My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/30/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Earthwork Solutions, LLC 1/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 1:40:20 PM
Creation date
2/4/2025 1:26:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/30/2025
Council Approval Date
9/11/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Public Works WO Number
3785
Tracking Number
0004652
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page | 14 <br /> <br /> <br />GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds <br />& over); Blade (finish & bluetop) Automatic, CMI, ABC, <br />Finish Athey & Huber & similar when used as automatic; <br />Cableway Operators; Concrete Cleaning/Decontamination <br />machine operator; Cranes (over 45 tons to but not including <br />85 tons), all attachments including clamshell and dragine; <br />Derricks & Stiffleys (65 tons & over); Elevating Belt <br />(Holland type); Heavy equipment robotics operator; Loader <br />(360 degrees revolving Koehring Scooper or similar); <br />Loaders (overhead & front-end, over 8 yds. to 10 yds.); <br />Rubber-tired Scrapers (multiple engine with three or more <br />scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, <br />ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform <br />Trailers (Goldhofer, Shaurerly andSimilar); Ultra High <br />Pressure Wateriet Cutting Tool System Operator (30,000 <br />psi); Vacuum Blasting Machine Operator <br /> <br />GROUP 8: Cranes (85 tons and over, and all climbing, <br />overhead,rail and tower), all attachments including <br />clamshell, dragline; Loaders (overhead and front-end, 10 <br />yards and over); Helicopter Pilot <br /> <br />BOOM PAY: (All Cranes, Including Tower) <br />180 ft to 250 ft $ .50 over scale <br />Over 250 ft $ .80 over scale <br /> <br />NOTE: <br />In computing the length of the boom on Tower Cranes, they <br />shall be measured from the base of the Tower to the point <br />of the boom. <br /> <br />HAZMAT: <br />Anyone working on HAZMAT jobs, working with supplied air <br />shall receive $1.00 an hour above classification. <br /> <br />---------------------------------------------------------------- <br />ENGI0612-001 06/01/2023 <br /> <br />PIERCE County <br /> <br />ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH <br />GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. <br />ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. <br /> <br />Zone 1 (0-25 radius miles): <br /> <br />Rates Fringes <br /> <br />POWER EQUIPMENT OPERATOR <br />GROUP 1A...................$ 56.08 25.07 <br />GROUP 1AA..................$ 56.89 25.07 <br />GROUP 1AAA.................$ 57.70 25.07 <br />GROUP 1.....................$ 55.26 25.07 <br />GROUP 2.....................$ 54.55 25.07 <br />GROUP 3.....................$ 53.94 25.07 <br />GROUP 4.....................$ 50.50 25.07 <br />14 | Page <br />WA20240001 Modification 4 <br />Federal Wage Determinations for Highway Construction
The URL can be used to link to this page
Your browser does not support the video tag.