My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9826 7TH AVE SE 2025-03-25
>
Address Records
>
7TH AVE SE
>
9826
>
9826 7TH AVE SE 2025-03-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:37:01 PM
Creation date
2/7/2025 9:08:38 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9826
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6 <br /> Sampling Frequency(Reporting Dates and DMR Due Dates) <br /> Reporting Period Months DMR Due Date <br /> 1st January-March Ma 15 <br /> Annual Report Prior Year May 15 <br /> 2nd Aril-June August 14 <br /> 3�a July-Sept F November 14 <br /> 4th October-December February 14 <br /> The DMR forms are submitted to Ecology within 45 days following each quarterly <br /> monitoring period. All monitoring information including inspection reports and other <br /> storm water sampling documentation records are maintained by the facility for a period of <br /> five years. <br /> Department of Ecology <br /> Water Quality Program — Industrial Stormwater <br /> PO Box 47696 <br /> Olympia, Washington 98504-7696 <br /> Recording of Results <br /> For cacti measurement or sample collected the following information is recorded: <br /> 1. Date, exact place,method, and time of sampling or measurement; <br /> 2. Individual who performed the sampling or measurement; <br /> 3. Dates the analyses were performed; <br /> 4. Laboratory that performed the analyses; <br /> 5. Analytical techniques or methods used; and <br /> 6. Results of all analyses <br /> The record of the sampling results is included in the SWPPP record notebook, and <br /> maintained at Nelson's Main Facility. <br /> Noncompliance Notification <br /> If the facility is unable to meet the requirements of the SWPPP,the facility shall; <br /> i <br /> i 1. Immediately take action to minimize the potential impact to the environment or <br /> otherwise eliminate the noncompliance and correct the problem; <br /> 2. Immediately notify the appropriate Ecology regional office of the failure to comply, <br /> and <br /> 3. Submit a detailed written report to Ecology within thirty days. The report shall <br /> contain a description of the noncompliance, the times and dates, and if the situation <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.