engineer-equipment; Trenching machines; Truck Crane <br />Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and <br />under <br />10 | Page <br />WA20240001 Modification 4 <br />Federal Wage Determinations for Highway Construction