My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST 2025-03-27
>
Address Records
>
MAPLE ST
>
2930
>
2930 MAPLE ST 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 2:59:34 PM
Creation date
2/6/2025 11:28:38 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> KAER <br /> PER ANENTE <br /> Project <br /> HWS HWS HWS Kaiser Permanente Everett <br /> HWR HWR HW I I Medical Clinic Expansion <br /> 2929 PINE STREET <br /> EVERETT,WA 98201 <br /> 3 <br /> Prepared for <br /> RTU-7 RTUd RTU-, = RTU-2 RTU-5 RTu-a Rrus KAISER FOUNDATION <br /> ROOF HEALTH PLAN, INC. <br /> 2"TO HEATING COILS <br /> LEVEL4 kil <br /> 2"TO HEATING COILS Hellmuth,Obata&Kassabaum,Inc. <br /> 1218 Third Avenue,Suite 1315 <br /> Seattle,WA 98101 USA <br /> t+1 206 493 1771 f+1 206 493 1778 <br /> 3 <br /> All reproduction&intellectual property rights reserved <br /> 2019 <br /> In Association with <br /> Mortensen <br /> General Contractor <br /> LEVEL 3 10230 NE Points Drive,Suite 300 <br /> Kirkland,WA 98033 <br /> HWS COnxtech,Inc <br /> TO HEATING COILS <br /> HWR <br /> tructure Fabricator <br /> 6701 Koll Center Parkway,Suite 150 <br /> Pleasanton,CA 94566 <br /> KPFF Consulting Engineers <br /> Civil+Structural Engineering <br /> 1601 Fifth Avenue,Suite 1600 <br /> Seattle,WA 98101 <br /> MaZZettl <br /> MEP+FP Engineering <br /> 2013 4th Avenue,Suite 200 <br /> LEVEL 2 Seattle,WA 98121 <br /> Key Plan <br /> —/ <br /> 2-12"TO HEATING COILS <br /> LEVEL 1 <br /> 6" <br /> Professional Seals <br /> 4Y w Sp <br /> Q DF as <br /> HWR ,�4+ <br /> Fc O <br /> q Y <br /> 2467z 9 <br /> BOILER MIN FLOW BYPASS AUTOMATIC HWR CIS L G <br /> (40 GPM THRU BOILER) AIR FLOW METER <br /> R V lONAL <br /> FM <br /> No. Description Dale <br /> HWS SCHEMATIC DESIGN 2020/01/24 <br /> HWS HWP-1(PONY) DESIGN DEVELOPMENT 2 02 010 511 5 <br /> 90 GPM DESIGN DEVELOPMENT ADDENDUM 2020/06/08 <br /> 50%CONTRACT DOCUMENTS 2020/07/31 <br /> VFD AIR SEPARATOR 75%CONTRACT DOCUMENTS 2020/09/25 <br /> PERMIT SET 2020/11/13 <br /> ISSUED FOR CONSTRUCTION 2021/03/19 <br /> HWP-2 <br /> 200 GPM <br /> VFD <br /> BLR-1 BLR-2 <br /> HWP-3 PRV RPBP 1,440 1,440 <br /> 200 GPM MBH MBH <br /> VFD 60 MIN 60 MIN <br /> ® 2 SEE DOMESTIC MBH MBH <br /> WATER DIAGRAM <br /> BASEMENT <br /> CHEMICAL HEATING EXPANSION GLYCOL AUTO GAS FIRED HEATING WATER BOILERS <br /> FEEDER WATER PUMPS TANK FILL UNIT 2,500 MBH BUILDING PEAK DEMAND <br /> 3 DEG F AT MIN FIRE AT MIN FLOW <br /> DIAGRAMS - HEATING WATER <br /> M521 NONE <br /> KIP Project No: CAP020407 <br /> HOK Project No: 19.05002.03 <br /> Sheet Title: <br /> HEATING WATER <br /> DIAGRAM <br /> a <br /> original is 30 x 42.Do not scaly contents or Nis drawing. <br /> Sheet Number <br /> M 521 <br />
The URL can be used to link to this page
Your browser does not support the video tag.