Laserfiche WebLink
Figure II-4.1.1 Stabilized Construction Entrance <br /> NOT TO SCALE <br /> 0 <br /> as <br /> 100'min. <br /> Install driveway <br /> culvert if there is a <br /> roadside ditch present 4"-8"quarry <br /> spalls <br /> Geotextile <br /> Notes: 1, <br /> 5'min. <br /> 1. Driveway shall meet <br /> the requirements of the 12"minimum thickness <br /> permitting agency. <br /> 2. It is recommended that Provide full width <br /> the entrance be of ingress/egress <br /> crowned so that runoff area <br /> drains off the pad. <br /> Figure II-4.1 .1 <br /> Stabilized Construction Entrance <br /> DEPARTMENT OF Revised June2015 <br /> ECOLOGY Please see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability,and disclaimer. <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume 11- Chapter 4 -Page 273 <br />