Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/9/2024 10/9/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL see notes <br /> NAILING APPROVAL <br /> Notes: <br /> 10/8/2024 11:39 AM Cody Rust <br /> Exterior dense glass only <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Exterior densglass on phase 2 <br /> 10/9/2024 10/9/2024 BLDG 08-FRAMING Matt Schreifels NOT READY see notes <br /> Notes: <br /> Need electrical rough in approval for phase 2 of entry.Reschedule for framing inspection once ready. <br /> 10/25/2024 10/25/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL see notes <br /> APPROVAL <br /> Notes: <br /> 10/23/2024 11:10 AM Cody Rust <br /> Electrical inspection has been completed. <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Phase 2(south)end of new entry <br /> 11/1/2024 11/1/2024 BLDG 12- Matt Schreifels PARTIAL see notes <br /> INSULATION APPROVAL <br /> Notes: <br /> 10/27/2024 2:59 PM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Exterior walls of entry in phase 1 and phase 2 insulation approved <br /> 11/6/2024 11/6/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL see notes <br /> NAILING APPROVAL <br /> Notes: <br /> 11/4/2024 9:37 AM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Drywall nailing for phase 1 and phase 2 of entry addition. <br /> I <br /> Printed: Monday,06 January,2025 5 of 7 <br /> SUPERION <br />