Laserfiche WebLink
PLYWOOD OR OSB PANEL EDGE PANEL EDGE ANCHOR BOLTS AT TOP/SILL PLATE TO BOTTOM PLATE TO CAPACITY(LRFD) <br /> TYPE SHEATHING(NOTE 7) NAILING(NOTE 4) STUDS AND BLKG SILL PLATE(NOTE 8) BLOCKING/RIM(NOTE 9) BLOCKING/RIM(NOTE 4) (SEISMIC/WIND) • — � —— <br /> SW6 15/32"PLY/OSB ONE SIDE 10d COM AT 6" 2x 5/8"AT 36"O.C.-2x SIMPSON LTP4 AT 24"O.C. 16d COM AT 6"O.C.-NARROW 496 PLF/696 PLF -, <br /> SW4 15/32"PLY/OSB ONE SIDE 10d COM AT 4" 2x(SEE NOTE 5) 5/8"AT 24"O.C.-2x SIMPSON LTP4 AT 16"O.C. 16d COM AT 4"O.C.-NARROW 736 PLF/1032 PLF HW W 1 W2 VBAR CBAR info@b2engineers.COm <br /> SW3 15/32"PLY/OSS ONE SIDE 10d COM AT 3" 3x 5/8"AT 18"O.C.-2x SIMPSON LTP4 AT 12"O.C. 16d COM AT 3"O.C.-WIDE 960 PLF/1344 PLF _ _ 425-318-7047(0) <br /> SW2 15/32"PLY/OSB ONE SIDE 10d COM AT 2" 3x 5/8"AT 12"O.C.-2x SIMPSON LTP4 AT 8"O.C. 16d COM AT 2"O.C.-WIDE 1232 PLF/1724 PLF 4' 11. 9" #4 AT 16" #4X3'X3'AT 12" — — 11 Hill 425-318-0031 (C) <br /> SW44 15/32"PLY/OSB TWO SIDES 10d COM AT 4" 2x 5/8"AT 18"O.C:3x SIMPSON LTP4 AT 16"O.C.B.S. (2)12d COM AT 4"O.C.-WIDE 1472 PLF/2064 PLF 2"CLR 6' 18" 2'0" #4 AT 12" #5X4'X4'AT 12" SOIL <br /> SW33 15/32"PLY/OSB TWO SIDES 10d COM AT 3" 3x 5/8"AT 16"O.C.-3x SIMPSON LTP4 AT 12"O.C.B.S. (2)1fid COM AT 3"O.C.-WIDE 1920 PLF/2688 PLF �2 112"CLR <br /> SW22 15/32"PLY/OSB TWO SIDES 10d COM AT 2" 3x 5/8"AT 12"O.C.-3x SIMPSON LTP4 AT 8"O.C.B.S. (2)16d COM AT 2"O.C:W IDE 2464 PLF/3448 PLF 1'-0" ra DRAIN ROCK LAYER 8' 18" I 3'6" I #5 AT 12" #5X6'X6'AT 12" CBAR(ADD'L <br /> CORNERBAR <br /> SHEARWALL SCHEDULE NOTES: WATERPROOFING 10, le, 5'0. #5 AT 6" #5X8'X8'AT 6" PER SCHEDULE) <br /> PER ARCHITECTURAL - #4 HORIZONTAL AT 12" .- <br /> 1.ALL PANEL EDGES TO OCCUR OVER STUDS,PLATES,RIMS OR HORIZONTAL BLOCKING AT WALLS 16d NAILING PER SCHEDULE VBAR(PER <br /> 2.NAIL SHEATHING TO INTERMEDIATE SUPPORTS/FIELD NAILING 10d AT 12"O.C. PANEL EDGE :.8 IMPORTANT NOTES: SCHEDULE) -- <br /> 3.ALL NAILS INTO 3x MEMBERS SHALL BE STAGGERED. NAILING 10d 2x BOTTOM PLATE <br /> (2)2x STUDS MAY BE USED IN LIEU OF 3x STUDS AT PANEL JOINTS. 1.BACKFILL THE WALLS PRIOR TO FRAMING CORNER CONDITION TYPE A <br /> NAIL STUDS TOGETHER W/2 ROWS 16d COMMON AT 6"O.C.AT SINGLE SIDE SHEATHING AND NAIL SIMPSON STRAP THE FLOOR ABOVE <br /> WITH 2 ROWS OF 16d COMMON AT 3"O.C.AT DOUBLE SHEATHED WALLS. PER PLAN(MIN.OF <br /> 48"LONG) <br /> 4.COM DENOTES COMMON NAILS.MIN.NAIL PENETRATION INTO PLATE,RIM OR BLOCKING SHALL BE 1 5/811. VERTICAL SLAB ON GRADE 2.THE WALLS ARE NOT DESIGNED FOR <br /> STAGGER BOTTOM PLATE NAILING SIMPSON LTP4 BAR(VBAR) WATER PRESSURE.IF RUNNING WATER IS <br /> 5.FOR SHEARWALL SW4,ALL FRAMING MEMBERS RECEIVING EDGE NAILINGS FROM ABUTTING PANELS OR A35 CLIP PER SCHEDULE #5 AT 12"E.W. <br /> SHALL BE 3X OR(2)2X NAILED TOGETHER WITH 16d AT 6" (SEE NOTE 9) FLOOR JOIST ENCOUNTERED DURING EXCAVATION, ' SOIL <br /> PANEL EDGE PLEASE NOTIFY THE STRUCTURAL <br /> 6.WHERE SHEATHING IS APPLIED TO BOTH SIDES OF WALL,OFFSET PANEL EDGES TO FALL ON DIFFERENT STUDS. NAILING TO UPPER RIM BOARD OR BLOCKING - ENGINEER. Fr VBAR(PER <br /> 7.PROVIDE SHEAR WALL SHEATHING AND NAILING FOR ENTIRE LENGTH OF WALLS NOTED ON PLAN. TOP PLATE <br /> SCHEDULE) <br /> PROVIDE HOLDOWNS PER PLAN AT EACH END OF WALL,UNO. DOUBLE TOP PLATE 3.THE WALL CONCRETE STRENGTH SHALL ■• <br /> PROVIDE(2)2X STUDS AT ENDS OF ALL SHEARWALL.FACE NAIL MULTIPLE STUDS WITH 16d AT 12" WALL REFERENCE X DRAIN48 <br /> PROVIDE PANEL EDGE NAILING IN EACH HOEDOWN STUD AT END OF WALL. PER PLAN AND HOEDOWN PER PLAN(FOR .?- BE MIN.3000 PSI c <br /> SCHEDULE SIMPSON HDU,SEE ANCHOR a •," 'i = CBAR EADD'L q•8.ALL FOUNDATION SILL PLATES SHALL BE PT MEMBERS AND THE ANCHOR BOLTS SHALL HAVE MIN.OF 7" EMBED.DEPTH SCHEDULE) 4.MIN.REBAR SPLICE OR LAP SHALL BE 2'6" CORN R BAR 21/2"CLR SEMBEDMENT WITH SIMPSON'S BP/BPS WASHER PLATE.END OF WALL ANCHOR BOLTS SHALL BE PANEL EDGE _ ¢ PER SCHEDULE) '0LOCATED MAX 12"AND MIN 5"FROM END OF THE PLATE. NAILING10d ANCHOR BOLT PER SCHEDULE '9.WHERE NOTED IN DETAILS,USE SIMPSON A351N LIEU OF LTP4 PLATES SPACE AT 2/3 OF LTP4 SPACING. 5.WALL FOOTING SHOULD BE ON MIN. Ic <br /> PLATE WASHER NOTE 8 0'�SIMPSON HOEDOWN SIMPSON CAST IN PLACEANCHOR BOLTS' SIMPSON EPDXY ALL THREAD ANCHORS` FOUNDATION ( ) DRAIN GRAVEL - -I - — MEDIUM DENSE NATIVE$OIL.WHEN$OFTP.T.SILL PLATE 2x OR 3x WRAPPED IN _—_ 1=1 OR/AND ORGANIC SOIL IS FOUND,PLEASE <br /> HDU2 SSTB76(5/8"ANCHOR WITH 12 5/8"MIN.EMBED.) 5/8"(12"EMBED WITH SET-3G) I— _ _PER SCHEDULE FABRICS— <br /> HDU4 SIB 5/8X 24(5/8"ANCHOR WITH 18"MIN.EMBED.) 5/8"(14"EMBED WITH SET-3G) — NOTIFY THE STRUCTURAL ENGINEERHDU5 SB 5/8X 24(5/8"ANCHOR WITH 18"MIN.EMBED.) 5/8"(16"EMBED WITH SET-3G) ,n yt/ CORNER CONDITION TYPE B �HDUS SB 7/8X 24(7/8"ANCHOR WITH 18"MIN.EMBED.) - - n7"EMBED MIN. UNDISTRUBED MEDIUM DENSE NATIVE SOIL \�HDU14 SB 1X 30(1"ANCHOR WITH 24"MIN.EMBED.) FROM EDGE OF CONCRETE WALL OR COMPACTED STRUCTURAL FILLALL ANCHORS SHALL BE 2. MI <br /> �� <br /> A SHEAR/4 1WALL SCHEDULE D RETAINING WALL SCHEDULE <br /> DEL STUD BELOW <br /> TRIMMER ABOVE 2x4 A MATCH <br /> SOLID 2x4 BLKG(VERY GRAIN) AREA OF <br /> STUDSABOVE FEDERAL AVE <br /> -LLRESIDENCE <br /> " EVERETT <br /> (5)16d O <br /> TOP OF CONCRETE WALL <br /> EACH END SHEATHING AND NAILING (2)2x6 BLKG ,� ,. <br /> PERSHEARWALL SCHEDULE HEADER OR FLAT BLOCKING . <br /> BEHIND STRAP TY - <br /> 1 TRIMMER AND 2 KING STUD NAILED <br /> TOGETHER OR POST PER PLAN <br /> LEVEL OPENING HEADER r a. 3403 FEDERAL AVE, <br /> SEE HEADER `•a'. (1)#4(T&B) , <br /> SCHEDULE ALL 5FTMAX. 4X8DF#2 U.N.O. 2X6FILLERTOR.O. •�''•a EVERETT,WA 98201 <br /> AS REQUIRED "f'`-° <br /> ALL FT MAX. 4X1 DF#2 U.N.O. <br /> EXTEND STRAP <br /> 6 0 U O <br /> THE WHOLE <br /> n r.e <br /> 2 2x SILL— - 1 #4 BAR EACH SIDE <br /> () LENGTH O F <br /> :1'` •0"MIN. <br /> ALL 8 FT MAX. 4X12 DF#1 U.N.O. <br /> G <br /> CMST16 STRAP(ABOVE& , <br /> SHEARWALL ..- <br /> 2"CLR <br /> BELOW WALL OPENING) - . <br /> FULL LENGTH OF THE PANEL EDGE NAILING <br /> PROVIDE SHEARWALL(1 1/2"MIN OR 2" ALONG KING STUD -- - ' <br /> NOTE: MAX FROM ROUGH OPENING <br /> BLOCKING ) FULLLENGTH <br /> AT STUD/PLATE <br /> UNDER POSTS TYP. - <br /> CONNECTION,PROVIDE <br /> (4)Sd TOENAIL OR - <br /> (2)16d END NAIL <br /> TYP.WALL PENIN FRAMIN HEAR WALL OPENING STRAPPING N .WALL OPENING REINFORCINGp O G G S O GS G nC0 C O G <br /> 3/4"=1'-0" C 3/4"=1'-0" 1/2"=1'-0" <br /> DRAWING INFO <br /> ISSUE DATE 08-24-23 <br /> ISSUED FOR PERMIT <br /> PROJECT N0.22082 <br /> ENGINEER BB <br /> REVISION SCHEDULE <br /> NO. I DATE IDESCRIPTION <br /> 1 09-16-22 1 PILE REVISION <br /> FRAMING <br /> SCHEDULES AND <br /> DETAILS <br /> S-4 <br /> CoFYh9ht b2 Structural Engineers 2008 <br />