Laserfiche WebLink
• <br /> KAER <br /> PER ANENTE <br /> Project <br /> Kaiser Permanente Everett <br /> Medical Clinic Expansion <br /> 2015 WASHINGTON STATE ENERGY CODE <br /> 2929 PINE STREET <br /> 1. MECHANICAL EQUIPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING 32. ALL DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION C403.2.8 OF THE WSEC AND AS EVERETT,WA 98201 <br /> CONDITIONS NOT LESS THAN THE VALUES INDICATED IN TABLE C403.2.3(1)A THROUGH C403.2.3(1)C, DESCRIBED IN THE PROJECT MANUAL. <br /> C403.2.3(2),C403.2.3(3),C403.2.3(4),C403.2.3(5),G403.2.3.(7),C40323(8),C403.2.3(9),C403.23(10),C403.2.3, - - Prepared for <br /> C404.2 OF THE WSEC,AND AS INDICATED ON THE CONTRACT DOCUMENTS. OUTSIDE AIR DUCTS FROM EXTERIOR OF THE U-0.055(MEET AIR re P <br /> SHAFTS/PLENUMS BUILDING TO THE LEAKAGE AND BUILDING KAISER FOUNDATION <br /> 2. PROVIDE DEADBAND BETWEEN HEATINGICOOLING SPACE SENSOR SETPOINTS OF 5 DEGREES AS MECHANICAL SYSTEM ENVELOPE VAPOR CONTROL <br /> REQUIRED BY SECTION C403.2A.1.2 OF THE WSEC OR AS DESCRIBED IN THE TEMPERATURE CONTROL REQUIREMENTS OF IBC) HEALTH PLAN, INC. <br /> SEQUENCES. SUPPLY/RETURN/ UNCONDITIONED SPACES R-6 <br /> PLENUMS <br /> 3. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF BEING SET FOR SUPPLY/RETURN/ OUTSIDE OF THE BUILDING R-8 <br /> SEVEN DIFFERENT DAY TYPES PER WEEK AND ALSO ACCOMPLISHING SETBACK OR SHUTDOWN DURING PLENUMS <br /> UNOCCUPIED PERIODS AS REQUIRED BY SECTION C403.2.4.2 OF THE WSEC AND AS DESCRIBED IN THE SUPPLY WITH EXPOSED WITHIN R-3.3 <br /> TEMPERATURE CONTROL SEQUENCES. SUPPLY TEMP CONDITIONED SPACE <br /> <557 OR>1057 <br /> 4. OUTSIDE AIR INTAKES,EXHAUST OUTLETS AND RELIEF OUTLETS SERVING CONDITIONED SPACES ALL OTHER CONCEALED FROM R-3.3 <br /> SHALL BE EQUIPPED WITH MOTORIZED DAMPERS AS REQUIRED BY SECTION C403.2.4.3 OF THE WSEC. SUPPLY DUCTS CONDITIONED SPACE <br /> OUTSIDEAIR DOWNSTREAM OF DAMPER R-7 <br /> 5. HEATING AND COOLING SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC START CONTROLS PER DUCTS TO MECHANICAL SYSTEM <br /> SECTION C403.2.4.2.3 OF THE WSEC. <br /> 33. ALL PIPING SHALL BE INSULATED AS REQUIRED BY SECTION 0403.2.9 AND TABLE C403.2.9 OF THE <br /> 6. PROVIDE BALANCING DAMPERS,TEMPERATURE AND PRESSURE TEST CONNECTIONS AND WSEC AND AS DESCRIBED IN THE PROJECT MANUAL: <br /> BALANCING VALVES IN ALL AIR OUTLETS/INLETS,BRANCH DUCTS AND PIPE RUNS TO TERMINAL DEVICES AS PIPE DIAMETER: <br /> REQUIRED BY SECTION G4052.2 OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. TEMPERATURE(°F) INSULATION <i"I 170<1-112"1-1/270<4"I 4'TO<6">8" <br /> CONDUCTIVITY INSULATION THICKNESS: <br /> 7. INDIVIDUAL ZONE TERMINAL UNITS AND HVAC SYSTEMS SERVING PORTIONS OF THE BUILDING ABOVE 350 .32-34 4.5 5.0 5.0 5.0 .0 , <br /> HAVING LESS THAN 24-HOUR OPERATION OR DIFFERENT USES SHALL BE SHUT OFF OR SET BACK DURING 251,350 .29-.32 3.0 4.0 4.5 4.5 .5 <br /> UNOCCUPIED PERIODS AS REQUIRED BY SECTION C403.2.4 OF THE WSEC AND AS DESCRIBED IN THE 201-250 .27-.30 2.5 2.5 2.5 3.0 .0 <br /> TEMPERATURE CONTROL SEQUENCES. 141-200 .25.29 1.5 1.5 2.0 2.0 .0 <br /> 105-140 .21-.28 1.0 1.0 1.5 1.5 .5 <br /> 8. MOTOR EFFICIENCY SHALL NOT BE LESS THAN THE MINIMUM REQUIREMENTS PER SECTION C405.8 61.104 .21-.28 1.0 1.0 1.5 1.5 .5 <br /> OF THE WSEC FOR FULL LOAD EFFICIENCIES.FRACTIONAL HP MOTORS 1/12 HP AND GREATER AND LESS 40.60 .21-.27 0.5 0.5 1.0 1.0 .0 <br /> THAN 1 HP SHALL BE ELECTRONICALLY COMMUTATED MOTORS. BELOW 40 .20-.26 0.5 1.0 1.0 1.0 .5 <br /> NOTE:PIPING INSULATION MEETS OR EXCEEDS WSEC. <br /> 9. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY SECTION C103.6.1 OF <br /> THE WSEC.THE DRAWINGS SHALL INDICATE THE LOCATION AND PERFORMANCE DATA OF EQUIPMENT, 34. PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE AS REQUIRED Hellmuth,Obata&Kassabaum,Inc. <br /> GENERAL CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION SYSTEMS,INCLUDING FLOW RATES BY SECTION r403.2.8.1 OF THE WSEC AND AS DESCRIBED IN THE PROJECT MANUAL. 1218 Third Avenue,Suite 1315 <br /> AS AMINIMUM. Seattle,WA 98101 USA <br /> 3S AUTOMATIC-CIRCULATING HOT WATER AND HEAT-TRACED SYSTEM PIPING SHALL BE INSULATED t+1 206 493 1771 f+1 206 493 1778 <br /> 10. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY AS REQUIRED BY SECTION C404.6: <br /> SECTION C103.6 OFTHEWSECANDAS SPECIFIED. SYSTEM INSULATION INSULATION <br /> CONDUCTIVITY <br /> D TIVITY THICKNESS All reProa�oroo&mtellectoel oroaarxy rights rasarvaa <br /> 11. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C408.2.2 AND OF THE WSEC AND AUTOMATIC-CIRCULATING <.27 1.11 2019 <br /> AS SPECIFIED. HOT WATER In Association with <br /> HEAT TRACED <.27 1.0 <br /> 12. COMMISSIONING SHALL BE PROVIDED AND REPORT OF COMMISSIONING BE SUBMITTED TO THE SYSTEMS Mortensen <br /> OWNER AS REQUIRED BY SECTION C408 OF THE WSEC.COMMISSIONING SHALL CONSIST OF A SERVED BY EQUIPMENT <.27 0.5 General Contractor <br /> COMMISSIONING PLAN,BALANCING,FUNCTIONAL PERFORMANCE TESTING,POST CONSTRUCTION WITHOUT INTEGRAL (FIRST 8'OF PIPE) <br /> COMMISSIONING,TRAINING,REPORTS,ACCEPTANCE AND COMMISSIONING COMPLIANCE CHECKLIST. HEAT TRAPS 10230 NE Points Drive,Suite 300 <br /> Kirkland,WA 98033 <br /> 13. HEATING AND COOLING SYSTEMS HAVE BEEN SIZED IN ACCORDANCE WITH SECTION C403.2.2 OF <br /> THE WSEC.CALCULATION OF HEATING AND COOLING LOADS DETERMINED IN ACCORDANCE WITH ASHRAE ConXtech,Inc <br /> STANDARD 183 OR EQUIVALENT PER CHAPTER THREE AS REQUIRED BY SECTION C403.2.1 OF THE WSEC. Structural Fabricator <br /> 14. ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED PER IMC,C402 LEAKAGE REQUIREMENTS 6701 Koll Center Parkway,Suite 150 <br /> AND IBC VAPOR RETARDER REQUIREMENTS AS REQUIRED BY SECTION r403.2.8.3.1 AND C403.2.8.3.3 OF THE Pleasanton,CA 94566 <br /> WSEC. <br /> DUCTWORK STATIC PRESSURE AND SEAL CLASS: <br /> KPFF Consulting Engineers <br /> WATER COLUMN SEAL CLASS <br /> 1/2 TO 3INCHES SEAL TRANSVERSE JOINTSAND LONGITUDINAL SEAMS Civil+Swcwrel Engineering <br /> ABOVE3INCHES SEAL TRANSVERSE JOINTS,LONGITUDINAL SEAMS AND 1601 Fifth Avenue,Suite 1600 <br /> DUCT WALL PENETRATIONS Seattle,WA 98101 <br /> 15. DUCTWORK DESIGNED TO OPERATE IN EXCESS OF 3INCHES W.G.SHALL BE TESTED AS REQUIRED Me etti <br /> BY SECTION C403.2.8.3.3 OF THE WSEC.PROVIDE TEST REPORTS TO THE OWNER. MEP+FP Engineering <br /> 16, LOCATION OF LOW,MEDIUM AND HIGH PRESSURE DUCTWORK IS IDENTIFIED IN THE PROJECT 2013 4th Avenue,Suite 200 <br /> MANUAL AS REQUIRED BY SECTION C403.2.8.3.1-3. Seattle,WA 98121 <br /> 17, ALL AIR SYSTEMS SHALL BE PROVIDED WITH A 100%CAPABLE AIR ECONOMIZER CAPABILITY AS <br /> REQUIRED BY THE SECTION C403.3 OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE CONTROL Key Plan <br /> SEQUENCES,EXCEPT AS NOTED ON EQUIPMENT SCHEDULES WHERE SPECIFIC EXEMPTIONS PER THE <br /> WSEC ARE FOLLOWED. <br /> 18. AIR ECONOMIZERS SHALL BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN WHEN ADDITIONAL <br /> MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER OF THE COOLING LOAD AS REQUIRED IN <br /> SECTION C403.3.1 OF THE WSEC. <br /> 19. FAN AND PUMP MOTORS 7.5 HP AND GREATER SHALL BE PROVIDED WITH VARIABLE FREQUENCY <br /> DRIVES PER THE REQUIREMENTS OF SECTION C403.2.13 OF THE WSEC AND AS DESCRIBED IN THE <br /> CONTRACT DOCUMENTS INCLUDING TEMPERATURE CONTROL SEQUENCES.THIS REQUIREMENT APPLIES <br /> TO ALL SYSTEMS,INCLUDING CONSTANT SPEED SYSTEMS. <br /> 20. ZONES CONNECTED BY OPENINGS GREATER THAN 10 PERCENT OF THE FLOOR AREA OF EITHER <br /> ZONE SHALL BE CONFIGURED SUCH THAT SIMULTANEOUS HEATING AND COOLING IS LOCKED OUT UNTIL <br /> THE DIFFERENCE BETWEEN ZONE TEMPERATURES IS AT LEAST 5°F,AS REQUIRED BY C403.2.4.1. <br /> 21. FANS SHALL HAVE A FAN EFFICIENCY GRADE OF 67 OR HIGHER.TOTAL EFFICIENCY OF FAN AT <br /> DESIGN POINT OF OPERATION SHALL BE WITHIN 15 PERCENTAGE POINTS OF THE MAXIMUM TOTAL <br /> EFFICIENCY OF THE FAN,AS REQUIRED BY C403.2.11.3. Professional Seals <br /> 22, DOMESTIC HOT WATER CIRCULATION PUMPS SHALL BE SHUTDOWN DURING UNOCCUPIED <br /> PERIODS AS REQUIRED BY SECTION C404.7.1 OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE 4,y.W <br /> CONTROLSEQUENCES. � OF AS <br /> 23. DOMESTIC HOT WATER PIPING SHALL NOT EXCEED THE FLOW RATE LIMITATIONS PER C404.3. Fe p <br /> � z <br /> 24. THE DOMESTIC HOT WATER SYSTEM SHALL BE INSTALLED SUCH THAT THE MAXIMUM LENGTH OF <br /> UNCIRCULATED HOT WATER PIPING SHALL NOT EXCEED THE VALUES LISTED IN TABLE C404.3.1.THE 2467z <br /> UNCIRCULATED PIPE IS THE SECTION THAT EXPERIENCES ZERO FLOW WHEN THE PLUMBING FIXTURE IS +PLO ,9 <br /> NOT IN USE. �T G <br /> TONAL <br /> 25. SUPPLY AIR AND WATER TEMPERATURES SHALL BE AUTOMATICALLY RESET AS REQUIRED IN <br /> SECTION C403.4.2.4 AND C403.4.4.4 OF THE WSEC OR AS DESCRIBED IN THE TEMPERATURE CONTROL <br /> SEQUENCES. No. Description Date <br /> SCHEMATIC DESIGN 2020/01/24 <br /> 26. BOILER SYSTEMS WITH A COMBINED DESIGN INPUT OF GREATER THAN 1,000 MBH SHALL BE DESIGN DEVELOPMENT 2 02 010 511 5 <br /> PROVIDED WITH A MINIMUM TURNDOWN RATIO OF 3 TO 1(UP TO 5,000 MBH),4 TO 1(UP TO 10,000 MBH),OR DESIGN DEVELOPMENT ADDENDUM 2020/06/08 <br /> 5 TO 1(GREATER THAN 10,000 MBH)PER C403.4.2.5.TURNDOWN SHALL CONSIDER MULTIPLE STAGES OF 50%CONTRACT DOCUMENTS 2020/07/31 <br /> SINGLE INPUT BOILERS AND MODULATING BOILERS. 75%CONTRACT DOCUMENTS 2020/09/25 <br /> PERMIT SET 2020/11/13 <br /> ISSUED FOR CONSTRUCTION 2021/03/19 <br /> 27, MULTIPLE-ZONE VAV SYSTEMS WHICH SOLELY UTILIZE SINGLE-DUCT AIR TERMINAL UNITS AND DO <br /> NOT HAVE EXHAUST AIR ENERGY RECOVERY SHALL BE CONFIGURED TO AUTOMATICALLY REDUCE OUTSIDE <br /> AIR INTAKE FLOW BASED ON CHANGES IN SYSTEM VENTILATION EFFICIENCY. <br /> 28. GAS-FIRED WATER-HEATING EQUIPMENT WITH A COMBINED INPUT RATING OF 1,000 MBH OR <br /> GREATER SHALL HAVE A MINIMUM THERMAL EFFICIENCY,ET,OF 90 PERCENT,AS REQUIRED BY C404.2.1. <br /> 29. AIR-COOLED UNITARY DX EQUIPMENT 54,000 BTU/H AND GREATER PROBIDED WITH ECONOMIZERS <br /> SHALL BE PROBIDED WITH FAULT DETECTION AND DIANOSTICS SYSTEMS AS REQUIRED BY SECTION <br /> C403.2.4.7. <br /> 30. DIRECT EXPANSION UNITS PROVIDED WITH AIRS IDE ECONOMIZER AND A COOLING CAPACITY OF 65 <br /> MBH OR GREATER SHALL HAVE A MINIMUM NUMBER OF MECHANICAL COOLING STAGES PER THE <br /> FOLLOWING TABLE,PER C403.3.I: <br /> CV OR VAV CLG CAPACITY(MBHI NUMBER OF STAGES <br /> CV >-65MBH 2 <br /> VAV 65MBH< X<240MBH 3 <br /> VAV >=240MBH 4 <br /> 31. DIRECT EXPANSION UNITS WITH A COOLING CAPACITY OF 65 MBH OR GREATER SHALL HAVE NO <br /> FEWER THAN TWO STAGES OF FAN CONTROL AS REQUIRED BY SECTION C403.2.11.5. <br /> KIP Project No: CAP020407 <br /> HOK Project No: 19.05002.03 <br /> Sheet Title: <br /> WSEC COMPLIANCE <br /> AND GENERAL NOTES <br /> a <br /> IN <br /> origm,3l is 30 x 42.Do moo,sceie ooncents or tm m-i„g. <br /> Sheet Number <br /> M010 <br />