My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 75TH ST SW CASCADE COFFEE 2025-04-23
>
Address Records
>
75TH ST SW
>
1525
>
CASCADE COFFEE
>
1525 75TH ST SW CASCADE COFFEE 2025-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 10:54:20 AM
Creation date
2/14/2025 1:35:20 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1525
Tenant Name
CASCADE COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4t • <br /> / • <br /> ECLIPSE <br /> ENGINEERING <br /> Structural Plan Review Response Letter #1 <br /> Date: March 23,2023 ECEOVED <br /> Project: Cascade Coffee Addition APR 2 �Q23 <br /> 1525 75th Street SW,Suite 100 <br /> Everett,WA 98023 CITY OF EVERETT <br /> Permit Services <br /> Project Number: 22-10-138 <br /> To: Jessee Nielsen PaMSTR <br /> Equipment Roundup&Manufacturing � rjF M y/ 02 <br /> 1109 NE 146th St P, Q y4>o <br /> . offs,'› 2 <br /> Vancouver,WA 98685 a� <br /> 13 '": Ec cc' Digitally signed by Rolf Henry <br /> From: Caleb Lund,P.E. i- • �;/W Armstrong <br /> Eclipse Engineering,PC `fir%R9L 5e��\�w DN: E=rrmstrong@eeimt.com, <br /> ���� +�C .J�? CN=Rolf Henry Armstrong, <br /> - �‘"'O(1,'A`F- 0="Eclipse Engineering,P.C.", <br /> Re: Plan Check Number: B2212-049 vir L=Bend,S=Oregon,C=US <br /> Date:2023.03.23 10:35:00-07'00' <br /> Reference signed and sealed construction documents with Revision 3 dated 03/21/23: <br /> 1) The platform has been designed for a live load of 125 psf.The platform shall support up to four <br /> hoppers which function as carts to move product. Each hopper is 4-ft by 4-ft has a gross weight of <br /> 1500 lb and when applied across its area results in a 93.75 psf live load.This live load is accounted <br /> for in the 125 psf live load design.The worst-case scenarios for the hopper point loading have also <br /> been checked. <br /> 2) Aside from the hoppers mentioned in item 1),the platform supports no other equipment.The other <br /> equipment shown on the plans is ground supported and the platform is used for accessing the top <br /> of the equipment. <br /> 3) The seismic system used from Chapter 15,table 15.4-1 is the Steel Ordinary Moment Frames with <br /> Unlimited Height. Per table 15.4-1,the structure need not be detailed per AISC 341,but must meet <br /> AISC 360.See calculation sheet 4/81. <br /> 4) The addition and original structure have been designed to function as one complete unit.The <br /> complete unit complies with the seismic system as described in item 3). <br /> 5) Each thru-bolt is only bolted through one face of the column and does not pass through both faces <br /> of the column.This way there is no conflict between bolts.A top-down view has been added to the <br /> detail to clarify this. <br /> BEND• DENVER• MISSOULA• PORTLAND•SPOKANE•WHITEFISH c eclipse-engineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.