Laserfiche WebLink
Page16 <br /> conducted in 2024,timing to be determined (Task 313). EES will plan to submit an RI status update report <br /> approximately 60-90 days after receipt of analytical data from these activities. <br /> SVE monthly O&M and discharge monitoring activities will continue on a limited basis as described <br /> above, with the goal of focusing extraction on SVE wells nearest to the Property building (Task 4), <br /> primarily during execution of Task 1. SVE operations will be re-evaluated subject to these supplemental <br /> RI findings. <br /> ATTACHMENTS <br /> Figure 1: Site Plan <br /> Figure 2: Proposed Vapor Sampling Locations <br /> Figure 3: Proposed HRSC, Soil, and Groundwater Monitoring Locations <br /> EES ENVIRONMENTAL CONSULTING,INC. 2120-02 2024 SOW 20240408f <br />