Laserfiche WebLink
Page | 14 <br /> <br />  <br />GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds <br />& over); Blade (finish & bluetop) Automatic, CMI, ABC, <br />Finish Athey & Huber & similar when used as automatic; <br />Cableway Operators; Concrete Cleaning/Decontamination <br />machine operator; Cranes (over 45 tons to but not including <br />85 tons), all attachments including clamshell and dragine; <br />Derricks & Stiffleys (65 tons & over); Elevating Belt <br />(Holland type); Heavy equipment robotics operator; Loader <br />(360 degrees revolving Koehring Scooper or similar); <br />Loaders (overhead & front-end, over 8 yds. to 10 yds.); <br />Rubber-tired Scrapers (multiple engine with three or more <br />scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, <br />ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform <br />Trailers (Goldhofer, Shaurerly andSimilar); Ultra High <br />Pressure Wateriet Cutting Tool System Operator (30,000 <br />psi); Vacuum Blasting Machine Operator <br /> <br />GROUP 8: Cranes (85 tons and over, and all climbing, <br />overhead,rail and tower), all attachments including <br />clamshell, dragline; Loaders (overhead and front-end, 10 <br />yards and over); Helicopter Pilot <br /> <br />BOOM PAY: (All Cranes, Including Tower) <br />180 ft to 250 ft $ .50 over scale <br />Over 250 ft $ .80 over scale <br /> <br />NOTE: <br />In computing the length of the boom on Tower Cranes, they <br />shall be measured from the base of the Tower to the point <br />of the boom. <br /> <br />HAZMAT: <br />Anyone working on HAZMAT jobs, working with supplied air <br />shall receive $1.00 an hour above classification. <br /> <br />---------------------------------------------------------------- <br />ENGI0612-001 06/01/2023 <br /> <br />PIERCE County <br /> <br />ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH <br />GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. <br />ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. <br /> <br />Zone 1 (0-25 radius miles): <br /> <br />Rates Fringes <br /> <br />POWER EQUIPMENT OPERATOR <br />GROUP 1A...................$ 56.08 25.07 <br />GROUP 1AA..................$ 56.89 25.07 <br />GROUP 1AAA.................$ 57.70 25.07 <br />GROUP 1.....................$ 55.26 25.07 <br />GROUP 2.....................$ 54.55 25.07 <br />GROUP 3.....................$ 53.94 25.07 <br />GROUP 4.....................$ 50.50 25.07 <br />14 | Page <br />WA20240001 Modification 4 <br />Federal Wage Determinations for Highway Construction