Laserfiche WebLink
SYMBOL LEGEND GENERAL NOTES GENERAL CONDITIONS ABBREVIATIONS go* <br /> KAISER <br /> ■ ABV ABOVE IN INCHES PERMANENTE <br /> SOLENOID VALVE 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS. 1. ALL WORK TO BE IN ACCORDANCE WITH REQUIREMENTS OF GOVERNING LOCAL FIRE CODES AND BUILDING <br /> - MATCH LINE CODES. ACU AIR CONDITIONING UNIT INV INVERT ELEVATION <br /> 2. IN THE EVENT OF A DISCREPANCY BETWEEN CONTRACT DRAWINGS AND SPECIFICATIONS,THE MOST STRINGENT 2. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS.NOTIFY ARCHITECT OF ANY DISCREPANCIES FOUND. ACC AIR COOLED CHILLER KW KILOWATT PTOJOCS <br /> SHALL GOVERN. <br /> VERIFY DIMENSIONS OF ALL OWNER-FURNISHED OPERATING EQUIPMENT TO ENSURE PROPER COORDINATION AD ACCESSDOOR KWH KILOWATT HOUR Kaiser Permanente Everett <br /> EF 3. PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING STATE AND LOCAL CODES. WITH CONSTRUCTION. ,,I <br /> EQUIPMENT TAG RADIUS ELBOW,RID=I.5 UNLESS NOTED OTHERWISE AFF ABOVE FINISHEURINGS LAT LEAVING AIR TEMP. Medical CIInIC Expansion <br /> 1 4. INSTALL ALL PIPING AND DUCTWORK TO AVOID ARCHITECTURAL FRAMING,STRUCTURAL MEMBERS,AND OTHER 3. SCHEDULE ALL WORK ACCESS AND STORAGE WITH THE FACILITY ADMINISTRATOR. AFMS AIR FLOW MEASURING STATION LBS POUNDS <br /> OBSTRUCTIONS.COORDINATE PIPING AND DUCTWORK LOCATION WITH ALL APPLICABLE CONTRACT DRAWINGS 2929 PINE STREET <br /> PRIOR TO PLACING SLEEVES IN FLOORS OR WALLS. 4, CONTRACTOR SHALL PROVIDE DUST COVERS AS REQUIRED TO CONTAIN DUST AND DEBRIS WITHIN AHU AIR HANDLING UNIT LD LINEAR DIFFUSER <br /> m <br /> POINT OF CONNECTION,NEW WORK TO EXISTING WORK 5. INSTALL ALL PIPING AND DUCTWORK TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE INSTALLATION C NSTRUCTION AREA AND KEEP DIRT AND DUST TO A MINIMUM. AL ACOUSTICAL LINING LPR LOW PRESSURE STEAM RETURN EVERETT,WA 98201 <br /> DUCT MOUNTED COIL WORK OF OTHER TRADES.THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT 5. ALOL REMOVED ITEMS DEEMED TO HAVE VALUE BY THE OWNER SHALL BE DELIVERED TO A PLACE OF STORAGE ALT ALTITUDE UPS LOW PRESSURE STEAM SUPPLY <br /> LOCATIONS OF PIPING OR DUCTWORK. AT THE SITE AS DIRECTED.ALL OTHER ITEMS MUST BE DISPOSED OF OFF SITE IN A LEGAL MANNER. <br /> ALD AUTOMATIC LOUVER DAMPER LVR LOUVER Prepared for <br /> 6. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT DIFFUSER LOCATIONS AND FINISHED CEILING. 6. WHERE EXISTING CONSTRUCTION IS CUT,DAMAGED,OR REMODELED,PATCH WITH MATERIALS TO MATCH IN <br /> POINT OF DISCONNECTION KIND,QUALITY AND PERFORMANCE. APPROX APPROXIMATE LWT LEAVING WATER TEMP. KAISER FOUNDATION <br /> ' 7. COORDINATE DUCTWORK,PIPING WITH STRUCTURAL DRAWINGS,LIGHTING AND SPRINKLER SYSTEM.PROVIDE ARCH ARCHITECTURAL M MAIN AIR HEALTH PLAN, INC. <br /> SHOWN IN ORDER(LEFT TO RIGHT):FIRE TRANSITIONS AS REQUIRED. 7. CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR SAFETY OF ALL PERSONS ON OR ABOUT THE <br /> DEVICE <br /> AIR OUTLET/ �� DAMPER(FD)/SMOKE DAMPER(SD)I CONSTRUCTION SITE IN ACCORDANCE WITH APPLICABLE LAWS AND CODES.GUARD ALL HAZARDS IN AS AIR SEPARATOR Q MAGNETIC GAUGE <br /> SD-1 SD-1 12X12-NECK SIZE OPTIONAL(IF COMBINATION FIRE SMOKE DAMPER(FSD) 8. COORDINATE LOCATIONS OF ACCESS DOORS WITH F.D.'S�V.D.'S,SO,ETC.THE OPENING SHALL BE LARGE ENOUGH ACCORDANCE WITH THE SAFETY PROVISIONS OF THE LATEST MANUAL OF ACCIDENT PREVENTION PUBLISHED <br /> INLET NATION AVG AVERAGE MA MAKE UP AIR <br /> 550 DESIGNATION 550 NOT GIVEN REFER)TO TO PERMIT MAINTENANCE AND RESETTING OF THE DEVICE. BY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA. <br /> SCHEDULE) B BOILER MAT MIXED AIR TEMPERATURE <br /> AIRFLOW(CFM) 9. CONTRACTOR TO COORDINATE WITH ARCHITECTS CEILING ACCESS PANELS FOR ALL FIRE,SMOKE AND VOLUME 8. CLEAN ALL EXPOSED SURFACES AND NEW EQUIPMENT AFTER COMPLETION. BD BLOWDOWN MAX MAXIMUM <br /> S NEW WORK ® ROOM SENSOR OR THERMOSTAT(WITH ZONE OR DAMPERS IN INACCESSIBLE CEILING AS REQUIRED. 9, WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING NON-PRESTRESSED <br /> 10. WHETHER OR NOT THEY ARE SHOWN ON DRAWINGS PROVIDE ALL CONCRETE PADS,SPECIAL SUPPORTS AND <br /> TU-01 EQUIPMENT DESIGNATION WERE APPLICABLE) REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING BOO BACK DRAFT DAMPER MBD MANUAL BALANCING DAMPER <br /> EXISTING WORK TO REMAIN ANCHORING FOR ALL MECHANICAL EQUIPMENT REQUIRING SUCH.SEE ARCH OR STRUCTURAL DRAWINGS FOR REINFORCING BARS,MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE BF BELOW FLOOR MBH THOUSAND BTU/HOUR <br /> ---� ROOM SENSOR THERMOSTAT(WITH LEADER TO ADDITIONAL INFO. DRILLED-IN ANCHOR AND/OR PIN. <br /> EXISTING WORK TO BE REMOVED RELATED EQUIPMENT PMENT BFW BOILER FEEDWATER MCC MOTOR CONTROL CENTER <br /> UP HUMIDITY SENSOR(WITH ZONE OR EQUIPMENT 11. ALL DUCT DIMENSIONS ARE AIRSTREAM DIMENSIONS. BG BELOW GRADE MFG MANUFACTURER <br /> ®2 <br /> f J DESIGNATION WERE APPLICABLE) 12. ALL <br /> IONS BHP BRAKE HORSEPOWER MIN MINIMUM <br /> ON SLOPE PIPE UP OR DOWN(DN)ASNOTED --� HUMIDITY SENSOR(WITH LEADER TO RELATED CONMRACTORTOENSUECHANICAL TREAPROPERED TWATERPROOFSEATHROUGH OFSHALLHAVECURBSINSTALLEDBYROOFING MECHANICAL DRAWING INDEX <br /> EQUIPMENT BO BLANK OFF MMS MANUAL MOTOR START <br /> 13. SEAL ALL FIRE RATED PENETRATIONS WITH ILL LISTED THROUGH PENETRATION ASSEMBLY AS SPECIFIED.REFER TO M001 MECHANICAL LEGEND BOD BOTTOM OF DUCT (N) NEW <br /> _ SO ARCHITECTURAL. <br /> BOTTOM/UP PIPE CONNECTION DUCT SMOKE DETECTOR(SHOWN HERE TO BE M010 EQUI COMPLIANCE AND GENERAL NOTES BOP BOTTOM OF PIPE WA NOT APPLICABLE <br /> FURNISHED BY ELECTRICAL) 14. THERMOSTAT AND HUMIDISTAT APPEARANCE AND LOCATION SHALL BE COORDINATED WITH ARCHITECTS/OWNER. moil SCHEDULES <br /> M012 EQUI EQUIPMENT SCHEDULES BOR BOTTOM OF RACK NC NORMALLY CLOSED <br /> Bp <br /> PUMP(FOR DIAGRAMMATIC) 15. PROVIDE REMOTE OPERATORS FOR ALL VOLUME DAMPERS LOCATED ABOVE INACCESSIBLE CEILING. M014 EQUIPMENT SCHEDULES BTU BRITISH THERMAL UNIT NIC NOT IN CONTRACT <br /> Db GLOBE VALVE ® CEILING SUPPLY DIFFUSER M015 EQUIPMENT SCHEDULES BTUH BTU PER HOUR NK NECK <br /> i6. PROVIDE OPERATING HANDLES FOR ALL VALVE AND COCKS WITHOUT INTEGRAL OPERATORS. M016 EQUIPMENT SCHEDULES <br /> M017 EQUIPMENT SCHEDULES C COMMON NO NORMALLY OPEN OR NUMBER <br /> IV CHECK VALVE CEILING RETURN REGISTER OR GRILLE 17. IN PROVIDE <br /> GUIDEDNICAL CHAIN <br /> IONS,UNLESS OTHERWISE <br /> WISENOTED,ON IBLE <br /> VALVESROM IN R LEVELMECHANICAL <br /> WHERE POSSIBLE.EQUIP E. M018 EQUIPMENT SCHEDULES CA COMPRESSED AIR NTS NOT TO SCALE Hellmuth,Obata&Kassabaum,Inc. <br /> PROVIDE GUIDED CHAIN OPERATIONS,UNLESS OTHERWISE NOTED,ON ALL VALVES IN MECHANICAL AND EQUIPMENT <br /> ly STOP CHECK VALVE ® CEILING EXHAUST REGISTER OR GRILLE ROOMS INSTALLED OVER T ABOVE FLOOR. M019 EQUIPMENT SCHEDULES CAV CONSTANTVOLUME CA OUTSIDE AIR 1218 Third Avenue,Suite 1315 <br /> DIFFUSER,REGISTER OR GRILLE THROW INDICATOR(SUPPLY, M020 EQUIPMENT SCHEDULES Seattle,WA 98101 USA <br /> [� CALIBRATED FLOW BALANCE VALVE t 18. PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS LINE SIZE SHOWN UNLESS OTHERWISE NOTED. M1108 HVAC DUCTWORK FLOOR PLAN-BASEMENT-AREA B CC COOLING COIL OBD OPPOSED BLADE DAMPER t+1 206 493 1771 f+1 206 493 1778 <br /> RETURN OR EXHUAST <br /> n 19 INSTALL SWING CHECK VALVES IN THE HORIZONTAL POSITION M111 HVAC DUCTWORK FLOOR PLAN-LEVEL 1-AREA A CD CEILING DIFFUSER OD OUTSIDE DIMENSION <br /> fzrS FLOW LIMITING VALVE S� -x . . M111B HVAC DUCTWORK FLOOR PLAN-LEVEL 1-AREA B All reProauoron e,mlellecmel P me raeervea <br /> �t SUPPLY REGISTER OR GRILLE M111C HVAC DUCTWORK FLOOR PLAN CE CEILING EXHAUST ORD OVERFLOW ROOF DRAIN 2U1B roaenv"g <br /> HOSE END BALL VALVE WITH CAP AND CHAIN S II -i 20. PROVIDE 318"BLOW-OFF VALVE AND 112"ITS TO HOSE THREAD ADAPTER ON ALL STRAINERS. <br /> r Ib M112A HVAC DUCTWORK FLOOR PLAN-LEVEL 2-AREA A CFF CAP FOR FUTURE AP PRESSURE DROP OR DIFFERENTIAL In Association With <br /> III BUTTERFLY VALVE n 21. UNLESS OTHERWISE INDICATED ON THE DRAWINGS,ALL HOT WATER SUPPLY/RETURN TAKE-OFFS TO REHEAT COIL IN M112B HVAC DUCTWORK FLOOR PLAN-LEVEL 2-AREA <br /> B CFH CUBIC FEET PER HOUR P PUMP <br /> VAV BOXES SHALL BE 314"DIAMETER. M112C HVAC DUCTWORK FLOOR PLAN-LEVEL 2-AREA C Mortensen <br /> �j RETURN OR EXHAUST REGISTER OR GRILLE CFM CUBIC FEET PER MINUTE PC PUMPED CONDENSATE General Contractor <br /> S T f PITOT LOCATION H- 22. ALL DUCT HEATING COILS SHALL HAVE DUCT ACCESS PANEL. M113 HVAC DUCTWORK FLOOR PLAN-LEVEL 3-AREAA <br /> M113B HVAC DUCTWORK FLOOR PLAN-LEVEL 3-AREA S CG CEILING GRILLE PG PIPE GUIDE 10230 NE Points Drive,Suite 300 <br /> 23, PROVIDE UNIONS OR FLANGES ON EACH SIDE OF CONTROL VALVES AND PUMPS.EVERY PIPING ASSEMBLY SHALL BE M114A HVAC DUCTWORK FLOOR PLAN-LEVEL 4-AREA A Kirkland,WA 98033 <br /> 2-WAY MODULATING CONTROL VALVE ni SO MADE SO AS TO MAKE EVERY VALVE AND PIECE OF EQUIPMENT EASILY REMOVABLE.WELDED OR SOLDERJOINT M114B HVAC DUCTWORK FLOOR PLAN-LEVEL 4-AREA B CHS CHILLED WATER pH PHASE(ELECTRICAL) <br /> VALVES ARE EXCEPTED FROM THIS REQUIREMENT. M115A HVAC DUCTWORK FLOOR PLAN-ROOF-AREAA CHR CHILLED WATER RETURN PHC PREHEAT COIL ConXtech,Inc <br /> ura <br /> SCREENED RETURN OR EXHAUST AIR OPENING <br /> I - M115B HVAC DUCTWORK FLOOR PLAN-ROOF-AREAS CENTERLINE St-tl Fabricator <br /> f 2-WAY 2-POSITION CONTROL VALVE FS.1O 24. PROVIDE LOCAL INDICATOR LIGHTS FOR ALL SMOKE/FIRE DAMPERS.LIGHT IS ACTIVATED WHEN DAMPER IS IN CL POC POINT OF CONNECTION CLOSED POSITION. M120B HVAC PIPING FLOOR PLAN-BASEMENT-AREAS y,Suite 150 <br /> f 3-WAY MODULATING CONTROL VALVE <br /> M121A HVAC PIPING FLOOR PLAN-LEVEL 1-AREA A CMPR COMPRESSOR PRESS PRESSURE 6701 Koll Center Parkway, <br /> CA 94566 <br /> 25, ALL DRAIN CONNECTIONS FROM MECHANICAL EQUIPMENT SHALL BE PIPED TO SPILL DIRECTLY INTO NEAREST FLOOR M121B HVAC PIPING FLOOR PLAN-LEVEL 1-AREA B CO CLEAN OUT(DOOR) PSI POUNDS/SQUARE INCH <br /> DRAIN. M121C WACPIPINGFLOORPLAN-LEVELI-AREAL KPFFConsultin Engineers <br /> SLOPING RISE OR DROP IN RECTANGULAR DUCTWORK COEFF COEFFICIENT PSIG POUNDS PER SQUARE INCH GAUGE er 9 <br /> 3-WAY 2-POSITION CONTROL VALVE M122A HVAC PIPING FLOOR PLAN-LEVEL 2-AREA A Civil+Structural Engineering <br /> 26. PROVIDE I"AIR GAPATALL DRAIN CONNECTIONS. M122B HVAC PIPING FLOOR PLAN-LEVEL 2-AREA B COND CONDENSATE R RISE 1601 Fifth Avenue,Suite 1600 <br /> RELIEF VALVE I ANGLE VALVE I I SLOPING RISE OR DROP IN ROUND DUCTWORK 27. ALL PIPING AND DUCTWORK PASSING THROUGH SEPARATION JOINTS USED AS BUILDING SEISMIC SEPARATIONS M122C HVAC PIPING FLOOR PLAN-LEVEL 2_AREA <br /> C CONN CONNECTION,CONNECT RA RETURN AIR Seattle,WA 98101 <br /> SHALL HAVE FLEXIBLE CONNECTIONS TO COMPENSATE FOR SEISMIC MOVEMENT AS REQUIRED.PROVIDE HANGERS M123A HVAC PIPING FLOOR PLAN-LEVEL 3-AREAA CONT CONTINUATION RAD RETURN AIR DUCT <br /> D ON EACH SIDE OF FLEXIBLE CONNECTION. M123B HVAC PIPING FLOOR PLAN-LEVEL 3-AREA B Mazzetti <br /> D'4 PRESSURE REDUCING VALVE(PRV) M124A HVAC PIPING FLOOR PLAN-LEVEL 4-AREA A COP COEFF.OF PERFORMANCE RCVR RECEIVER MEP+FP Engineering <br /> 18x12 28. SEPARATE ALL CEILING HANGING AND BRACING WIRES B LEAST 6"FROM ALL,CONDUITS, <br /> DUCTS,PIPES,CONDUITS, M124B HVAC PIPING FLOOR PLAN-LEVEL 4-AREA B 2013 4th Avenue,Suite 200 <br /> TAV � RECTANGULAR DUCT,SIZE BASED ON CLEAR ETC.AT THE CONTRACTOR'S OPTION HE MAY BRACE UNBRACED DUCTS,PIPES,CONDUITS,ETC.IN A MANNER COTG CLEAN OUT TO GRADE RF RETURN FAN <br /> THERMOSTATICAIRVENT(AIR SYSTEMS) AREA ROOF- <br /> INSIDE DIMENSIONS,FIRST FIGURE INDICATES CONFORMING TO REQUIREMENTS ESTABLISHED BY THE MECHANICAL AND ELECTRICAL CONTRACT DOCUMENTS,OR M125A HVAC PIPING FLOOR PLAN- CP CONDENSATE PUMP RH RELATIVE HUMIDITY Seattle,WA 98121 <br /> f i8x12 PLAN SIZE THE CONTRACTOR MAY INSTALL TRAPEZE SUPPORTS TO RECEIVE THE CEILING HANGING AND BRACING WIRES.THE M125B HVAC PIPING FLOOR PLAN-ROOF-AREA B <br /> PRESSURE GAUGE,STEAM SYSTEMS GENERAL CONTRACTOR SHALL COORDINATE THE WORK AND RESPONSIBILITY FOR ACCOMMODATING SUCH WORK. M130 HVAC ZONING FLOOR PLAN-BASEMENT CR CEILING REGISTER RHC REHEAT COIL <br /> M131 HVAC ZONING FLOOR PLAN-LEVEL 1 cV COEFF.,VALVE FLOW RPM REVOLUTIONS/MINUTE Key Plan <br /> f f 29. PROVIDE BALANCING DAMPERS AT EACH SUPPLY,RETURN,AND EXHAUST BRANCH TAKE-OFF. M132 HVAC ZONING FLOOR PLAN-LEVEL 2 <br /> PRESSURE GAUGE,HYDRONIC SYSTEMS "'180 M133 HVAC ZONING FLOOR PLAN-LEVEL 3 CWS COND.WATER SUPPLY SA SUPPLYAIR <br /> 30. DUCTS STORED ON THE CONSTRUCTION SITE SHALL BE PROTECTED AND ISOLATED FROM DUST CONTAMINATION. <br /> VB ROUND DUCT,DIAMETER SIZE BASED ON M134 HVAC ZONING FLOOR PLAN-LEVEL 4 CWR COND.WATER RETURN SAD SUPPLY AIR DUCT <br /> VACUUM BREAKER 180 CLEAR INSIDE DIMENSIONS 31. ALL DUCT ELBOWS BEFORE VAV BOXES AND REHEAT COILS SHALL BE OF FULL RADIUS HARD CONNECTION ELBOWS. M311 ENLARGED PLANS CT COOLING TOWER SEC SECOND <br /> M511 AIRFLOW DIAGRAM <br /> FLOW METER(INSTANTANEOUS FLOW) <br /> FM 32. ALL PIPING AND DUCTWORK TO BE FLEXIBLE CONNECTED TO PUMPS,COILS ETC. M512 AIRFLOW DIAGRAM D DROP OR INDIRECT DRAIN SF SUPPLY FAN <br /> 33. SEE ARCHITECTURAL AND STRUCTURAL DOCUMENTS FOR EQUIPMENT SUPPORTS AND ROOF OPENINGS. M513 AIRFLOW DIAGRAM IDS DRY BULB SP STATIC PRESSURE <br /> M514 AIRFLOW DIAGRAM DDC DIRECT DIGITAL CONTROL SPEC SPECIFICATION <br /> TOTALIZING FLOW METER 24x100 FLAT OVAL DUCT,SIZE BASED ON CLEAR INSIDE f 34. ALL PIPING IN MECHANICAL ROOMS TO BE HUNG WITH SPRING ISOLATORS WITH 1/2"STATIC DEFLECTION AT M521 HEATING WATER DIAGRAM <br /> DIMENSIONS,FIRST FIGURE INDICATES PLAN SIZE SPECIFIED SPACING FOR HORIZONTAL PIPING,VERTICAL DROPS AND ALL ELBOWS. M522 HEAT RECOVERY DIAGRAM DEG.F DEGREES FAHRENHEIT SQ SQUARE <br /> FM BTU METER 24x100 M523 MRI PIPING DIAGRAM <br /> 35. PROVIDE ELBOW SUPPORTS AT ALL PIPE CONNECTIONS TO EQUIPMENT. DENS DENSITY SS STAINLESS STEEL <br /> M811 ACU CONTROLS <br /> S ,r•-, PIPE SLIDE� <br /> 36. FOR EXACT CONCRETE PAD/CURB SIZES COORDINATE WITH APPROVED EQUIPMENT AND WITH STRUCTURAL M612 ACU CONTROLS DIA DIAMETER STD STANDARD <br /> 18x12 AL_ M613 ACU CONTROLS ON DOWN STM STEAM <br /> ACOUSTIC LINING IN DUCT(SIZE NOTED INDICATES DOCUMENTS. M614 ACU CONTROLS <br /> CHANGE IN PIPE SIZE,CONCENTRIC REDUCER - - INSIDE CLEAR DIMENSIONS DRN DRAIN SYM SYMBOL Professional Seals <br /> UNLESS SPECIFIED DIFFERENTLY _ 18x12__ ) 37. SEE ARCHITECTURAL DOCUMENTS FOR PAINTING OF ALL EXPOSED DUCTWORK,PIPING,AIR OUTLET AND FIXTURE M615 ACU CONTROLS <br /> TRIM.ALL DUCTWORK AND PIPING ON MECHANICAL EQUIPMENT LEVEL(ROOF)IS TO BE PAINTED IN COMPLIANCE M616 EXHAUST CONTROLS DWG DRAWING SYS SYSTEM <br /> WITH DIVISION 15 AND DIVISION 9. <br /> ,� CAPPED PIPE M617 HVAC CONTROLS (E) EXISTING AT TEMPERATURE DIFF. �+ <br /> BDDt SGD�DSDp 38. INSTALL SHUT-OFF VALVES AT EACH BRANCH PIPE LINE. M618 HVAC CONTROLS Q4'of wAs <br /> fir' BACK DRAFT DAMPER/ EA EXHAUST AIR TEMP TEMPERATURE <br /> M621 HEATING WATER CONTROLS 'S C. <br /> NNE TYPE STRAINER WITH HOSE END BLOW OFF VALVE � ICI Rye SLIDE GATE DAMPER/ x <br /> BDD SI-+�FH 39. ALL DUCT SMOKE DETECTORS TO BE PROVIDED AND WIRED BY DIVISION 26�INSTALLED BY DIVISION 23.DETECTOR M631 FUEL OIL CONTROLS EAD EXHAUST AIR DUCT OR DAMPER TOP TOP OF PIPE !: • o <br /> DUCT SMOKE DETECTOR rn z <br /> SAMPLING TUBES TO HAVE AN ACCESS DOOR MAKING SAMPLING TUBES READILY ACCESSIBLE. M641 WATER HEATERS EAT ENTERING AIR TEMP. TOR TOP OF RACK <br /> fI � WYE TYPE STRAINER M651 MEDICAL GASES CONTROLS [.>r <br /> 40. UNLESS SPECIFICALLY SPECIFIED SHOWN OTHERWISE ALL CONSTRUCTION IS TO CONFORM TO BMACNA HVAC EDB ENTERING DRY BULB TEMP. TOT TOTAL 24672 <br /> CONSTRUCTION STANDARDS AS MINIMUM REQUIREMENT. M652 OVERALL SAS CONTROLS .rp4, 9 <br /> RPBP �,1 !� M711 DETAILS EF EXHAUST FAN TT TEMP.TRANSMITTER 4'ISTE 'G <br /> REDUCED PRESSURE BACKFLOW PREVENTER t-I y I •rlXl TONAL <br /> - ZH - C..7 41. FIRE DAMPERS AND FIRE SMOKE DAMPERS ARE TO BE INSTALLED IN RATED PORTION OF THE ASSEMBLIES IN WHICH EFF EFFICIENCY TYP TYPICAL <br /> SUPPLY DUCT TURNING UP.(IN ORDER SHOWN. THEY OCCUR. <br /> , S SIGHT GLASS RECTANGULAR,FLAT OVAL&ROUND) ET EXPANSION TANK U.C. UNDERCUT <br /> 42. REFER TO ARCHITECTURAL SPECIFICATION FOR APPROVED FIRESTOPPING SYSTEM. No. Description Data <br /> I�,1 $ HIGH PRESSURE STEAM TRAP ASSEMBLY EWB ENTERING WET BULB JOIN UNLESS OTHERWISE NOTED SCHEMATIC DESIGN 2020/01/24 <br /> 43. ALL PIPING NOTED TO BE CAPPED FOR FUTURE EXTENSION SHALL BE PROVIDED WITH VALVE NEAR CAP TO PERMIT EWT ENTERING WATER TEMP. V VOLT DESIGN DEVELOPMENT 2020/05/15 <br /> FUTURE CONNECTION OF THE SYSTEM. DESIGN DEVELOPMENT ADDENDUM 2020/06/08 <br /> f--�-� LOW PRESSURE STEAM TRAP ASSEMBLY EXH EXHAUST VA VALVE 50%CONTRACT DOCUMENTS 2020/09/31 <br /> 25 <br /> rLV C.J `V' SUPPLY DUCT TURNING DOWN.IN ORDER SHOWN. 44. INSTALL SHUT-OFF VALVES AT EACH BRANCH PIPE LINE. PERMIT TRACT DOCUMENTS 2020/11/13 <br /> PERMIT SET 2021/03/19 <br /> tT� RECTANGULAR,FLAT OVAL 8 ROUND) EXP EXPANSION VAV VARIABLE AIR VOLUME ISSUED FOR CONSTRUCTION 2021/03/19 <br /> BLIND FLANGE x pQ 45. ALL PLENUM BOXES,DUCTWORK ETC TO BE LOCATED INSIDE WALL CAVITIES OR INACCESSIBLE SPACES SHALL BE °F DEGREES FAHRENHEIT VERT VERTICAL <br /> TESTED FOR AIRTIGHT CONSTRUCTION BEFORE INSTALLATION. <br /> F FILTER VFD VARIABLE FREQ.DRIVE <br /> �HWS� HEATING WATER SUPPLY 46, SUBMIT 1/4"SCALE SHOP DWGS,COORDINATED WITH OTHER TRADES FOR REVIEW PRIOR TO COMMENCEMENT OF <br /> (F) FUTURE VOL VOLUME <br /> WORK. <br /> �HWR� HEATING WATER RETURN -Z FC FLEXIBLE CONNECTION W WATTS <br /> RETURN DUCT TURNING UP.(IN ORDER SHOWN. 47. COORDINATE SYSTEM SHUTDOWN WITH FACILITY ENGINEER.PROVIDE A MINIMUM OF 72 HOUR NOTICE.�--CHS-----4 FCU FAN COIL UNIT CHILLED WATER SUPPLY RECTANGULAR WB WET BULB <br /> 48. ALL PIPING TO BE LOCATED INSIDE WALL CAVITIES OR INACCESSIBLE SPACES SHALL BE LEAK TESTED AND FD FIRE DAMPER OR FLOOR DRAIN W/o WITHOUT <br /> �--CHR----� CHILLED WATER RETURN INSULATED WITH VAPOR BARRIER SEAL BEFORE INSTALLATION. <br /> FLA FULL LOAD AMPS WT WEIGHT <br /> 5PCHS----S PROCESS CHILLED WATER SUPPLY ra -> FUR FLOOR WTR WATER <br /> PCHR----S PROCESS CHILLED WATER RETURN S V J S v hrrrr�� FPI FINS PER INCH <br /> �- RETURN DUCT TURNING GOWN.(IN ORDER <br /> �CWS� WSR WALL SUPPLY REGISTER <br /> CONDENSER WATER SUPPLY i \ SHOWN.RECTANGULAR&ROUND) FPM FEET PER MINUTE WRR WALL RETURN REGISTER <br /> FPS FEET PER SECOND <br /> SCWR----� CONDENSER WATER RETURN <br /> FS FLOOR SINK <br /> �CBS CENTRIFUGAL SEPARATOR SUPPLY S--I Y I 5--1,C 1 FT FEET <br /> VVVVJJJJ `CJ' EXHAUST DUCT TURNING UP.(IN ORDER SHOWN. <br /> �CSR� CENTRIFUGAL SEPARATOR RETURN }TT�7l ()TTT RECTANGULAR&ROUND) FV FACE VELOCITY <br /> fLPS� GA GAGE OR GAUGE <br /> LOW PRESSURE STEAM(0.15 PSI) <br /> GPM GALLONS PER MINUTE <br /> �--LPR­-S LOW PRESSURE CONDENSATE RETURN(0-15 PSI) 3--rR>1 GPH GALLONS PER HOUR <br /> < EXHAUST DUCT TURNING DOWN.(IN ORDER <br /> f HPS 70 � HIGH PRESSURE STEAM(ABOVE 15 PSI,MAX STEAM -Tl�a SHOWN.RECTANGULAR&ROUND) GSM GALVANIZED SHEET METAL <br /> ( ) PRESSURE INDICATED) �J-lC�I l y l HC HEATING COIL <br /> HPR(70) HIGH PRESSURE CONDENSATE RETURN(ABOVE 15 PSI, HD HEAD <br /> MAX STEAM PRESSURE INDICATED) <br /> HGT HEIGHT <br /> �BBD� BOILER SLOWDOWN DUCT ACCESS DOOR HOA HAND,OFF,AUTO <br /> SFW---i BOILER FEEDWATER HP HORSEPOWER <br /> KIP Project No: CAP020407 <br /> f CDC CONDENSATE DRAIN P DUCT PITOT. HR HOUR(S) HOK Project No: 19.05002.03 <br /> HT HUMIDITY TRANSMITTER Sheet Title: <br /> f PCR PUMPED CONDENSATE FOR PITOT OF EXHUAST DUCT. HTP HEAT PUMP <br /> DRAIN LINE © ©IS FOR SUPPLY DUCT. MECHANICAL <br /> HVAC HEATING,VENTILATING <br /> �XX DESIGNATION <br /> MODULATING CONTROLVALVE,XX=SPECIAL AND AIR CONDITIONING LEGEND <br /> DESIGNATION EG:PI=PRESSURE INDEPENDENT ® DISPLAY MONITOR AND ALARM <br /> ❑XX 2-WAY 2-POSITION CONTROL VALVE,XX=SPECIAL HWR HEATING WATER RETURN <br /> a <br /> V AUDIO VISUAL ALARM HWS HEATING WATER SUPPLY <br /> fl: r. 3-WAY MODULATING CONTROL VALVE,XX=SPECIAL <br /> DESIGNATION(EG:PI=PRESSURE INDEPENDENT) HX HEAT EXCHANGER 0egmel ie 30 x az.Do not soolo os or I-cawing <br /> 3-WAY 2-POSITION CONTROL VALVE,XX=SPECIAL IffCAV CAV BOX IAC INSTRUMENT AIR COMPRESSOR Sheet Number w A <br /> f r. DESIGNATION(EG:BF=BUTTERFLY VALVE) IAS INSTRUMENT AIR SUPPLY '\ /'t00 <br /> m 2-WAY MODULATING CHARACTERIZED PORT BALL VALVE VAV VAV BOX <br /> S Cp \Y/I ID INSIDE DIMENSION I <br />