Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/19/2024 9/19/2024 BLDG 02- Matt Schreifels PARTIAL entry phase 2 <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 9/13/2024 1:09 PM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> 9/19/2024 9/19/2024 BLDG 03- Matt Schreifels APPROVAL entry phase 2 <br /> FOUNDATION WALL <br /> Notes: <br /> 10/3/2024 10/3/2024 BLDG 08-FRAMING Matt Schreifels PARTIALAPPROVAL phase 2 Roof framing <br /> Notes: <br /> phase 2 Roof framing C channel at wall and roof rafter connections only. <br /> 10/3/2024 10/3/2024 BLDG IS-OTHER Matt Schreifels NOT REQUIRED slab pour inspection not required <br /> Notes: <br /> 9/27/2024 9:31 AM Cody Rust <br /> Interior concrete slab <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> slab pour inspection not required in this area for this project. <br /> 10/3/2024 10/3/2024 BLDG 14-ROOF Matt Schreifels PARTIAL Phase 2 of new entry <br /> NAILING APPROVAL <br /> Notes: <br /> Phase 2 of new entry roof <br /> 10/7/2024 10/7/2024 BLDG 08-FRAMING Matt Schreifels NOT READY see notes <br /> Notes: <br /> 10/4/2024 7:30 AM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Required to have Ruffin approval for phase 2 of entry prior to scheduling for framing inspection.Schedule for electrical rough in inspection and once <br /> approved reschedule for framing. <br /> I <br /> Printed: Monday,06 January,2025 4 of 7 <br /> SUPERION <br />