My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 2/16/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell 2/16/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 3:58:27 PM
Creation date
2/19/2025 3:58:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
2/16/2025
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jeff Mars
Subject / Project Title
WFP eOM SharePoint Site & AM/Maintence Program Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004299
Total Compensation
$274,876.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell 4/16/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett AM Quick Wins and T&D eOM SharePoint | Scope of Work <br />7 <br />DRAFT_Quick Wins and TD eOM <br />•Collect the required attribute data of 1,000 assets within the WFP and WPCF. Data collected will <br />consist of the attribute items defined and confirmed in the asset data framework as well as <br />spatial data. <br />•QA/QC of the asset data collected. <br />•Label assets once the data has been collected and QA/QC’d. <br />•Present the pilot results in a Post-Pilot workshop. Discuss lessons learned and necessary <br />process changes. <br />•Prepare Technical Memo on results of Pilot Collection. <br />Task Assumptions <br />•The Pilot data collection and labeling is anticipated to last 2-3 weeks with the BC Team utilizing <br />2 resources for the first 2 days of collection, and then 1 resource for the remaining days. <br />•Field collection will consist of 8-hour days and can be based on Everett plant resource shift <br />schedule. <br />•Up to 2 photos per asset will be captured (picture of asset, name plate). <br />•Post-Pilot workshop will be scheduled for up to 2-hours and attended by 3 BC Team members. <br />Post-pilot workshop will occur virtually. <br />•Where available, data collection will occur via an online connection through WIFI connectivity. In <br />cases where WIFI connectivity is not available, data collection will occur in an offline mode with <br />connecting to WIFI on a regular basis to sync updates. <br />•Data will be collected on mobile devices supplied by BC. <br />•Expenses include travel as well as labeling equipment and software, labels, needed field <br />supplies. <br />•BC will not conduct condition assessments on the equipment being collected. <br />•BC will not attempt to access any locations that require confined space entry or any other <br />specialized training. <br />•BC will not attempt to operate or open any equipment on site. BC will only conduct a visual <br />inspection of the equipment for data collection purposes. <br />•BC will affix labels. Label location will be confirmed with City staff to identify safest location. <br />Everett Responsibilities <br />•City resources will be available and nearby the entire time during the field collection. <br />•City resources will be available to assist, answer questions or clarify items presented by the field <br />collection team. <br />•City staff will identify site hazards to BC staff and identify appropriate PPE. <br />•Attendance at the Post-Pilot workshop. <br />Meetings <br />•On-Site Safety coordination meetings prior to conducting the field collection. <br />•Virtual Post-Pilot workshop presenting the results of the field collection including lessons learned <br />and any instances will require a change to the process. <br />Work Products <br />•Field collected data populated into the City’s GIS. <br />•Labels attached to those assets that have been collected.
The URL can be used to link to this page
Your browser does not support the video tag.