My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 2/16/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell 2/16/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 3:58:27 PM
Creation date
2/19/2025 3:58:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
2/16/2025
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jeff Mars
Subject / Project Title
WFP eOM SharePoint Site & AM/Maintence Program Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004299
Total Compensation
$274,876.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell 4/16/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett AM Quick Wins and T&D eOM SharePoint | Scope of Work <br />11 <br />DRAFT_Quick Wins and TD eOM <br />Everett Responsibilities <br />•Participate in workshop <br />•Review and comment on eOM SharePoint Structure and Content Migration Plan <br />•SharePoint site creation <br />Meetings <br />•SharePoint Structure and Content Migration Approach Workshop <br />Work Products <br />•Workshop facilitation including agenda and meeting minutes, draft and final <br />•SharePoint Structure and Content Migration Plan, draft and final <br />•Configuration of Transmission and Distribution eOM SharePoint site <br />Task 802 – Development, Content Ingestion, and Quality Control <br />Objective: Create SharePoint site, manage the content ingestion, provide quality control and <br />oversight of the data and information population. <br />Activities: <br />•Create and configure SharePoint site. <br />•Ingest data and documentation into eOM platform. <br />•Populate metadata and create views for all new data <br />•Review quality and content ingestion focused on the usability, applicability, and completeness to <br />provide effective O&M support of the users. <br />Task Assumptions <br />•SharePoint site will have eight (8) chapter pages for the major components of the system, and <br />one home page. <br />•BC will develop a “draft” chapter page for approval by City before proceeding with remaining <br />seven (7) process pages. <br />•Up to two (2) coordination meetings will be scheduled for 1 hour and be attended by up to 2 BC <br />Team members. The meeting will be virtual. <br />Everett Responsibilities <br />•Prepare documentation for ingestion into SharePoint site. <br />•Review and approve of process page layout. <br />•SharePoint site styling and branding <br />Meetings <br />•Coordination calls, as needed. <br />Work Products <br />•Summary comments on review stages
The URL can be used to link to this page
Your browser does not support the video tag.