Laserfiche WebLink
drains do not display ongoing or recurring visible sheen and do not contain greater than <br /> a significant amount of oil and grease. <br /> • The fuel from the delivery tank trucks is transferred to the fuel storage tank in <br /> impervious contained areas and appropriate overflow protection is used during the <br /> filling process. <br /> 3.10 Treatment BMPs <br /> Condition S3 of the Industrial Storm water General Permit requires Treatment BMPs listed <br /> as"applicable"in Ecology's SWMMs, or other guidance documents as mandatory. <br /> Treatment BMPs for Storage of Liquids in Above-ground Tanks and Tanker Trucks: <br /> • The tank containment area is covered and the aboveground tanks are capped and not <br /> in use. <br /> • Stormwater from the operational areas at the site is treated using a system of three oil <br /> water separators prior to manual discharge to the sanitary sewer. <br /> • The storm water system is equipped with a closed oil stop valve which directs water <br /> to a 4,500-gallon secondary containment vault. <br /> 3.11 Stormwater Peak Runoff and Volume Control BMPs <br /> No new development or redevelopment activities are being conducted at this site, and <br /> Storm Water Peak Runoff and Volume Controls BMPs are not required for this facility. <br /> 3.12 Erosion and Sediment Control BMPs <br /> Mandatory Erosion and Sediment Control BMPs required by Condition S3 of the Industrial <br /> Storm water General Permit. The Nelson Petroleum property is paved. No future <br /> development is planned for the facility. However, sediment and filtration controls may be <br /> evaluated if turbidity levels exceed regulatory standards at the site. If needed the filtration <br /> BMPs may be employed to remove solids from catch basins, sumps or other storm water <br /> collection and conveyance system components using filter socks, modular canisters, sand <br /> filtration,centrifugal separators, etc. <br /> i <br />