<br /> Kaiser Permanente Everett
<br /> Medical Clinic Expansion
<br /> 2015 WASHINGTON STATE ENERGY CODE
<br /> 2929 PINE STREET
<br /> 1. MECHANICAL EQUIPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING 32. ALL DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION C403.2.8 OF THE WSEC AND AS EVERETT,WA 98201
<br /> CONDITIONS NOT LESS THAN THE VALUES INDICATED IN TABLE C403.2.3(1)A THROUGH C403.2.3(1)C, DESCRIBED IN THE PROJECT MANUAL.
<br /> C403.2.3(2),C403.2.3(3),C403.2.3(4),C403.2.3(5),G403.2.3.(7),C40323(8),C403.2.3(9),C403.23(10),C403.2.3, - - Prepared for
<br /> C404.2 OF THE WSEC,AND AS INDICATED ON THE CONTRACT DOCUMENTS. OUTSIDE AIR DUCTS FROM EXTERIOR OF THE U-0.055(MEET AIR re P
<br /> SHAFTS/PLENUMS BUILDING TO THE LEAKAGE AND BUILDING KAISER FOUNDATION
<br /> 2. PROVIDE DEADBAND BETWEEN HEATINGICOOLING SPACE SENSOR SETPOINTS OF 5 DEGREES AS MECHANICAL SYSTEM ENVELOPE VAPOR CONTROL
<br /> REQUIRED BY SECTION C403.2A.1.2 OF THE WSEC OR AS DESCRIBED IN THE TEMPERATURE CONTROL REQUIREMENTS OF IBC) HEALTH PLAN, INC.
<br /> SEQUENCES. SUPPLY/RETURN/ UNCONDITIONED SPACES R-6
<br /> PLENUMS
<br /> 3. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF BEING SET FOR SUPPLY/RETURN/ OUTSIDE OF THE BUILDING R-8
<br /> SEVEN DIFFERENT DAY TYPES PER WEEK AND ALSO ACCOMPLISHING SETBACK OR SHUTDOWN DURING PLENUMS
<br /> UNOCCUPIED PERIODS AS REQUIRED BY SECTION C403.2.4.2 OF THE WSEC AND AS DESCRIBED IN THE SUPPLY WITH EXPOSED WITHIN R-3.3
<br /> TEMPERATURE CONTROL SEQUENCES. SUPPLY TEMP CONDITIONED SPACE
<br /> <557 OR>1057
<br /> 4. OUTSIDE AIR INTAKES,EXHAUST OUTLETS AND RELIEF OUTLETS SERVING CONDITIONED SPACES ALL OTHER CONCEALED FROM R-3.3
<br /> SHALL BE EQUIPPED WITH MOTORIZED DAMPERS AS REQUIRED BY SECTION C403.2.4.3 OF THE WSEC. SUPPLY DUCTS CONDITIONED SPACE
<br /> OUTSIDEAIR DOWNSTREAM OF DAMPER R-7
<br /> 5. HEATING AND COOLING SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC START CONTROLS PER DUCTS TO MECHANICAL SYSTEM
<br /> SECTION C403.2.4.2.3 OF THE WSEC.
<br /> 33. ALL PIPING SHALL BE INSULATED AS REQUIRED BY SECTION 0403.2.9 AND TABLE C403.2.9 OF THE
<br /> 6. PROVIDE BALANCING DAMPERS,TEMPERATURE AND PRESSURE TEST CONNECTIONS AND WSEC AND AS DESCRIBED IN THE PROJECT MANUAL:
<br /> BALANCING VALVES IN ALL AIR OUTLETS/INLETS,BRANCH DUCTS AND PIPE RUNS TO TERMINAL DEVICES AS PIPE DIAMETER:
<br /> REQUIRED BY SECTION G4052.2 OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. TEMPERATURE(°F) INSULATION <i"I 170<1-112"1-1/270<4"I 4'TO<6">8"
<br /> CONDUCTIVITY INSULATION THICKNESS:
<br /> 7. INDIVIDUAL ZONE TERMINAL UNITS AND HVAC SYSTEMS SERVING PORTIONS OF THE BUILDING ABOVE 350 .32-34 4.5 5.0 5.0 5.0 .0 ,
<br /> HAVING LESS THAN 24-HOUR OPERATION OR DIFFERENT USES SHALL BE SHUT OFF OR SET BACK DURING 251,350 .29-.32 3.0 4.0 4.5 4.5 .5
<br /> UNOCCUPIED PERIODS AS REQUIRED BY SECTION C403.2.4 OF THE WSEC AND AS DESCRIBED IN THE 201-250 .27-.30 2.5 2.5 2.5 3.0 .0
<br /> TEMPERATURE CONTROL SEQUENCES. 141-200 .25.29 1.5 1.5 2.0 2.0 .0
<br /> 105-140 .21-.28 1.0 1.0 1.5 1.5 .5
<br /> 8. MOTOR EFFICIENCY SHALL NOT BE LESS THAN THE MINIMUM REQUIREMENTS PER SECTION C405.8 61.104 .21-.28 1.0 1.0 1.5 1.5 .5
<br /> OF THE WSEC FOR FULL LOAD EFFICIENCIES.FRACTIONAL HP MOTORS 1/12 HP AND GREATER AND LESS 40.60 .21-.27 0.5 0.5 1.0 1.0 .0
<br /> THAN 1 HP SHALL BE ELECTRONICALLY COMMUTATED MOTORS. BELOW 40 .20-.26 0.5 1.0 1.0 1.0 .5
<br /> NOTE:PIPING INSULATION MEETS OR EXCEEDS WSEC.
<br /> 9. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY SECTION C103.6.1 OF
<br /> THE WSEC.THE DRAWINGS SHALL INDICATE THE LOCATION AND PERFORMANCE DATA OF EQUIPMENT, 34. PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE AS REQUIRED Hellmuth,Obata&Kassabaum,Inc.
<br /> GENERAL CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION SYSTEMS,INCLUDING FLOW RATES BY SECTION r403.2.8.1 OF THE WSEC AND AS DESCRIBED IN THE PROJECT MANUAL. 1218 Third Avenue,Suite 1315
<br /> AS AMINIMUM. Seattle,WA 98101 USA
<br /> 3S AUTOMATIC-CIRCULATING HOT WATER AND HEAT-TRACED SYSTEM PIPING SHALL BE INSULATED t+1 206 493 1771 f+1 206 493 1778
<br /> 10. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY AS REQUIRED BY SECTION C404.6:
<br /> SECTION C103.6 OFTHEWSECANDAS SPECIFIED. SYSTEM INSULATION INSULATION
<br /> CONDUCTIVITY
<br /> D TIVITY THICKNESS All reProa�oroo&mtellectoel oroaarxy rights rasarvaa
<br /> 11. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C408.2.2 AND OF THE WSEC AND AUTOMATIC-CIRCULATING <.27 1.11 2019
<br /> AS SPECIFIED. HOT WATER In Association with
<br /> HEAT TRACED <.27 1.0
<br /> 12. COMMISSIONING SHALL BE PROVIDED AND REPORT OF COMMISSIONING BE SUBMITTED TO THE SYSTEMS Mortensen
<br /> OWNER AS REQUIRED BY SECTION C408 OF THE WSEC.COMMISSIONING SHALL CONSIST OF A SERVED BY EQUIPMENT <.27 0.5 General Contractor
<br /> COMMISSIONING PLAN,BALANCING,FUNCTIONAL PERFORMANCE TESTING,POST CONSTRUCTION WITHOUT INTEGRAL (FIRST 8'OF PIPE)
<br /> COMMISSIONING,TRAINING,REPORTS,ACCEPTANCE AND COMMISSIONING COMPLIANCE CHECKLIST. HEAT TRAPS 10230 NE Points Drive,Suite 300
<br /> Kirkland,WA 98033
<br /> 13. HEATING AND COOLING SYSTEMS HAVE BEEN SIZED IN ACCORDANCE WITH SECTION C403.2.2 OF
<br /> THE WSEC.CALCULATION OF HEATING AND COOLING LOADS DETERMINED IN ACCORDANCE WITH ASHRAE ConXtech,Inc
<br /> STANDARD 183 OR EQUIVALENT PER CHAPTER THREE AS REQUIRED BY SECTION C403.2.1 OF THE WSEC. Structural Fabricator
<br /> 14. ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED PER IMC,C402 LEAKAGE REQUIREMENTS 6701 Koll Center Parkway,Suite 150
<br /> AND IBC VAPOR RETARDER REQUIREMENTS AS REQUIRED BY SECTION r403.2.8.3.1 AND C403.2.8.3.3 OF THE Pleasanton,CA 94566
<br /> WSEC.
<br /> DUCTWORK STATIC PRESSURE AND SEAL CLASS:
<br /> KPFF Consulting Engineers
<br /> WATER COLUMN SEAL CLASS
<br /> 1/2 TO 3INCHES SEAL TRANSVERSE JOINTSAND LONGITUDINAL SEAMS Civil+Swcwrel Engineering
<br /> ABOVE3INCHES SEAL TRANSVERSE JOINTS,LONGITUDINAL SEAMS AND 1601 Fifth Avenue,Suite 1600
<br /> DUCT WALL PENETRATIONS Seattle,WA 98101
<br /> 15. DUCTWORK DESIGNED TO OPERATE IN EXCESS OF 3INCHES W.G.SHALL BE TESTED AS REQUIRED Me etti
<br /> BY SECTION C403.2.8.3.3 OF THE WSEC.PROVIDE TEST REPORTS TO THE OWNER. MEP+FP Engineering
<br /> 16, LOCATION OF LOW,MEDIUM AND HIGH PRESSURE DUCTWORK IS IDENTIFIED IN THE PROJECT 2013 4th Avenue,Suite 200
<br /> MANUAL AS REQUIRED BY SECTION C403.2.8.3.1-3. Seattle,WA 98121
<br /> 17, ALL AIR SYSTEMS SHALL BE PROVIDED WITH A 100%CAPABLE AIR ECONOMIZER CAPABILITY AS
<br /> REQUIRED BY THE SECTION C403.3 OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE CONTROL Key Plan
<br /> SEQUENCES,EXCEPT AS NOTED ON EQUIPMENT SCHEDULES WHERE SPECIFIC EXEMPTIONS PER THE
<br /> WSEC ARE FOLLOWED.
<br /> 18. AIR ECONOMIZERS SHALL BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN WHEN ADDITIONAL
<br /> MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER OF THE COOLING LOAD AS REQUIRED IN
<br /> SECTION C403.3.1 OF THE WSEC.
<br /> 19. FAN AND PUMP MOTORS 7.5 HP AND GREATER SHALL BE PROVIDED WITH VARIABLE FREQUENCY
<br /> DRIVES PER THE REQUIREMENTS OF SECTION C403.2.13 OF THE WSEC AND AS DESCRIBED IN THE
<br /> CONTRACT DOCUMENTS INCLUDING TEMPERATURE CONTROL SEQUENCES.THIS REQUIREMENT APPLIES
<br /> TO ALL SYSTEMS,INCLUDING CONSTANT SPEED SYSTEMS.
<br /> 20. ZONES CONNECTED BY OPENINGS GREATER THAN 10 PERCENT OF THE FLOOR AREA OF EITHER
<br /> ZONE SHALL BE CONFIGURED SUCH THAT SIMULTANEOUS HEATING AND COOLING IS LOCKED OUT UNTIL
<br /> THE DIFFERENCE BETWEEN ZONE TEMPERATURES IS AT LEAST 5°F,AS REQUIRED BY C403.2.4.1.
<br /> 21. FANS SHALL HAVE A FAN EFFICIENCY GRADE OF 67 OR HIGHER.TOTAL EFFICIENCY OF FAN AT
<br /> DESIGN POINT OF OPERATION SHALL BE WITHIN 15 PERCENTAGE POINTS OF THE MAXIMUM TOTAL
<br /> EFFICIENCY OF THE FAN,AS REQUIRED BY C403.2.11.3. Professional Seals
<br /> 22, DOMESTIC HOT WATER CIRCULATION PUMPS SHALL BE SHUTDOWN DURING UNOCCUPIED
<br /> PERIODS AS REQUIRED BY SECTION C404.7.1 OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE 4,y.W
<br /> CONTROLSEQUENCES. � OF AS
<br /> 23. DOMESTIC HOT WATER PIPING SHALL NOT EXCEED THE FLOW RATE LIMITATIONS PER C404.3. Fe p
<br /> � z
<br /> 24. THE DOMESTIC HOT WATER SYSTEM SHALL BE INSTALLED SUCH THAT THE MAXIMUM LENGTH OF
<br /> UNCIRCULATED HOT WATER PIPING SHALL NOT EXCEED THE VALUES LISTED IN TABLE C404.3.1.THE 2467z
<br /> UNCIRCULATED PIPE IS THE SECTION THAT EXPERIENCES ZERO FLOW WHEN THE PLUMBING FIXTURE IS +PLO ,9
<br /> NOT IN USE. �T G
<br /> TONAL
<br /> 25. SUPPLY AIR AND WATER TEMPERATURES SHALL BE AUTOMATICALLY RESET AS REQUIRED IN
<br /> SECTION C403.4.2.4 AND C403.4.4.4 OF THE WSEC OR AS DESCRIBED IN THE TEMPERATURE CONTROL
<br /> SEQUENCES. No. Description Date
<br /> SCHEMATIC DESIGN 2020/01/24
<br /> 26. BOILER SYSTEMS WITH A COMBINED DESIGN INPUT OF GREATER THAN 1,000 MBH SHALL BE DESIGN DEVELOPMENT 2 02 010 511 5
<br /> PROVIDED WITH A MINIMUM TURNDOWN RATIO OF 3 TO 1(UP TO 5,000 MBH),4 TO 1(UP TO 10,000 MBH),OR DESIGN DEVELOPMENT ADDENDUM 2020/06/08
<br /> 5 TO 1(GREATER THAN 10,000 MBH)PER C403.4.2.5.TURNDOWN SHALL CONSIDER MULTIPLE STAGES OF 50%CONTRACT DOCUMENTS 2020/07/31
<br /> SINGLE INPUT BOILERS AND MODULATING BOILERS. 75%CONTRACT DOCUMENTS 2020/09/25
<br /> PERMIT SET 2020/11/13
<br /> ISSUED FOR CONSTRUCTION 2021/03/19
<br /> 27, MULTIPLE-ZONE VAV SYSTEMS WHICH SOLELY UTILIZE SINGLE-DUCT AIR TERMINAL UNITS AND DO
<br /> NOT HAVE EXHAUST AIR ENERGY RECOVERY SHALL BE CONFIGURED TO AUTOMATICALLY REDUCE OUTSIDE
<br /> AIR INTAKE FLOW BASED ON CHANGES IN SYSTEM VENTILATION EFFICIENCY.
<br /> 28. GAS-FIRED WATER-HEATING EQUIPMENT WITH A COMBINED INPUT RATING OF 1,000 MBH OR
<br /> GREATER SHALL HAVE A MINIMUM THERMAL EFFICIENCY,ET,OF 90 PERCENT,AS REQUIRED BY C404.2.1.
<br /> 29. AIR-COOLED UNITARY DX EQUIPMENT 54,000 BTU/H AND GREATER PROBIDED WITH ECONOMIZERS
<br /> SHALL BE PROBIDED WITH FAULT DETECTION AND DIANOSTICS SYSTEMS AS REQUIRED BY SECTION
<br /> C403.2.4.7.
<br /> 30. DIRECT EXPANSION UNITS PROVIDED WITH AIRS IDE ECONOMIZER AND A COOLING CAPACITY OF 65
<br /> MBH OR GREATER SHALL HAVE A MINIMUM NUMBER OF MECHANICAL COOLING STAGES PER THE
<br /> FOLLOWING TABLE,PER C403.3.I:
<br /> CV OR VAV CLG CAPACITY(MBHI NUMBER OF STAGES
<br /> CV >-65MBH 2
<br /> VAV 65MBH< X<240MBH 3
<br /> VAV >=240MBH 4
<br /> 31. DIRECT EXPANSION UNITS WITH A COOLING CAPACITY OF 65 MBH OR GREATER SHALL HAVE NO
<br /> FEWER THAN TWO STAGES OF FAN CONTROL AS REQUIRED BY SECTION C403.2.11.5.
<br /> KIP Project No: CAP020407
<br /> HOK Project No: 19.05002.03
<br /> Sheet Title:
<br /> WSEC COMPLIANCE
<br /> AND GENERAL NOTES
<br /> a
<br /> IN
<br /> origm,3l is 30 x 42.Do moo,sceie ooncents or tm m-i„g.
<br /> Sheet Number
<br /> M010