My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3332 COLBY AVE CALVARY BAPTIST CHURCH 2025-06-09
>
Address Records
>
COLBY AVE
>
3332
>
CALVARY BAPTIST CHURCH
>
3332 COLBY AVE CALVARY BAPTIST CHURCH 2025-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 8:24:32 AM
Creation date
2/18/2025 11:59:14 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3332
Tenant Name
CALVARY BAPTIST CHURCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br /> From: Drew Martin <br /> Sent: Thursday, October 27, 2022 3:02 PM <br /> To: Martin Reimers <br /> Subject: City of Everett Permit Services: 3332 Colby Avenue (B2210-002) - First Building Intake <br /> Review <br /> Hello, Martin <br /> Your application has been received and a permit set up. However, the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Revised construction-level documents should be submitted for review. Two complete sets of the revised <br /> drawings should be submitted to replace the previously submitted drawing sets. Preliminary comments are <br /> provided below to assist in revising the drawings, but these are not intended to provide a comprehensive <br /> review. The resubmittal documents should include an itemized response letter clarifying how the review <br /> comments below have been addressed. <br /> Intake Review Comments: <br /> 1. Structural drawings are required for the proposed project. The information included in the <br /> architectural drawings is not of sufficient clarity or development to allow a review of the structural <br /> systems to be reviewed. Notable issues include but are not limited to: foundations, beams, roof joists, <br /> columns, and connections between framing members. Structural material and construction notes are <br /> also required. Note that information contained in a structural calculations package does not satisfy <br /> this requirement as calculations are not issued for construction. See IBC Sections 107.2.1 and 1603.1. <br /> 2. The structural drawings are required to be sealed and signed by a professional engineer licensed in the <br /> state of Washington. See RCW Section 18.43.010, 18.43.020, and 18.43.070. <br /> 3. The "Codes" section on Sheet A0.1 states that the Construction Type is "VB". However, the "Code <br /> Analysis" section on Sheet A0.2 indicates Type "11113". Based on a review of the records on the City of <br /> Everett website, the Type should be "VA". The available records should be reviewed to determine the <br /> correct construction type. The type should be stated consistently in the construction drawings. Note <br /> that modifications to the design may be required, including but not limited to fire-rated <br /> construction. See IBC Sections 107.2.1 and 602.1. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> - Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:OOpm-3:OOpm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.