Laserfiche WebLink
14. Beaked hazelnut I Corylus cornuta I Shrub 11-gallon I 6' on center I 3 I <br /> Obtain plants from a reputable local nursery. Restoration plants should be installed between the months of October <br /> and March if possible. If needed, please contact City of Everett Planner Teddi McFall to plant outside of these dates or <br /> for any plant substitutions. <br /> Wood chips or mulch should be installed around each plant, leaving a few inches of space around each stem to prevent <br /> rot. Water should be provided during the drier part of the year(May through October) for the first two years to ensure <br /> plant survival. <br /> Upon installation of the restoration plants, an inspection by Code Enforcement or Planning Staff will be made to <br /> determine compliance and abatement. <br /> Please reach out with any questions.Thank you, <br /> - Teddi McFall <br /> Associate Planner I Community, Planning& Economic Development <br /> EVERETT <br /> 425.257.7284 13200 Cedar Street 2nd FI., Everett,WA 98201 <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 3 <br />