Laserfiche WebLink
• <br /> KAER <br /> PER ANENTE <br /> Project <br /> Kaiser Permanente Everett <br /> Medical Clinic Expansion <br /> 2929 PINE STREET <br /> EVERETT,WA 98201 <br /> Prepared for <br /> KAISER FOUNDATION <br /> HEALTH PLAN, INC. <br /> HRR HRR <br /> HRS HRS NP SUPPLY ki <br /> RPBP <br /> Hellnnuth,Obata&Kassabaum,Inc. <br /> 1218 Third Avenue,Suite 1315 <br /> Seattle,WA 98101 USA <br /> t+1 206 493 1771 f+1 206 493 1778 <br /> AUTOMATIC VESTIBULE EHR-1 <br /> AIR VENT All reprod--&mtelleotoel property rights reeen ed <br /> tote <br /> AIR LIn Association with <br /> SEPARATOR HRS o <br /> 0 0 <br /> Mortensen <br /> 0 <br /> General Contractor <br /> RTU-2 o RTU-1 0 -HRR ¢ 10230 NE Points Drive,Suite 300 <br /> 0 o Kirkland,WA 98033 <br /> HRP-1 <br /> ConXtech,Inc <br /> Structural Fabricator <br /> ROOF 6701 <br /> Koll Center <br /> SUPPLYAIRUNIT SUPPLY AIR UNIT CHEMICAL HEAT EXPANSION EXHAUST HEAT RECOVERY UNIT Pleasanton,CA 94566 ay,Suite 150 <br /> FEEDER RECOVERY TANK <br /> PUMP <br /> KPFF Consulting Engineers <br /> Civil t Structural Engineering <br /> SEQUENCE OF OPERATION-HEAT RECOVERY SYSTEM 1601 Fifth Avenue,Suite 1600 <br /> CONTROL INPUT/OUTPUT POINT SUMMARY Seattle,WA 98101 <br /> A. SYSTEM WITH HEAT RECOVERY PUMP,HRP-1,SHALL OPERATE ON A 2417 SCHEDULE. <br /> B. SEQUENCE TO BE COORDINATED WITH OPERATION OF RTU-1,RTU-2,AND EHR-1. POINT NAME AI DI AO DO area <br /> C. ENABLE AND DISABLE. Mazzettl <br /> 1. WHEN ANY RTU UNIT IS ENABLED AND EHR-1 IS ENABLED: me.rarex MEP+FP Engineering <br /> i. CONTROL VALVE AT EHR-1 HEAT RECOVERY COIL SHALL BE FULLY OPEN. ' 20134[h Avenue,Suite 200 <br /> ii. PUMP WILL TURN ON. Seattle,WA 98121 <br /> iii CONTROL VALVE AT RTU HEAT RECOVERY COIL SHALL BE OPEN AND SHALL MODULATE TO MAINTAIN THE SUPPLY AIR TEMPERATURE. <br /> 2. WHEN EHR-1 UNIT IS DISABLED: <br /> i. CONTROL VALVE AT HEAT RECOVERY COIL SHALL CLOSE. Key Plan <br /> ii. CONTROL VALVES AT EACH RTU SHALL BE CLOSED. <br /> III. PUMP SHALL TURN OFF. <br /> D. BAS CONTROLLER SHALL MEASURE THE HEAT RECOVERY COIL ENTERING AND LEAVING AIR TEMPERATURE AND MODULATE <br /> CONTROL VALVE AT AT EACH RTU HEAT RECOVERY COIL. <br /> E. HEAT RECOVERY SYSTEM SHALL BE DISABLED WHEN OSA TEMPERATURE IS ABOVE 65 DEG.F(ADJ.) <br /> DIAGRAMS - HEAT RECOVERY <br /> M522 NONE <br /> Professional Seals <br /> 4Y w Sp <br /> �Q, DF As <br /> �w <br /> Fe o <br /> � z <br /> 24672 <br /> TONAL <br /> No. Description Data <br /> SCHEMATIC DESIGN 2020/01/24 <br /> DESIGN DEVELOPMENT 2 02 010 511 5 <br /> DESIGN DEVELOPMENT ADDENDUM 2020/06/08 <br /> 50%CONTRACT DOCUMENTS 2020/07/31 <br /> 75%CONTRACT DOCUMENTS 2020/09/25 <br /> PERMIT SET 2020/11/13 <br /> ISSUED FOR CONSTRUCTION 2021/03/19 <br /> KIP Project No: CAP020407 <br /> HOK Project No: 19.05002.03 <br /> Sheet Title: <br /> HEAT RECOVERY <br /> DIAGRAM <br /> a <br /> 0riginel is 30 x 42.Do not scale contents or Nis drawing. <br /> Sheet Number <br /> M M522 <br />