My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST 2025-03-27
>
Address Records
>
MAPLE ST
>
2930
>
2930 MAPLE ST 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 2:59:34 PM
Creation date
2/6/2025 11:28:38 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> KAER <br /> PER ANENTE <br /> Project <br /> Kaiser Permanente Everett <br /> Medical Clinic Expansion <br /> 2929 PINE STREET <br /> EVERETT,WA 98201 <br /> Prepared for <br /> KAISER FOUNDATION <br /> TO GEN EXH HEALTH PLAN, INC. <br /> PROTOCOLS FOR CLOSE-OUT TESTING OF OPERATING ROOM HVAC: <br /> 1.1 TESTING RESULTS REPORT <br /> A. PROVIDE A COMPLETE REPORT OF TESTING AND FINDINGS <br /> RM#2501 B. INCLUDE AND EXECUTIVE SUMMARY STATEMENT OF COMPLIANCE ACHIEVED. <br /> RM#2118 OFFICES C. INCLUDE A SUMMARY OF DESIGN PARAMETERS,INCLUDING THE FOLLOWING: <br /> ANESTHESIA WOR10i00M SA:805 CFM 1. OCCUPIED MODE:TOTAL SUPPLY AIR,AIR CHANGES PER HOUR,AIR VELOCITY <br /> SA 505 CFM RA:fi05 CFM AT CEILING DIFFUSER <br /> RA:O CFM EA:o CFM 2. UNOCCUPIED MODE:TOTAL SUPPLY AIR,AIR CHANGES PER HOUR,AIR <br /> EA fi55 CFM TA:0 CFM <br /> VAV TA-150 CFM RM#211] VELOCITY AT CEILING DIFFUSER <br /> 3-2-1 NURSE STATION VAV <br /> SA:1]S CFM 213 7.2 PRE-REQUISITES FOR CERTIFICATION TESTING <br /> TA 150 CFM RA 175 CFM A. ROOM PRESSURIZATION BALANCE AND COMMISSIONING:ROOM PRESSURES <br /> EA:0 CFM VAV SHALL BE DEMONSTRATED TO MEET DESIGN REQUIREMENTS.(2 0.02"WC, <br /> TA:0 CFM 2 13 MINIMUM FOR ALARM=0.01 WC) <br /> FY� B. AIR FLOW(AIR CHANGES)BA LANCE AND COMMISSIONING:AIR FLOWTO THE , <br /> ROOM AND BALANCE WITHIN THE ROOM SHALL BE DEMONSTRATED TO MEET <br /> DESIGN REQUIREMENTS,PER DESIGN DOCUMENTS.TAKE AIRFLOWS AT 6"TO <br /> 12'BELOW THE DIFFUSER SCREEN. <br /> VAV C. SETBACK SEQUENCE OF OPERATIONS,FUNCTIONAL TESTING:OPERATING <br /> VAV P-14 ROOMZONESSHOULD FUNCTION TO TURNDOWN TO MINIMUM POSITION DURING <br /> VAV VAV 3-2-0 UNOCCUPIED HOURS. <br /> D. PRE-REQUISITE PERFORMANCE REVIEWED BY FOR AND CXA PRIOR TO <br /> -2-01 VAV VAVCERTIFICATION TESTING, <br /> 3-2-03 3-2414 E. ALL TESTS SHOULD BE CONDUCTED AFTER EVS ROOM CLEANING AND Hellmuth,Obata&Kassabaum,Inc. <br /> Tk 150 CFM TA 150 CFM TA 100 CFM TO GEN EXH STERILIZATION. 1218 Third Avenue,Suite 1315 <br /> RM#2105 1.3 PARTICLE TESTING Seattle,WA 98101 USA <br /> PATIENT CORRIDOR A. PASS LEVEL FOR KP OPERATING ROOMS IS ISO CLASS 6,PER ISO 14644 It+1 206 493 1771 f+1 206 493 1778 <br /> TA 150 CFM SA:745 CFM B. DEMONSTRATION OF COMPLIANCE SHOULD INCLUDE AT MINIMUM: <br /> RA:0 CFM 1. MULTIPLE MEASUREMENTS OF THE PARTICLES,0.5 MICRON AND ABOVE, <br /> RM#2115 EA:0 CFM All reprotluction 8 intellectual property <br /> TA 150 CFM rights reserves <br /> TA:0 CFM SHOWING LESS THAN 35,200 PARTICLES PER CUBIC METER zo19 <br /> TO JANITOR 2. MULTIPLE MEASUREMENTS OF THE PARTICLES,5 MICRON AND ABOVE, <br /> (CEILIN4 SA CONNECTIONSDESH TO EPA FILTRATION <br /> (CEILIN4Y CONNECTIONSDS INTEGRATED FILTRATION <br /> SA:OCFMLESSUBIC In Association with <br /> (CEILING BY OTHERS),INCLUDE.PROVIDE(1)DON (CEILING BAR FLOW <br /> S.PROVIDE(1)D ON TESTINSHOWIG <br /> SHOULD OCCUR <br /> UR PARTICLES PER CON METER. <br /> AND LAMINAR FLOW DIFFUSERS.PROVIDE 1 DP AND LAMINAR FLOW DIFFUSERS.PROVIDE(1)DP RA:O CFM <br /> RM#2]00 () RM#2118 EA:150 CFM C. TESTING SHOULD OCCUR SPECIFIED THE"AT REST"CONDITION:HVAC SYSTEMS <br /> SENSOR ACROSS FILTER ASSEMBLY SENSOR ACROSS FILTER ASSEMBLY SUPPLY AND RETURN <br /> PATIENT CORRIDOR JANITOR TA:-15o CFM MIN U ES.THE E SHOULDING AT NOO OCCUOPERPANTS <br /> OR CONNG TAMINAONSNT <br /> FOR O LEAST N Mortenson <br /> SA 120 CFM DUCTS FROM RTU-3 MINUTES.THERE SHOULD BE NO OCCUPANTS OR CONTAMINANT SOURCES IN General Contractor <br /> SA 1490 CFM VAV RA:O CFM THE SPACE. <br /> RA:1640 CFM ypy 10230 d, Points Drive,Suite 300 <br /> EA 0 CFM RM#2122 RM#2121 EA 270 CFM D. TESTING LOCATIONS <br /> 2-02 TA-150 CFM 2-14 Kirkland,WA 98033 <br /> TA:-150 CFM TOTAL AIR CHANGES <br /> TOTAL OPERATING ROOM 1. FLOOR. <br /> SA:1920 CFM SA:2400 CFM 2. MINIMUM21_0CATIONS AT THE CENTERLINE OF THE TABLE(LONG DIMENSION). ConXtech,Inc <br /> RA:1670 CFM RA:215o CFM 3. MINIMUM 3 LOCATIONS PER SIDE AT 12"FROM OUTSIDE OF THE TABLE EDGE Structurel Fabricator <br /> EA:0 CFM EA:0 CFM LONG <br /> TA:+250 CFM TA:+250 CFM 1 SIDE <br /> ) 6701 Koll Center Parkway,Suite 150 <br /> RM DP RELATIVE TO RM DP RELATIVE TO E. APPLICABLE STANDARDS I PROTOCOLS:IEST-RP-CC-006;ISO 14644;ISO 21514 Pleasanton,CA 94566 <br /> ADJACENT SPACES:+0.02" ADJACENT SPACES:+0.02' VAV (PARTICLE COUNTER CALIBRATION);ISO 14644-1(MINIMUM SAMPLE VOLUME, <br /> RM DP ALARM:+0.01' RM DP ALARM:+0.01" 2-05 MAXIMUM TUBE LENGTHS,ETC.). <br /> RM#2114 TA 100 CFM KPFF Consulting Engineers <br /> CLEAN WORKROOM 1.4 VIABLE ENVIRONMENTAL SAMPLING AND GROWING EVALUATION Civil+SWcturel Engineering <br /> SA:575 CFM <br /> ROUTE RA To(2)Low ROUTE RA To(2)Low RA:375 CFM A. PASS LEVEL FOR KP OPERATING ROOMS IS<10 CFU#A3 1601 Fifth Avenue,Suite 1600 <br /> WALL GRILLES LOCATED WALL GRILLES LOCATED EA fi CFM B. TEST LOCATIONS:2 LOCATIONS AT THE TABLE 4 LOCATION AROUND THE ROOM <br /> IN OPPOSITE CORNERS IN OPPOSITE CORNERS TA+200 CFM Seattle,WA 98101 <br /> C. TESTING VIA AIR SAMPLING AND GROWTH MEDIA PLATES. <br /> D. SAMPLING SHOULD OCCUR IN THE"AT REST'CONDITION:HVAC SYSTEMS Mazzetti <br /> SHOULD BE RUNNING AT SPECIFIED OPERATING CONDITIONS.THERE SHOULD MEP+FP Engineering <br /> RM#2125 BE NO CONTAMINANT LOAD IN THE SPACE. 2013 4th Avenue,Suite 200 <br /> SUB-STERILE ] E. APPLICABLE STANDARDS PROTOCOLS:CETA CAG-009 Seattle,WA 98121 <br /> VAV TA 100 CFM VAV SA:11]0 CFM TA 100 CFM VAV <br /> 2-03 RA:15]o CFM 204 1.5 RECOVERY TIME TESTING <br /> 2-01 FA:O CFM A. RECOVERY TIME TESTING IS REQUIRED FOR TWO PURPOSES: <br /> TA:-0W CFM 1. TO DEMONSTRATE THAT AIR CLEANLINESS IS RECOVERED WHEN SYSTEMS Key Plan <br /> VAV ARE SET BACK AND THEN RE-ENGAGED <br /> 2-15 2. TO DOCUMENT AND RECORD THE TIME TAKEN TO RECOVER CLEANLINESS <br /> VAV AFTER A SETBACK EVENT. <br /> TA 100 CFM VAV3 2-0B TA 100 CFM VAV 1 MINIMUM PROCESS: <br /> . SET AIR SYSTEMS TO MINIMUM AIR-FLOW,REPRESENTING UNOCCUPIED <br /> 2-07 -2-08 NIGHTSET BACK <br /> 61 '? 4 [ 2. RECORD PARTICLE COUNTS FOR TESTING LOCATIONS(PER'PARTICLE <br /> TESTING SECTION.) <br /> 3. SET SYSTEMS TO SPECIFIED OPERATING CONDITIONS. <br /> FUTURE CATH LAB 4. RECORD TIME TAKEN TO ACHIEVE COMPLIANT PARTICLE COUNTS(PER <br /> ROOM PRESBURE ROUTE RA TO(2)LOW ROUTE RA TO(2)LOW 'PARTICLE TESTING'SECTION). <br /> SENSOR(TYP) WALL GRILLES LOCATED WALL GRILLES LOCATED <br /> IN OPPOSITE CORNERS IN OPPOSITE CORNERS VAV 5, IF ROOMS ARE VERY CLEAN AND CANNOT FIND DIFFERENCES IN PARTICLE <br /> 210 COUNT BETWEEN THE TWO MODES,TRY TO INTRODUCE MORE PARTICULATES <br /> BV OPENING DOORS OR MOVING PARTS IN ROOM AS MUCH AS YOU CAN FOR <br /> RM#2123 RM#2124 SOME TIME AND REPEAT TESTS AND RECORD TIME TAKEN TO ACHIEVE <br /> COMPLIANCE. <br /> ORTHO OPERATING ROOM ORTHO OPERATING ROOM <br /> TOTAL AIR CHANGES:23.6 TOTAL AIR CHANGES:23.6 <br /> SA:1920 CFM SA:1920 CFM 1S FILTER LEAK TESTING <br /> RA:1670 CFM RA 1670 CFM A. IEST-RP-CC-034 DEFINES THE FILTER SCAN LEAK TEST,FACTORY TEST Professional Seals <br /> EA:0 CFM EA:0 CFM CRITERIA AND INSTALLED TEST CRITERIA.PLENUM FILTERS SHALL BE TESTED IN <br /> TA:+250 CFM TA:+250 CFM TA 100 CFM RM#2111 ACCORDANCE TO IEST-RP-CC-034 FOR TYPE CIJ FILTERS(TABLE 2).FIELD �t <br /> RM DP RELATIVE TO RM DP RELATIVE TO CLEAN WORKROOM TESTING SHALL UTILIZE A LASKIN NOZZEL GENERATOR WHEN INJECTING PAO <br /> ADJACENT SPACES:+0.02" ADJACENT SPACES:+0.02' SA 595 CFM AEROSOL INTO THE AIR HANDLING SYSTEM.A PHOTOMETER SHALL BE USED TO Q4'QF wAs <br /> RM DP ALARM:-0 Or RM DP ALARM:+0.01" RA:395 CFM MEASURE THE MAXIMUM ALLOWABLE PENETRATION ON THE DOWNSTREAM SIDE t�4' <br /> RM#2106 EA 0 CFM OF THE FILTER IN ACCORDANCE TO THIS STANDARD. F o <br /> TA:+200 CFM T <br /> CLEAN WORKROOM <br /> B. APPLICABLE STANDARDS IPROTOCOLS:IEST-RP6C-034 <br /> (4)ILING SA CONNECT IONSDSH INTEGRATED FILTCEILING (CEILIN 4SA CONNECTIONS TOINTEGRATED CEILING SA:85 CFM <br /> (CEILING BY OTHER.).INCLUDE.PROVIDE(1)DON (CEILING BVOTHERSDFFUSE S.PROVIDE(1)DONAND UM NAIR RAOCFM 24672 <br /> SENSOR ACROSS <br /> FLOW SSFILT FILTER <br /> PROVIDE(1)DP SENSOR INARACROSS <br /> FLOW SSFILT FILTER ASSEMBLY <br /> PROVIDE(1)DP EA:O CFM A. Q <br /> SENSOR ACROSS FILTER ASSEMBLY SENSOR ACROSS FILTERASSEMBLV TA:+85 CFM STAIR <br /> VAV TONAL ' <br /> 2-15 <br /> No. Description Data <br /> SCHEMATIC DESIGN 2020/01/24 <br /> TA 150 CFM TA 150 CFM TA 85 CFM TA 100 CFM DESIGN DEVELOPMENT 2 02 010 511 5 <br /> All, RM#2700 DESIGN DEVELOPMENT ADDENDUM 2020/06/08 <br /> PATIENT CORRIDOR 50%CONTRACT DOCUMENTS 2020/07/31 <br /> VAV 75%CONTRACT DOCUMENTS 2020/09/25VAV VAV VAV TA 100 CFM <br /> 3-2418 RA:17]5 CFM PERMIT SET 2020/11/13 <br /> 3-2-07 -2-08 3-2-10 EA:O CFM ISSUED FOR CONSTRUCTION 2021/03/19 <br /> TA:-585 CFM CLEAN WORKROOM <br /> DIAGRAMS - OPERATING ROOM AIRFLOW <br /> M514 NONE <br /> KIP <br /> Project No: CAP020407 <br /> HOK Project No: 19.05002.03 <br /> Sheet Title: <br /> AIRFLOW DIAGRAM <br /> a <br /> Original is 30 x 42.Do not scale contents I Ihis-inn <br /> Sheet Number <br /> M514 <br />
The URL can be used to link to this page
Your browser does not support the video tag.