My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3332 COLBY AVE CALVARY BAPTIST CHURCH 2025-06-09
>
Address Records
>
COLBY AVE
>
3332
>
CALVARY BAPTIST CHURCH
>
3332 COLBY AVE CALVARY BAPTIST CHURCH 2025-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 8:24:32 AM
Creation date
2/18/2025 11:59:14 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3332
Tenant Name
CALVARY BAPTIST CHURCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/9/2024 10/9/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL see notes <br /> NAILING APPROVAL <br /> Notes: <br /> 10/8/2024 11:39 AM Cody Rust <br /> Exterior dense glass only <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Exterior densglass on phase 2 <br /> 10/9/2024 10/9/2024 BLDG 08-FRAMING Matt Schreifels NOT READY see notes <br /> Notes: <br /> Need electrical rough in approval for phase 2 of entry.Reschedule for framing inspection once ready. <br /> 10/25/2024 10/25/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL see notes <br /> APPROVAL <br /> Notes: <br /> 10/23/2024 11:10 AM Cody Rust <br /> Electrical inspection has been completed. <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Phase 2(south)end of new entry <br /> 11/1/2024 11/1/2024 BLDG 12- Matt Schreifels PARTIAL see notes <br /> INSULATION APPROVAL <br /> Notes: <br /> 10/27/2024 2:59 PM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Exterior walls of entry in phase 1 and phase 2 insulation approved <br /> 11/6/2024 11/6/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL see notes <br /> NAILING APPROVAL <br /> Notes: <br /> 11/4/2024 9:37 AM Cody Rust <br /> Contact Name:Cody Rust <br /> Site Address:3332 COLBY AVE <br /> Phone:2064231103 <br /> e-Mail:Codyr@wgng.net <br /> Drywall nailing for phase 1 and phase 2 of entry addition. <br /> I <br /> Printed: Monday,06 January,2025 5 of 7 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.