My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2402 37TH ST 2025-03-26
>
Address Records
>
37TH ST
>
2402
>
2402 37TH ST 2025-03-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 7:37:04 AM
Creation date
2/10/2025 3:51:23 PM
Metadata
Fields
Template:
Address Document
Street Name
37TH ST
Street Number
2402
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Benjamin Simons<benjamin@palletshelter.com> <br /> Sent: Thursday,January 13, 2022 12:21 PM <br /> To: Grant Moen; Stephen Jones <br /> Cc: Julie Willie <br /> Subject: [EXTERNAL] RE: Everett EGM Pallet Site Plan <br /> CAUTION:This email originated from outside of the organization. Do not click links or open <br /> attachments unless you recognize the sender and know the content is safe. <br /> Hi all—I think the 400sgft drawing in that folder wasn't uploaded properly, but it should be fixed now. <br /> John—I'm waiting on my engineer to provide some info on the mini split. <br /> Also, Stephen and I realized that we didn't ask about the second ADA bathroom unit that was <br /> purchased. I'm assuming the one that EGM purchased is going to the Gospel Mission, and the one <br /> purchased by Everett will go to the new site? <br /> Ben <br /> Ben Simons <br /> Pallet E:beniamin@palletshelter.com <br /> P:(425)595-4544 <br /> ©©®O <br /> From: Benjamin Simons<beniamin@palletshelter.com> <br /> Sent: Wednesday,January 12, 2022 2:56 PM <br /> To: 'Grant Moen' <G Moen @everettwa.gov>; Stephen Jones<stephen@palletshelter.com> <br /> Cc: 'Julie Willie' <JWillie@everettwa.gov> <br /> Subject: RE: Everett EGM Pallet Site Plan <br /> Hi Grant—I've put together a folder that contains the drawings, structural specs, and electrical diagrams <br /> that we discussed. You can access it here— Everett I Pallet Infrastructure. <br /> As mentioned in our call,for the 400sgft unit you could choose to upgrade to two 4,500 watt heaters <br /> instead of the 1,500 watt heaters that is standard (the 400sgft unit will come with two electrical kits). <br /> Both of those wiring diagrams are in the folder. Using those diagrams,you'll see the required amperage <br /> to power the heaters, light, and run a few small appliances, but as you'll be able to see,you could push <br /> more amperage to each one if you want to plug more items in, or you could even add an additional <br /> breaker.The other option would be that we don't provide heaters and y'all install a mini split into the <br /> unit and we add some insulation into the floor and seams. <br /> Let me know if I've missed anything here and I can do my best to help out. <br /> Ben <br />
The URL can be used to link to this page
Your browser does not support the video tag.