Laserfiche WebLink
<br />  <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page | 13 <br />GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump- <br />crete, Whitman & similar); Curb Extruder (asphalt or <br />concrete); Drills (churn, core, calyx or diamond); <br />Equipment Serviceman; Greaser & Oiler; Hoist (2 or more <br />drums or Tower Hoist); Loaders (overhead & front-end, under <br />4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton); <br />Rubber-tired Skidders (R/T with or without attachments); <br />Surface Heater & Plant Machine; Trenching Machines (under 7 <br />ft. depth capacity); Turnhead (with re-screening); Vacuum <br />Drill (reverse circulation drill under 8 inch bit) <br />GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under <br />3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes <br />(25 tons & under), all attachments including clamshell, <br />dragline; Derricks & Stifflegs (under 65 tons); Drilling <br />Equipment(8 inch bit & over) (Robbins, reverse circulation <br />& similar); Hoe Ram; Piledriving Engineers; Paving (dual <br />drum); Railroad Track Liner Operaotr (self-propelled); <br />Refrigeration Plant Engineer (1000 tons & over); Signalman <br />(Whirleys, Highline Hammerheads or similar); Grade Checker <br />GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches <br />& Trimmers)(Autograde, ABC, R.A. Hansen & similar on grade <br />wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes <br />& Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units); <br />Batch & Wet Mix Operator (multiple units, 2 & incl. 4); <br />Blade Operator (motor patrol & attachments); Cable <br />Controller (dispatcher); Compactor (self-propelled with <br />blade); Concrete Pump Boom Truck; Concrete Slip Form Paver; <br />Cranes (over 25 tons, to and including 45 tons), all <br />attachments including clamshell, dragline; Crusher, Grizzle <br />& Screening Plant Operator; Dozer, 834 R/T & similar; Drill <br />Doctor; Loader Operator (front-end & overhead, 4 yds. incl. <br />8 yds.); Multiple Dozer Units with single blade; Paving <br />Machine (asphalt and concrete); Quad-Track or similar <br />equipment; Rollerman (finishing asphalt pavement); Roto <br />Mill (pavement grinder); Scrapers, all, rubber-tired; <br />Screed Operator; Shovel(under 3 yds.); Trenching Machines <br />(7 ft. depth & over); Tug Boat Operator Vactor guzzler, <br />super sucker; Lime Batch Tank Operator (REcycle Train); <br />Lime Brain Operator (Recycle Train); Mobile Crusher <br />Operator (Recycle Train) <br />13 | Page <br />WA20240001 Modification 4 <br />Federal Wage Determinations for Highway Construction