My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3224 RUCKER AVE 2025-03-25
>
Address Records
>
RUCKER AVE
>
3224
>
3224 RUCKER AVE 2025-03-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 8:06:42 AM
Creation date
2/7/2025 10:36:53 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3224
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> 1SOLAR BONDING CONNECTION GROUND PATHS 1 BLUE RAVED <br /> 1 1 <br /> � 1 1 <br /> NSTALLATION GUIDE ; PAGE 1403 N.Research Way <br /> Orem,UT 84097 <br /> SM MOUNT I800.377.4480 <br /> --------------------------------------------------------------------------------------------------------------------------------------------- <br /> WWW BLUERAVENS LAR COM <br /> \ AI /. CONFIDENTIAL-THE INFORMATION <br /> C✓ � � � ' � ` G ,`'� � HEREIN CONTAINED SHALL NOT BE <br /> USED FOR THE BENEFIT OF EXCEPT BLUE RAVEN SOLAR NOR <br /> E <br /> Nb SHALL <br /> N PART TO OTOHERS SED(OUTS DE N WHOLE OR <br /> U��`F� RECIPIENTS ORGANIZATION,EXCEPT <br /> IN CONNECTION WITH THE SALE AND <br /> MtC 0 \ \ O S USE OF THE RESPECTIVE EQUIPMENT, <br /> WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC.G <br /> HOB C'�`� - .r1P V / �� NABCEP <br /> CERTIFIED <br /> PV INSTALLATION <br /> N 1 N 1 �� 1 PROFESSIONAL <br /> Scott Gurney <br /> BONDING MIDCLAMP ASSEMBLY ENDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAIL TO L-FOOT w/BONDING T BOLT #PV-011719-015866 <br /> © Stainless steel Midclamp points, 2 per module, 0 Serrated flange nut bonds aluminum Endclamp 0 Bonding Hardware creates bond between splice 0 Serrated flange nut removes L-foot anodization CONTRACTOR: <br /> pierce module frame anodization to bond to stainless steel T-bolt bar and each rail section to bond L-Foot to stainless steel T-bolt BRS FIELD OPS <br /> module to module through clamp. Aluminum splice bars spans across rail a to 385-498-6700 <br /> Serrated T-bolt head penetrates rail anodization P P gap Serrated T-bolt head penetrates rail anodization <br /> 0 Serrated flange nut bonds stainless steel clamp 0 to bond T-bolt, nut, and Endclamp to grounded 0 create rail to rail bond.Rail on at least one side 0 to bond T-bolt,nut,and L-foot to grounded <br /> to stainless steel T-bolt SM rail of splice will be grounded. SM rail <br /> 0 Serrated T-bolt head penetrates rail anodization Note: Splice bar and bolted connection are <br /> to bond T-bolt, nut, clamp, and modules to Note:End clamp does not bond to module frame. non-structural. The splice bar function is rail <br /> grounded SM rail. alignment and bonding. <br /> H, s. <br /> Notnly one lug per module row BONDING MICROINVERTER _ 0 T W� <br /> uired CK W r <br /> i "SO��O <br /> ® MOUNT - 1 <br /> B . - I © OApFR �! <br /> _ TB <br /> L 0 m 0 <br /> 0 U W <br /> �. 0 0 H <br /> a <br /> J Lu Z - <br /> m g (A Z DRAWING BY: <br /> 3 � v m WEEBLUG (OR ILSCO LUG) <br /> a BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND PLOT DATE: <br /> Hex nut with captive lock washer bonds metal WEEB washer dimples pierce anodized rail to <br /> CLu Lu 0 microinverter flange to stainless steel T-bolt 0 create bond between rail and lug <br /> Cyr- 6 ,� A ,� D ,�-�%C Serrated T-bolt head penetrates rail anodization PROJECT NUMBER: <br /> 0, % Solid copper wire connected to lug is routed to <br /> to bondT-bolt,nut,and L-footto grounded SM rail <br /> , provide final system ground connection. <br /> ��- % - , ��-�,-.4— System ground including racking and modules may <br /> be achieved through the trunk cable of approved SHEET NAME: <br /> RAIL TO L-FOOT BONDING RAIL microinverter systems. See page J for details NOTE: Ilsco lug can also be used when secured to <br /> w/BONDING T-BOLT SPLICE BAR the side of the rail See page K for details SPEC SHEET <br /> REVISION: PAGE NUMBER: <br /> ---- SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.