Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 7/23/2024 7/23/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL See notes <br /> APPROVAL <br /> Notes: <br /> 7/22/2024 8:05 AM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Approve wall and ceiling framing for phase 1,which is the north end of this project.phase 2 will be the south end of the existing portion. <br /> 7/25/2024 7/25/2024 BLDG 02- Matt Schreifels PARTIAL see notes <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 7/24/2024 9:30 AM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Concrete infill at location of demolished stairs in phase 1 of entry lobby addition. <br /> 8/1/2024 8/1/2024 BLDG 12 Matt Schreifels see notes PARTIAL APPROVAL <br /> INSULATION <br /> Notes: <br /> 8/1/2024 8/1/2024 BLDG 15-OTHER Matt Schreifels PARTIAL concrete steps <br /> APPROVAL <br /> Notes: <br /> 7/31/2024 8:11 AM Cody Rust <br /> Concrete steps <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Checked rise and run and forms for concrete steps at phase 1 of new entry OK to place concrete <br /> Checked rise and run and forms for concrete steps at phase 1 of new entry OK to place concrete <br /> Checked rise and run and forms for concrete steps at phase 1 of new entry OK to place concrete <br /> 9/4/2024 9/4/2024 BLDG 12- Matt Schreifels PARTIAL exterior ridged insulation(see notes) <br /> INSULATION APPROVAL <br /> Notes: <br /> 8/28/2024 6:43 AM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> exterior ridged insulation on phase 1 of entry <br /> I <br /> Printed: Monday,06 January,2025 3 of 7 <br /> SUPERION <br />