My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2025-03-24
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 9:03:36 AM
Creation date
2/7/2025 9:03:36 AM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 6/28/2022 6/28/2022 ELEC 10-FINAL MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 6/24/2022 10:23 AM ALPHA AND OMEGA ELECTRIC LLC <br /> Final inspection for Tuesday 5/28.Please call site contact Thomas#425-870-1606 w/ETA <br /> Contact Name:ALPHA AND OMEGA ELECTRIC LLC <br /> Site Address:2725 32ND AVE NE <br /> Phone:4253373006 <br /> e-Mail:admin@aoecustom.com <br /> (6/28/2022 12:57 PM MHW) <br /> Grounding electrode conductor must ground the grounded conductor at the service panel or in the the step down transformer <br /> Allfield assembled equipment needs to be field evaluated.See L and I dot.wa.gov backslash electrical and then search field evaluation to see the list of <br /> approved evaluators.See chapter work to 96?46BS999 for further information <br /> PERMIT EXTENSION <br /> EXTENSION <br /> 3/16/2023 3/16/2023 (REASON CINDY BERGSMA <br /> APPROVED <br /> REQUIRED) <br /> Notes: <br /> Hi Cindy, <br /> It just came to our attention today that the work on this permit#E2110-096 went longer than we had our permit open and didn't get it followed up on <br /> to keep open for us to then take care of the final inspection.Would you be able to make it active for a couple of weeks and then I can request final <br /> inspection for as soon as possible? <br /> Thanks, <br /> Julie Allison(she/her/hers) <br /> Office Manager w/Alpha and Omega Electric <br /> 4/24/2023 4/24/2023 ELEC 10-FINAL MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WICKLANDER APPROVAL <br /> Notes: <br /> 4/19/2023 4:17 PM ALPHA AND OMEGA ELECTRIC LLC <br /> Final inspection requested for Friday 4/24.Site contact is Thomas#425-870-1606.Please call him w/ETA so he can notify staff to meet you onsite for <br /> access. <br /> Contact Name:ALPHA AND OMEGA ELECTRIC LLC <br /> Site Address:2725 32ND AVE NE <br /> Phone:4253373006 <br /> e-Mail:admin@aoecustom.com <br /> Approve bonding of electrode conductor at transformer to XO approve partial final on that portion.Once I get once I receive the field verification <br /> report,I will close out this permit. <br /> Approve bonding of electrode conductor at transformer to XO approve partial final on that portion.Once I get once I receive the field verification <br /> report,I will close out this permit. <br /> I <br /> Printed: Friday,07 February,2025 2 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.