Laserfiche WebLink
Page | 11 <br /> <br />  <br />GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; <br />Concrete finish mahine-laser screed; Cranes-A frame-10 tons <br />and under; Elevator and Manlift-permanent or shaft type; <br />Gradechecker, Stakehop; Forklifts under 3000 lbs. with <br />attachments; Hydralifts/boom trucks, 10 tons and under; Oil <br />distributors, blower distribution and mulch seeding <br />operator; Pavement breaker; Posthole digger, mechanical; <br />Power plant; Pumps, water; Rigger and Bellman; Roller-other <br />than plant mix; Wheel Tractors, farmall type; <br />Shotcrete/gunite equipment operator <br /> <br />HANDLING OF HAZARDOUS WASTE MATERIALS: <br /> <br />Personnel in all craft classifications subject to working <br />inside a federally designated hazardous perimeter shall be <br />elgible for compensation in accordance with the following <br />group schedule relative to the level of hazardous waste as <br />outlined in the specific hazardous waste project site <br />safety plan. <br /> <br />H-1 Base wage rate when on a hazardous waste site when not <br />outfitted with protective clothing <br /> <br />H-2 Class ""C"" Suit - Base wage rate plus $ .25 per hour. <br /> <br />H-3 Class ""B"" Suit - Base wage rate plus $ .50 per hour. <br /> <br />H-4 Class ""A"" Suit - Base wage rate plus $ .75 per hour. <br /> <br />---------------------------------------------------------------- <br />ENGI0370-002 06/01/2021 <br /> <br />ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), <br />COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, <br />FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH <br />MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN <br />AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES <br /> <br />ZONE 1: <br /> <br />Rates Fringes <br /> <br />POWER EQUIPMENT OPERATOR <br />GROUP 1.....................$ 29.76 20.65 <br />GROUP 2.....................$ 30.08 20.65 <br />GROUP 3.....................$ 30.69 20.65 <br />GROUP 4.....................$ 30.85 20.65 <br />GROUP 5.....................$ 31.01 20.65 <br />GROUP 6.....................$ 31.21 20.65 <br />GROUP 7.....................$ 31.56 20.65 <br />GROUP 8.....................$ 32.66 20.65 <br /> <br />ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 <br /> <br />Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; <br />Lewiston, Idaho <br />11 | Page <br />WA20240001 Modification 4 <br />Federal Wage Determinations for Highway Construction