Laserfiche WebLink
. Any quarry spalls that are loosened from the pad, which end up on the roadway <br /> shall be removed immediately. <br /> . If vehicles are entering or exiting the site at points other than the construction <br /> entrance(s), fencing (see BMP C103) shall be installed to control traffic. <br /> • Upon project completion and site stabilization, all construction accesses intended <br /> as permanent access for maintenance shall be permanently stabilized. <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume 11- Chapter 4 -Page 272 <br />