My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
105 FERN RD 2025-03-24
>
Address Records
>
FERN RD
>
105
>
105 FERN RD 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 2:11:50 PM
Creation date
2/13/2025 2:06:39 PM
Metadata
Fields
Template:
Address Document
Street Name
FERN RD
Street Number
105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 Optional Equipment (for qualified installers only) <br /> 8. Install the LP pilot orifice following the directions below. <br /> (a) Use a 7/16"open-end wrench to remove the pilot hood. <br /> (b) Remove and discard the Natural Gas(NG)orifice. Place the LP orifice in the pilot assembly then replace the <br /> pilot hood,tightening the pilot hood until it is snug (do not over-tighten). <br /> Natural Gas Orifice = .018N g <br /> LP (Propane) Orifce = .014LP <br /> O <br /> 7/16" Wrench <br /> 0 <br /> � �o <br /> 9. Replace the firebox components. Restore the fireplace to the correct configuration. Install the firebacks <br /> before re-installing the burner. <br /> 10. Access the stepper motor(shown below). The stepper motor(adjustable regulator)has an installation sheet <br /> included with it—make sure to follow all of the directions. Disconnect the wiring from the stepper motor. <br /> Remove the stock stepper motor and replace it with the LP version.—MAKE SURE IT IS CORRECTLY <br /> ORIENTED. Secure using the screws included with the motor—tighten to 25 Lb.-inches. Leak test this area <br /> after installation to verify proper installation. Re-attach the wiring. <br /> I \ - <br /> I V -- <br /> 11. Restore the appliance to the correct configuration. Make the gas line connection, bleed the gas line(if <br /> applicable), start the heater, and thoroughly leak-test all gas connections and the gas control valve. <br /> ©Travis Industries 4/26/2023- 1558 430 MF GSR2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.