Laserfiche WebLink
Appendix E <br /> SWPPP Certification Form <br /> The Permittee shall use this form to sign and certify that the Stormwater Pollution Prevention Plan(SWPPP) <br /> is complete, accurate and in compliance with Conditions S3 and S8 of the Industrial Stormwater General <br /> Permit. <br /> • A SWPPP certification form needs to be completed and attached to all SWPPPs. <br /> • Each time a Level 1,2,or 3 Corrective Action is required,this form needs to be re-signed and re- <br /> certified by the Permittee,and attached to the SWPPP. <br /> Is this SWPPP certification in response to a Level 1,2 or 3 Corrective Action? ❑Yes ❑No <br /> If Yes: <br /> • Type of Corrective Action?:❑Level 1 ❑Level 2 ❑Level 3 <br /> • Date SWPPP update/revision completed: <br /> "I certify under penalty of law that this SWPPP and all attachments were prepared under my direction or <br /> supervision in accordance with a system designed to assure that qualified personnel properly gather and <br /> evaluate information to determine compliance with the Industrial Stormwater General Permit.Based on my <br /> inquiry of the person or persons who are responsible for stormwater management at my facility,this SWPPP <br /> is,to the best of my knowledge and belief,true,accurate,and complete,and in full compliance with Permit <br /> Conditions S3 and S8, including the correct Best Management Practices from the applicable Stormwater <br /> Management Manual. I am aware that there are significant penalties for submitting false information, <br /> including the possibility of fine and imprisonment for knowing violations." <br /> Operator's Printed Name* Title <br /> Operator's Signature* Date <br /> *Federal regulations require this document to be signed as follows: <br /> For a corporation,by a principal executive officer of at least the level of vice president; <br /> For a partnership or sole proprietorship,by a general partner or the proprietor,respectively;or <br /> For a municipality,state,federal,or other public facility,by either a principal executive officer or ranking <br /> elected official. <br /> This document shall be signed by a person described above or by a duly authorized representative of that <br /> person. A person is a duly authorized representative only if: <br /> 1. The authorization is made in writing by a person described above and submitted to the Ecology. <br /> 2. The authorization specifies either an individual or a position having responsibility for the overall <br /> operation of the regulated facility,such as the position of plant manager,superintendent,position <br />{ of equivalent responsibility,or an individual or position having overall responsibility for <br /> environmental matters. <br /> Changes to authorization. If an authorization under number 2 above is no longer accurate because a different <br /> individual or position has responsibility for the overall operation of the facility,a new authorization satisfying <br /> the requirements of number 2 above shall be submitted to Ecology prior to, or together with, any reports, <br /> jinformation,or applications to be signed by an authorized representative. <br />