Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> MEMORANDUM <br /> TO: Everett Public Works Permitting <br /> FROM: Grant Moen PE, Everett Public Works Maintenance Superintendent <br /> DATE: 02/1/22 <br /> RE: 37t" Street Pallet Project Phase II Drainage Basins Drainage Memo <br /> This memo details the drainage impacts related to the 3711 Smith Avenue Pallet Shelter Project. This <br /> site is located within the City's Combined Sewer System basin. However a portion of the sites drainage <br /> does not enter the combined sewer system currently. Drainage from the east side of the site flows east <br /> and either infiltrates or enters a surface drainage system. Drainage from the west side of the site flows <br /> to the northwest and ultimately enters a sewer inlet and flows into the combined sewer system.The <br /> below figure shows the site, surrounding area,sewer inlet (brick colored square symbol), and basin <br /> delineation (red line). <br /> T <br /> P <br /> 3711 <br /> 37th St. Pallet Project Ph 11 Drainage Memo 2.1.2022 <br />