Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2110-096 Description: New Service and wiring for bagging plant-PACIFIC <br /> TOPSOILS <br /> Applied: 10/13/2021 Approved: 10/14/2021 Site Address: 2725 32ND AVE NE <br /> Issued: 10/15/2021 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status: EXPIRATION NOTICE SENT Applicant:ALPHA AND OMEGA ELECTRIC LLC <br /> Parent Permit: Owner: M A P#2 LLC <br /> Parent Project: Contractor:ALPHA AND OMEGA ELECTRIC LLC <br /> Details: <br /> New Service and wiring for bagging plant-PACIFIC TOPSOILS <br /> "ADDED SCOPE--We need to add two more circuits to this permit.Can you add (1)20A circuit for a fan and(1)50A circuit for a heater <br /> to permit#E2110-096 <br /> it <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/13/2021 12/13/2021 ELEC 02-GROUND TODD JOHNS APPROVAL eTRAKiT Inspection Request <br /> WORK <br /> Notes: <br /> 12/10/2021 1:05 PM ALPHA AND OMEGA ELECTRIC LLC <br /> Electrical cover inspection requested for Monday 12/13,please call site contact Thomas#425-870-1606 <br /> Contact Name:ALPHA AND OMEGA ELECTRIC LLC <br /> Site Address:2725 32ND AVE NE <br /> Phone:4253373006 <br /> e-Mail:admin@aoecustom.com <br /> (12/13/2021 2:43 PM T110) <br /> tjjo changed Inspection Type from ELEC 06-ROUGH IN to ELEC 02-GROUND WORK <br /> (12/13/2021 2:45 PM TJJO) <br /> Approved ditch from transformer vault to meter <br /> 2/24/2022 2/24/2022 ELEC 05-SERVICE TODD JOHNS PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 2/22/2022 12:07 PM ALPHA AND OMEGA ELECTRIC LLC <br /> Requesting Service inspection for 2/24 Thursday PM/Afternoon(work is being done in AM).Please call Matthew w/ETA#206-755-0933.Note:PLID is <br /> coming out on 2/28 <br /> Contact Name:ALPHA AND OMEGA ELECTRIC LLC <br /> Site Address:2725 32ND AVE NE <br /> Phone:4253373006 <br /> e-Mail:admin@aoecustom.com <br /> (2/24/2022 3:04 PM TJJO) <br /> Label with AIC <br /> Main service only remainder after pud hooks up and switchover is made,building needs inspection still as well <br /> I <br /> Printed: Friday,07 February,2025 1 of 2 rk <br /> SUPERION <br />