Laserfiche WebLink
Page 2 of 2 <br />:�W—I(Wan &Associates,Inc. <br />Geotechnical Engineering . Environmental Engineering <br />Construction Testing and Inspection <br />Field <br />Report NO.: 09623538DFRIO1723ECHI <br />Concrete Placement <br />-Concrete was placed today for the new crawl space footings in front and behind the residence. The concrete contractor did <br />not order enough concrete for the entire front of the house to be poured. When we asked what they planned to do with the <br />potential cold joints, they informed us that they might pour the rest of the foundation with the stem walls. Spot footing <br />locations were also not poured today. Please refer to Mr. Haris Ichwan's daily inspection report for more details. <br />Site Photos: <br />Reviewed By: I 14,.X JUkA.— I ASTM Test #: I I Asset <br />To the best of my knowledge, the above WAS performed for information purposes only. <br />Offices Serving the Western United States <br />Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 <br />The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and ICraran & Associates. This report <br />indicates our inspectors observation and testing results based on site conditions and comractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept <br />responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. Template date 10/4/2023 <br />