My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3224 RUCKER AVE 2025-03-25
>
Address Records
>
RUCKER AVE
>
3224
>
3224 RUCKER AVE 2025-03-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 8:06:42 AM
Creation date
2/7/2025 10:36:53 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3224
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> ' SOLARBOND NG CONNECTION GROUND PATHS ' Z BLUE RAVED <br /> ' INSTALLATION GUIDE ; PAGE 1403 N.Research Way <br /> ■ . ' Orem,UT 84097 <br /> SM MOUNT800.377.4480 <br /> --———————————————————————————————————————————————————————— ——————————————————————————————————————————————————————————————————————————————— <br /> CONFIDENTIAL-THE INFORMATION <br /> ELECTRICAL CONSIDERATIONS <br /> REQUIRED ONLY FOR TEM HEREIN CONTAINED SHALL NOT BE <br /> NE <br /> TEMPO SOLARMOUNT is intended to be used with PV USED FOR <br /> LUERA EN OLA NOR <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> B BONDING DURING ARRAY M TE NCE modules that have a system voltage less than or SHAN PART TTO OTHERS IOUTSDE OR <br /> 11 RECIPIENTS ORGANIZATION,EXCEPT <br /> C '- CTION � — equal to that allowable by the NEC. For standard N CONNECTION WITH THE SALE AND <br /> USE OF THE RESPECTIVE EQUIPMENT, <br /> system grounding a minimum 10AWG, 105°C copper WITHOUT THE WRITTEN PERMISSION <br /> grounding conductor should be used to ground a OF BLUE RAVEN SOLAR LLC. <br /> 1000 VDC system, according to the National Electric NABCEP <br /> _ Code (NEC). It is the installer's responsibility to <br /> check local codes, which may vary. See below for CERTIFIED <br /> �> tk interconnection information. PV INSTALLATION <br /> PROFESSIONAL <br /> Scott Gurney <br /> BONDING M INTERCONNECTION INFORMATION #PV-011719-015866 <br /> � �g�e <br /> CLAMPS MAINTAIN There is no size limit on how many SOLARMOUNT CONTRACTOR: <br /> GROUND PATH & PV modules can be mechanically interconnected BRS FIELD OPS <br /> � for any given configuration, provided that the 385-498-6700 <br /> Q <br /> �o Installation meets the requirements of applicable <br /> building and fire codes. <br /> GROUNDING NOTES <br /> The installation must be conducted in accordance <br /> TEMPORARY BONDING CONNECTION DURING ARRAY MAINTENANCE with the National Electric Code (NEC) and the <br /> When removing modules for replacement or system maintenance, any module left in place that is secured authority having jurisdiction. Please refer to these <br /> with a bonding Midclamp will be properly grounded. If a module adjacent to the end module of a row is resources in your location for required grounding lug <br /> removed or if any other maintenance condition leaves a module without a bonding mid clamp, a temporary quantities specific to your project. <br /> bonding connection must be installed as shown <br /> • Attach Ilsco SGB4 to wall of rail The grounding / bonding components may overhang <br /> • Attach Ilsco SG134 to module frame parts of the array so care must be made when <br /> • Install solid copper wire jumper to Ilsco lugs walking around the array to avoid damage. <br /> Conductor fastener torque values depend on DRAWING BY: <br /> conductor size. See product data sheets for correct <br /> torque values. <br /> PLOT DATE: <br /> PROJECT NUMBER: <br /> SHEET NAME: <br /> SPEC SHEET <br /> REVISION: PAGE NUMBER: <br /> SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.