My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 2/16/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell 2/16/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 3:58:27 PM
Creation date
2/19/2025 3:58:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
2/16/2025
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jeff Mars
Subject / Project Title
WFP eOM SharePoint Site & AM/Maintence Program Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004299
Total Compensation
$274,876.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell 4/16/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett AM Quick Wins and T&D eOM SharePoint | Scope of Work <br />10 <br />DRAFT_Quick Wins and TD eOM <br />•AM Adoption workshops will be scheduled for up to 2-hrs and be attended by 2 BC Team <br />members. The workshops will be virtual. <br />•AM Adoption Plan review meeting will be scheduled for up to 1-hr and be attended by 2 BC Team <br />members. The meeting will be virtual. <br />Everett Responsibilities <br />•Participate in interviews, AM Adoption Plan workshops, and AM Adoption Plan review meeting. <br />•Review and provide feedback on AM Adoption Plan. <br />Meetings <br />•AM Adoption Plan Workshops <br />•AM Adoption Plan Review Meeting <br />Work Products <br />•Stakeholder analysis matrix <br />•AM Adoption Plan <br />•AM FAQ sheet <br />Phase 800 – T&D eOM SharePoint <br />Phase 800 includes all work to develop the Transmission and Distribution eOM SharePoint. <br />Task 801 – Transmission and Distribution eOM Platform Approach <br />Objective: Develop Transmission and Distribution eOM SharePoint structure and content migration <br />approach. Setup baseline eOM SharePoint platform. <br />Activities/Approach: This task includes the following activities: <br />•Develop a SharePoint architecture that provides structured content migration and population. <br />•Facilitate workshop with City staff to review: <br />o SharePoint development steps <br />o SharePoint architecture <br />o Responsibilities for collecting, cataloging, reviewing, and migrating information <br />•Develop a draft eOM SharePoint Structure and Content Migration Plan that summarizes <br />feedback from the workshop, outlines the SharePoint structure, and summarizes the tasks to be <br />completed, content prioritization, and work assignments for content migration execution. After <br />City comments are received, finalize the Plan. <br />•Conduct coordination meeting(s) with the City to coordinate configuration of the SharePoint site. <br />Task Assumptions <br />•SharePoint Structure and Content Migration Approach Workshop will be scheduled for 1 hour <br />and be attended by up to 3 BC Team members. The workshop will be virtual. <br />•Up to two (2) coordination meetings will be scheduled for 1 hour and be attended by up to 2 BC <br />Team members. The meeting will be virtual.
The URL can be used to link to this page
Your browser does not support the video tag.