Laserfiche WebLink
ROOF <br /> GABLE END ROOF TRUSS AND NAILING NG PEREPLANNG m — • — • <br /> 2X4 ROOF OUTRIGGER <br /> @ 24"O.C. GABLE END ROOF TRUSS BLOCKING @ In O b2engineers.com <br /> z 'LIE ROOF TRUSS,SHEATHING <br /> EACH SUPPORT 425-318-7047(0) <br /> OOF OVERHANG <br /> @ 24 <br /> 2X4 R"O.C. AND NAILING PER PLAN 425-318-0031 (C) <br /> LTP4 CLIP @ SHEATHING LTP4 CLIP IF WALL SHEATHING H2.5 TIE TO EACH TRUSS <br /> BREAK,SEE SHEARWALL DOES NOT OVERLAP BLOCKING, <br /> SCHEDULE FOR SPACING LTP4 CLIP @ SHEATHING SEE SHEARWALL SCHEDULE @EACH END <br /> BREAK,SEE SHEARWALL <br /> FOR SPACING <br /> 2X4 TRUSS BRACES @ ROOF TRUSS,SHEATHING SCHEDULE FOR SPACING <br /> 24"O.C.(BY TRUSS AND NAILING PER PLAN <br /> TRUSS BRACES AT 24" <br /> SUPPLIER) (BY TRUSS SUPPLIER) HEADER PER SCHEDULE <br /> FIRBELOW THE PENING AND BELOWPROVI THE PENING AND <br /> BELOW THE OPENING PER HEADER PER B/S-4 BELOW THE OPENING PER <br /> DETAIL C/S-4 DETAIL C/S-4 HEADER PER SCHEDULE <br /> 15/32-OSB OR PLY <br /> WALL SHEATHING,SEE 15/32"OSB OR PLY <br /> 15/32"OSB OR PLY 2X6 STUD WALL @ 16"O.C. SCHEDULE FOR NAILING <br /> WALL SHEATHING,SEE (TYPICAL AT EXTERIOR) WALL SHEATHING,SEE <br /> SCHEDULE FOR NAILING ROOF RAFTERS,SHEATHING 2X6 STUD WALL @ 16"O.C. SCHEDULE FOR NAILING <br /> AND NAILING PER PLAN (TYPICAL AT EXTERIOR) <br /> LRUZ(OR SIMILAR) BLOCKING FLOOR JOISTS,SHEATHING <br /> HANGER TO EACH 2X8 LEDGER W/(2)4 1/2"LONG AND NAILING PER PLAN <br /> RAFTER SDS SCREWS @ EACH STUD <br /> ROOF RAFTERS,SHEATHING TENSION STRAP BLOCKING @ 24"O.C. FLOOR JOISTS,SHEATHING LVL RIM BOARD <br /> AND NAILING PER PLAN PER PLAN AND NAILING PER PLAN <br /> FLOOR JOISTS,SHEATHING LTP4 CLIP @ SHEATHING Q•y OF WASNi S <br /> AND NAILING PER PLAN BREAK,SEE SHEARWALL <br /> BLOCKING H2.5 TIE TO - -- -- _ - FBEAMS <br /> 5 TIE TO EACH SCHEDULE FOR SPACING Z <br /> EACH RAFTER H ENDS) BEAM PER PLAN TENSION STRAP <br /> ROOF BEAM 6X6 KNEE BRACE(AT <br /> PER PLAN CCQ(ECCQ AT EDGES) 45 DEGREE ANGLE) PER PLAN PROVIDE HUGO HANGERPER PLAN HEADER PER PLAN <br /> TOROOF BEAM ,p NA 4POSTCAP BLOCKING @ 24"O.C. KBS1Z KNEE BRACE ECCLLO) 2X6 STUD WALL @ 16"O.C. PURAL�LVL RIM BOARD STABILIZER(BOTH SIDES, (TYPICAL AT EXTERIOR) 15/32"OSB OR PLY '' OWAL <br /> 6X6 KNEE BRACE HEADER PER B/S-4 TOP AND BOTTOM) Sg/ pl <br /> PER PLAN LTP4 CLIP @SHEATHING <br /> BREAK,SEE SHEARWALL PROVIDE SRAP ABOVE AND BEAM STRAP WALL SHEATHING,SEE 2X6 STUD WALL @ 16"O.C. <br /> KBS1Z KNEE BRACE kPOOVIDE MSTC48B3 STRAP FOR BEAM SCHEDULE FOR NAILING (TYPICAL AT EXTERIOR) <br /> STABILIZER(BOTH SIDES, SCHEDULE FOR SPACING BELOW THE OPENING PER PER PLAN RIM ATTACHMENT @ EACH END <br /> TOP AND BOTTOM) DETAIL C/S-4 DRAINAGE AND FLOOR JOISTS,SHEATHING <br /> WATERPROOFING FLOOR JOISTS, AND NAILING PER PLAN <br /> BY OTHERS POST PER BEAM PER PLAN SHEATHING AND <br /> PLAN PROVIDE IUS HANGER NAILING PER PLAN LVL RIM BOARD <br /> PT POST PER PLAN 15/32"OSB OR PLY TO EACH JOIST <br /> WALL SHEATHING,SEE 4 1/2"LONG TIMBERLOK HOLDOWN STRAP <br /> ABU POST BASE W/5/8" SCHEDULE FOR NAILING SCREWS@8"O.C.STAGGERED PER PLAN FEDERAL AVE <br /> X 5 1/2"STRONG BOLT 2 LUS HANGER BLOCKING @ 24"O.C. <br /> HOEDOWN STRAP 2X6 PT SILL PLATE& CREATE BEAM POCKET IN PT SILL PLATE 2X6 PT SILL PLATE&5/8"X10"A.B. RESIDENCE <br /> PER PLAN FLOOR JOISTS, 5/8"X10"A.B.WITH BP CONCRETE WALL @EACH END (BEYOND) WITH BP WASHER PER <br /> PT DECK JOISTS SHEATHING AND \ WASHER @ 36"O.C. (3"MIN BEARING LENGTH) RETAINING WALL FOOTING .. SHEARWALL SCHEDULE <br /> 5/8"X5 1/2"STRONG— NAILING PER PLAN 2X6 STUD WALL @ 16"O.C. SIZE AND REINFORCEMENT EVE R ETT <br /> PER PLAN LTP4 CLIP,SEE SCHEDULE (TYPICAL AT EXTERIOR) PER SCHEDULE <br /> BOLT 2 @ 12'O.C., - FOR SPACING SLAB ON GRADE AND <br /> a - ABU POST BASE W/5/8"X 7" PREP ATIONS PER <br /> STRONG BOLT 2 TO - � �• � —_ <br /> 1 CONCRETE WALL 15/32"OSB OR PLY X6 PT SILL PLATE&5/8"X10"A.B. —III PLANAR <br /> DRAIN ROCK— - PROVIDE LVL RIM BOARD(2) WALL SHEATHING,SEE WITH BP WASHER PER SCHEDULE <br /> 2X70 PT LEDGER 6"TIMBERLOK @ 8"O.C. SCHEDULE FOR NAILING DRAIN ROCK <br /> — 2X6 PT SILL PLATE&5/'X10" STAGGERED - <br /> DRAI A.B.WITH BP WASHER R 2"CIL —i <br /> III SHEARWALL SCHEDU - <br /> 2"CLR <br /> #4HORIZO TALATI6" DR AN 3403 FEDERAL AVE, <br /> #'@'2"E.W. —2 # o EVERETT,WA 98201 <br /> RETAINING WALL <br /> ¢ 2"CLR a —III I —III—pREPARAT ONS PERDPLAfQ—III (SOIL PREPARATIONSI SOIL PREPARATIONS— I`�— <br /> FOOTING SIZE AND —III—I —III , <br /> REINFORCEMENT—III—III—III— 8 ,III ,III ,III ,III ,III ,III ,III ,III-?ER NOTES ON S-1 4 if j PER NOTES ON S-1—III—III—III— <br /> PER SCHEDU —III—III—III— � <br /> Detail 2 3 Detail 3 <br /> III—III—III—III—III—III—I ____ DRAIN R CKLAYER 3/8"=,'-0" ,/2"=,'-0" <br /> 1=III=III—III—III—III 31�4— I I—,a.6"- I FI>—III—III <br /> III—III-SOIL�P�REPARATIONS I—III—I I�—III—I <br /> —III—IPER NOTES ON 5H1—III—I I—WATER PROOFING— <br /> I—III—III— <br /> PERARCHITECTURAL—y- _ FLOOR JOISTS,SHEATHING <br /> III—III—III—III—II `I— S BON GRADE AND NAILING PER PLAN BEAMS PER PLAN <br /> I a R PLAN LRUZ(OR SIMILAR)HANGER <br /> —III—III—III—III—III—III—III—III—III—III—I 4� 2X8 LEDGER W/(2)41/2"LONG <br /> III—III—III—III—III—III—III—III—III—III—III—I�� AT,2"E W TO EACH RAFTER SDS SCREWS @ EACH STUD <br /> _ BEAM STRAP <br /> III III III III— y, - _ ROOF RAFTERS,SHEATHING PER PLAN BLOCKING @ 24"O.C. <br /> _ IMPORTANT NOTE: III—DRAIN III AND NAILING PER PLAN <br /> III—III III—III— NEW FOOTING SHALL BE—III III—LACED AT 41 DEGREE OR _ H2.5 TIE TO FLOOR JOISTS,SHEATHING <br /> D EPER PROJECTION-1 I III III 1 -� — TOOEAICH JOIST HANGER TO EACHJOIST <br /> ANGER <br /> III III III III ° z EACH RAFTER AND NAILING PER PLAN <br /> III—III—III—III—III—III—III—III—III—III—III—III —° - _ -- PROVIDE HHUS HANGER FOR <br /> III III III III III III III III III III III 1L-6..1 O9„IIII BLOCKING BE <br /> TO BEAM ATTACHMENT <br /> III—III—III—III—III—III—III—III—III—III—III—IIII I" II ROOFBEAM �De[ai155 DRAWING INFO <br /> III III III III III III III III III III III PER PLAN PROVIDE HGUS48 BEAM LVL RIM BOARD WITH �3/4"=T-0=V-0" <br /> HANGER PER PLAN HUGO HANGER <br /> LTP4 CLIP @ SHEATHING ISSUE DATE 08-24-23 <br /> Detail 1 CCO(ECCLRQ FOR 2 BEAM BREAK @ 24"O.C. HEADER PER <br /> 1/2"—1'O" CONDITION)POST CAP SCHEDULE 2X6 PT SILL PLATE& <br /> KBS1Z KNEE BRACE 6X6 KNEE BRACE 2X4 STUD WALL` _ .5/8"XB"A.B.WITH BP ISSUED FOR PERMIT <br /> STABILIZER(BOTH SIDES, PER PLAN @ 16"O. . -- <br /> TOP AND BOTTOM) C `WASHER @ 36"O.C. <br /> PROJECT N0.22082 <br /> PT POST PER PLAN <br /> SLAB ON GRADE AND <br /> ABU POST BASE W/5/8" #4 @ 16" PREPARATIONS PER PLAN <br /> X51/2"STRONG BOLT ENGINEER BB <br /> CONCRETE WALL L,WITH FOOTING REVISION SCHEDULE <br /> - <br /> 2 _ NO. DATE DESCRIPTION <br /> p #3 NOSE BAR BLOCKING @ 24"O.C. III _SOIL PREPARATIONS 1 09-16-22 PILE REVISION <br /> LVL RIM BOARD 1'-2" PER NOTES ON S-1 <br /> #3 AT 18"E.W.(MID-DEPTH) FLOOR JOISTS, <br /> 2X70 PT LEDGER W/41/2" SHEATHING AND Detail 6 <br /> I LONG TIMBERLOK SCREWS NAILING PER PLAN �3/4"=1'-0=1'-0° <br /> @ 6"O.C.STAGGERED <br /> —III IIIII °`. <br /> IIILUS HANGER PT DECK JOISTS 2X6 PT SILL PLATE& <br /> PER PLAN /8"X10"A.B.WITH BP <br /> _ 2X10 PT LEDGER W/5/8"X 5112" ASHER @ 36"O.C. <br /> IIIII STRONG BOLT 2 @ 12"O.C. <br /> DRAINAGE AND — - - '—I I— <br /> SLOPE BY OTHERS IIII—III —_RETAINING WALL _ FRAMING <br /> _ —III—I I FOOTING SIZE AND <br /> —_REINFORCEMENT <br /> — <br /> IIII—IIIIIIIII—III—PERSCHEDULE-III— <br /> III= DETAILS <br /> _ —III—III—III—III—III—III—I —_ _ _ <br /> IiIlllilililllliiillliiillliiillliiillliiillliiilll—III—III—III—III—III <br /> 4 Detail 4 - -� —� - <br /> 1/2"=V-0" S_3 <br /> 1I Copynght b2 StNctuml Engmwm 2008 <br />