My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4504 BROADWAY 2025-03-24
>
Address Records
>
BROADWAY
>
4504
>
4504 BROADWAY 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:48:15 PM
Creation date
2/10/2025 9:18:56 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
4504
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 1/12/2024 <br /> City of Everett Permit Services Public Works Permit#: PW2401-008 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EVERETTEverett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $85.00 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERGREEN CEMETERY REEVE GARY <br /> %MALAR ENTERPRISES INC <br /> EVERETT,WA 98203 <br /> PHONE: PHONE: 2067179175 <br /> SITE ADDRESS:4504 BROADWAY TAX PARCEL ID#:00620400000000 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION: PW FOR GEOTECH BORINGS FOR ST'S EVERETT LINK PROJECT <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 5. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 6. Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614,or as directed by the City PW Inspector. <br /> Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 7. Full lane width grind and overlay is required for trenches greater than 100'in length,multiple cuts within a 100' length section,and/or as <br /> directed by the City PW Inspector. <br /> 8. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 9. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. Inspections are required for job start notification, potholing all City utilities,evaluation of traffic control set- <br /> up,to view the work prior to backfill,and after final restoration to final the permit. Request a final inspection online by selecting PW 25-Site <br /> Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 10. Potholing required for all crossings over/under City of Everett water mains. <br /> 11. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 12. Contact Everett Transit at 425-257-7765 at least 48 hours prior to any disruptions in bus stop service locations. <br /> 13. Noise from temporary construction sites is not allowed 10:OOPM—7:OOAM weekdays,6:OOPM—8:OOAM weekends unless a variance has <br /> been issued.Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to <br /> commencing work. Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br /> PERMIT FEE BREAKDOWN: <br /> Paving(MIN.CHARGE)...........................................................$45.00 <br /> PW Plan Review......................................................................$20.00 <br /> PW Site Inspection.................................................................$20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br /> claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right- <br /> of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br /> This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration <br /> date 180 days to keep the permit open while work is active. <br /> Page 1 of 1 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.