Laserfiche WebLink
Element 12. Manage the Project: <br /> 0 BMP C150:Materials On Hand <br /> ❑ BMPC160:Certified Erosion and SedimentControlLead <br /> (CESCL not required on-site for sites<1acre) <br /> ❑ BM C162:ScheduIing <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 13. Protect low impact development: <br /> ❑ BMP C102: BufferZones <br /> ❑ BMP C103: High Visibility Plastic or Metal Fence <br /> ❑ BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207: Check Dams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C231: Brush Barrier <br /> ❑ BMP C233 Silt Fence <br /> ❑ BM C 234:Vegetated Strip <br /> ❑ Other Per the SWMMWW: <br /> 0 Not applicable to my proposed project <br /> Explain: No low impact development near the project sites. <br /> Task 3: Construction SWPPP drawings <br /> 0 1fl Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> Show on yourTESC Plan all BM Ps selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> 0 See City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction StormwaterPollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must be prepared byor under the direction of <br /> Washington State professional licensed engineer. <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 6 of 6 <br /> (SWPPP) Template for Small Projects <br />